HomeMy WebLinkAbout23-16_1ENGINEERING DEPT. COP
Foundation Location Approver:
oa o RECD►VE
V 6.
°s / OCT 2 4 2008
Q �h'
CONCRETE X BULDING DEPT
FOUNDATION
CONCRETE
FOUNDATION
STA LOT 6
11,764 SFt
DCE
FOUNDATION PLOT PLAN
PREPARED EXCLUSIVELY FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT, NOT FOR ANY OTHER USE
LOCATION 72 PINE CONE DRIVE WEST YARMOUTH, MA
SCALE : 1" = 30' DATE OCTOBER 16, 2008
REVISED DATE : OCTOBER 24, 2008 — ADD 4FT WALLS
REFERENCE : ASSESSOR'S MAP,2�PARCEL 16 PREPARED FOR:
LOT 6 LCP 11435-A23 STEVEN & L l
I HEREBY CERTIFY THAT THE STRUCTURE OFM
SHOWN OTHIS
SHOWN HIS EREON LOCATED ON THE �tH ✓ISS
GROUND AS9c
m m w m 02 TIMOTHY
4 H.
COVELL
� No.30035
down cape engineering, in c. 9
Yj C/NL ENCINFERS
LAND SURVFYORS
939 M.. St—t - YARMOU] PORT, MASS DATE REG. LAN