HomeMy WebLinkAbout2014 Feb 06 - Email to Sweetser Engineering , . , Page 1 of 1
vonHone, Amy
From: vonHone, Amy
Sent: Thursday, February 06, 2014 4:16 PM
To: 'Robin'; 'SweetserEng@aol.com'
Subject: 200 Springer Lane
Robin-
I don't think you need the third 2000 gallon septic tank proposed right before the pump chamber since each house
� is being serviced by their own septic tank. If both houses were flowing into the same primary tank, you would
�' need a two compartment tank or two tanks in series in that case. By eliminating the tank, you will need to piace
effluent filters in the outiet tees of the primary tanks. Also, label the size of the pump chamber in the system
'�1ioi�profile (1000?) and add the detail you usually give us showing the level of the pump and alarm floats in inches.
� Y \
Call or email with questions.
Thanks, Amy
Amy L.von Hone, R.S., C.H.O.
Assistant Health Director
Yarmouth Health Department
1146 Route 28
South Yarmouth, MA 02664
(0) 508-398-2231 X1241
(F) 508-760-3472
avon hone@yarmouth.ma�s
2/6/2014