HomeMy WebLinkAbout29-87_1ASHED
r0A OT
k
9.5'
JOB# 04-042 Y OR161NALLY
a
CONCRETE
FOUNDATION
RGPLALING 'DEMOLISHED
TF=9.5' DWI
REMAINING
ORIGINAL
STRUCTURE
Gb
103.5fi
PRINCE ROAD
CERTIFIED FOUNDATION PLAN Mc CHAMfa5 IM G.t.%.
FOR THE PURPOSE OF OBTAINING A BUILDING PERMIT
PREPARED FOR:
LOCATION 44 PRINCE AVENUE ROBERT BAKER
(WEST) YARMOUTH, MASS.
SCALE 1" = 20' DATE : MAY 12, 2005
REFERENCE : L.C.P.21898B
ASSESS. MAP 29 PCL 87
1 HEREBY CERTIFY THAT THE STRUCTURE L111OF MqCn
SHOWN ON THIS PLAN IS LOCATED ON THE
GROUND AS SHOWN HEREON. �O
DANIEL s
� A 1
G. 508-362-4541 OJALA oo
fa. 508-362-9880 #40980 00
down cope engineering, inc.CIVIL ENGINEERS
LAND SURVEYORS
939 main st. yarmouth, ma 02675 DATE REG. LAND SURVEYOR