HomeMy WebLinkAbout111-11_1Sr�
26 91 0�0 96.00
Na
TO THE BEST OF MY INFORMATION,
KNOWLEDGE, AND BELIEF THE
FOUNDATION SHOWN ON THIS PLAN
HAS BEEN LOCATED ON THE GROUND
AS INDICATED.
L2Y10
DATE PROFESSIONAL LAD SURVEYO1
. gX010
TOP OF FOUNDATION IS 2.0'
ABOVE HIGH POINT IN ROAD.
"AS -BUILT" PLOT PLAN
S. YARMOUTH, MASS.
LOT 59, L.C. 32679
DATE JULY 23, 2010 SCALE
JOB 2208-00 CLIENT DAVENPORT
SWEETSER ENGINEERING
203 SETUCKET ROAD
PO BOX 713 SOUTH DENNIS, MA 02880
'f. SOB-385-BBOO fax. SOB -385-8891
G'�S81PROJI2208-00�dwo12208-CPPI.DW 0 2010 SWEETSER ENGINEERING