Loading...
2014 Oct 29 - Letter from Sweetser Engineering Re: Perc. Rate203 SETUCKET ROAD - P.O. BOX 713 — SOUTH DENNIS — MASSACHUSETTS 02660 TEL (508) 385-6900 E-MAIL sweetsereng@aol.com FAX (508) 385-6991 LAND SURVEYING — ENGINEERING —TITLE 5 SEPTIC SYSTEMS October 29, 2014 Bruce G. Murphy, Health Director NOV 17 1014 Yarmouth Health Department HEALTH DEPT 1146 Route 28 South Yarmouth, MA 02664 Re: 200 Springer Lane, West Yarmouth Proj: 7349-00 Dear Bruce Today you and I did an percolation test in the bottom of the proposed soil absorption system. The resulting percolation rate was greater than 3 minutes per inch, but less than 4 minutes per inch. As the system was designed at a percolation rate of less than 5 minutes per inch, theser is no need to alter the design. If you have any questions, please call. Very truiv Vours, Robin W. Wilcox Soil Evaluator, SE -2594