Loading...
HomeSearchMy WebLinkAboutBLDE-24-1422BLDR-23-11070BLDR-24-23418 Channel Point Drive - Foundation, Floor Section Elevation18 Channel Point Drive - Framing Plan18 Channel Point Drive 2nd Floor Framing RepairsAuthorization for Tent - 10-8-2019BLD-17-2120BLD-17-4524BLD-20-1935BLD-21-2797BLD-79-020BLD-88-790BLD-94-577BLDE-23-004635Building PermitsBuilding Permits (2)Building Permits (3)Building Permits (4)Building Permits BackfileCorrespondence Re: Final Gas Inspection - 5/16/2017E-17-2719E-17-4896E-19-1339E-19-2257G-02-324G-08-397G-19-2288Inspection LetterP-02-222P-17-2497P-19-2290TR-18-7230