2014 Oct 29 - Letter from Sweetser Engineering Re: Perc. Rate203 SETUCKET ROAD - P.O. BOX 713 — SOUTH DENNIS — MASSACHUSETTS 02660
TEL (508) 385-6900 E-MAIL sweetsereng@aol.com FAX (508) 385-6991
LAND SURVEYING — ENGINEERING —TITLE 5 SEPTIC SYSTEMS
October 29, 2014
Bruce G. Murphy, Health Director NOV 17 1014
Yarmouth Health Department HEALTH DEPT
1146 Route 28
South Yarmouth, MA 02664
Re: 200 Springer Lane, West Yarmouth
Proj: 7349-00
Dear Bruce
Today you and I did an percolation test in the bottom of the proposed soil absorption system.
The resulting percolation rate was greater than 3 minutes per inch, but less than 4 minutes per
inch.
As the system was designed at a percolation rate of less than 5 minutes per inch, theser is no
need to alter the design. If you have any questions, please call.
Very truiv Vours,
Robin W. Wilcox
Soil Evaluator, SE -2594