Loading...
HomeMy WebLinkAboutEngineered Plan - 2014T.O.F. @ EL. 50.0 i IN5TALL R15ER5 * COVER5 TO PIPE5 TO BE LAID LEVEL FOR 21' LAYER OF DOUBLE WASHED P'"ASTONE WITHIN G" OF FINISH GRADE 2' OUT OF D15TRIDUTION BO OVER 3/4" I I/2" DOUBLE WASHED STONE (SEE PLAN VIEW FOR LOCATIONS ALL AROUND WATER TE5T D -BOX FOR � I. LEVELNE55 * FLOW r EQUALIZATION EL. 49.0EL. 49.0 _� — EL. 49.0 4" 5CH 40 PVC0 PVA TOP @ EL. 4G.7 4" SCH 40 PVC I O" 14" �-45.0 47.5 II (3) 500 GALLON Pf�',ECAST DRY�F✓i<LLS INSTALL GAS BAFFLE 47.1 7 47.00 L _. BOTTOM @ EL. 44.00 IN OUTLET TEE 47.25 4G.00 DE3-G i EXISTING 1000 G,4,L. H-20 G POLYETHELYNE INSTALL Di5TRIBUTION SEPTIC TANK BOX ON G" LAYER OF CRU5HED STONE -i BOTTOM Th @ EL. 35.0 i- SEPTIC SYSTEM PROFILE � DESIGN BATA _ i [,'Al LY FLOW: (3) BDRNi5 x I 10 GPD = 330 GPD 1, SEPTIC TANK: 330 GPD x 200% = GGO GPD " USE: EX15T ING 1 000 GAL. POLYETHYLENE TANK 1)15TRIBUTION BOX: U5E: (G) OUTLET DITRIBUTION BOX (H-20) '15011- ABSORPTION SYSTEM: USE: (3) 500 GAL. PRECAST DRYWELLS LINED j1 w/4' OF DOUBLE WASHED STONE ALL AROUND (";APACITY: 51DEWALL.: 93 x 2 .x 0.74 = 137.G GPD BOT-OIVI: 33.5 x 13 x 0.74 = 322.3 GPD 49` EXISTING 1000 GAL LEACH PIT TOT AL: 459.9 GPD TO 6E PUMPED DRY '� REMOVED, 'ALONG WITH ANY CONTAMINATED \moo . ✓�� SOIL �`.p �® GENERAL NOTES p� 49.2i0 J �o \ �T" °0 1. SEPTIC15Y5TEM 15 TO BE INSTALLED IN ACCORDANCE WITH ° 49. I EXISTING 1000 GAL. 3 10 CMR 15.00: TITLE V POLYETHELYNE J 2. THI5 SEPTIC SYSTEM 15 NOT DESIGNED FOR THE USE OF A 5EPTIC TANK i GARBAGE DISPOSAL. 3. THI5 PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. CONTP,�CTOR SHALL PROVIDE 48 HOUR NOTICE TO DE51GN ENGINEER FOR ANY REQUIRED INSPECTIONS. 5. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ANY 49.0 UTILITY; ABOVE OR UNDERGROUND, PRIOR TO ANY EXCAVATION f OR CONSTRUCTION. �e \\ \y "ate QAl� REN yG , C �. �s _ -4- '-"o o RU35t 1 �a.114�0= i' iO 0>1STS R OLLA� . l •UCt. Q k L cas :a3¢:uC4l'd heW1til JI.!'epa 1rinent Ian j- s 7iJ O 1 ® .o E y1 -v I 9 PREPARED FOR KAREN REINO w zau 501L SOILL SOI COLOR Lu OTHER SUROM pAeF HORIZON FEXI-URE (MUN5ELL) DEEP OBSERVATION HOLE LOGS O' - 7" / 1 2" i ' -32. 132' FILL A B C FILL LOAMY SAND LOAMY SAND MEDIUM 5AND DATE: 04- 1 G-2014 TEST BY: D. MEYER, R.5. Locus o z f } r O �i m W r (J) y - II NOTE: TH15 PROPERTY LIES WITHIN ZONE II NO INCREASE TO EXISTING FLOW PROPOSED. i T.O.F. @ EL. 50.0 i IN5TALL R15ER5 * COVER5 TO PIPE5 TO BE LAID LEVEL FOR 21' LAYER OF DOUBLE WASHED P'"ASTONE WITHIN G" OF FINISH GRADE 2' OUT OF D15TRIDUTION BO OVER 3/4" I I/2" DOUBLE WASHED STONE (SEE PLAN VIEW FOR LOCATIONS ALL AROUND WATER TE5T D -BOX FOR � I. LEVELNE55 * FLOW r EQUALIZATION EL. 49.0EL. 49.0 _� — EL. 49.0 4" 5CH 40 PVC0 PVA TOP @ EL. 4G.7 4" SCH 40 PVC I O" 14" �-45.0 47.5 II (3) 500 GALLON Pf�',ECAST DRY�F✓i<LLS INSTALL GAS BAFFLE 47.1 7 47.00 L _. BOTTOM @ EL. 44.00 IN OUTLET TEE 47.25 4G.00 DE3-G i EXISTING 1000 G,4,L. H-20 G POLYETHELYNE INSTALL Di5TRIBUTION SEPTIC TANK BOX ON G" LAYER OF CRU5HED STONE -i BOTTOM Th @ EL. 35.0 i- SEPTIC SYSTEM PROFILE � DESIGN BATA _ i [,'Al LY FLOW: (3) BDRNi5 x I 10 GPD = 330 GPD 1, SEPTIC TANK: 330 GPD x 200% = GGO GPD " USE: EX15T ING 1 000 GAL. POLYETHYLENE TANK 1)15TRIBUTION BOX: U5E: (G) OUTLET DITRIBUTION BOX (H-20) '15011- ABSORPTION SYSTEM: USE: (3) 500 GAL. PRECAST DRYWELLS LINED j1 w/4' OF DOUBLE WASHED STONE ALL AROUND (";APACITY: 51DEWALL.: 93 x 2 .x 0.74 = 137.G GPD BOT-OIVI: 33.5 x 13 x 0.74 = 322.3 GPD 49` EXISTING 1000 GAL LEACH PIT TOT AL: 459.9 GPD TO 6E PUMPED DRY '� REMOVED, 'ALONG WITH ANY CONTAMINATED \moo . ✓�� SOIL �`.p �® GENERAL NOTES p� 49.2i0 J �o \ �T" °0 1. SEPTIC15Y5TEM 15 TO BE INSTALLED IN ACCORDANCE WITH ° 49. I EXISTING 1000 GAL. 3 10 CMR 15.00: TITLE V POLYETHELYNE J 2. THI5 SEPTIC SYSTEM 15 NOT DESIGNED FOR THE USE OF A 5EPTIC TANK i GARBAGE DISPOSAL. 3. THI5 PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. CONTP,�CTOR SHALL PROVIDE 48 HOUR NOTICE TO DE51GN ENGINEER FOR ANY REQUIRED INSPECTIONS. 5. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ANY 49.0 UTILITY; ABOVE OR UNDERGROUND, PRIOR TO ANY EXCAVATION f OR CONSTRUCTION. �e \\ \y "ate QAl� REN yG , C �. �s _ -4- '-"o o RU35t 1 �a.114�0= i' iO 0>1STS R OLLA� . l •UCt. Q k L cas :a3¢:uC4l'd heW1til JI.!'epa 1rinent Ian j- s 7iJ O 1 ® .o E y1 -v DEPTH r a me Dzte PREPARED FOR KAREN REINO SCALE: 1 " _ 20' zau 501L SOILL SOI COLOR SOI'_ OTHER SUROM pAeF HORIZON FEXI-URE (MUN5ELL) DEEP OBSERVATION HOLE LOGS O' - 7" / 1 2" i ' -32. 132' FILL A B C FILL LOAMY SAND LOAMY SAND MEDIUM 5AND DATE: 04- 1 G-2014 TEST BY: D. MEYER, R.5. WITNE55: A. VON HONE, HEALTH AGENT 6 PERC RATE: < 2 MIN. / INCHn� =� Q.. DEET OB5ERVATION HOLE # I EL. 49,0 o , �1 �` DEPTH FOR G LAKEFIELD RD., SOUTH YARMOUTH, MA PREPARED FOR KAREN REINO SCALE: 1 " _ 20' DATE: 04-24-2014 501L SOILL SOI COLOR SOI'_ OTHER SUROM pAeF HORIZON FEXI-URE (MUN5ELL) MOTTLING O' - 7" / 1 2" i ' -32. 132' FILL A B C FILL LOAMY SAND LOAMY SAND MEDIUM 5AND I OYR4/ 1 I OYRG/8 2. YG UO Li ^x ' L¢ C NO""E: NO GROUNDWATER ENCOUNTERED SITE SEWAGE FLAN FOR G LAKEFIELD RD., SOUTH YARMOUTH, MA PREPARED FOR KAREN REINO SCALE: 1 " _ 20' DATE: 04-24-2014 DRAWN BY: TMW J013 NUMBER: REVISION: 511EET NUMBER: I SP- I WELLER *- ASSOCIATES I G45 FALMOUTH RD., SUITE F9 P.O. BOX 4 1 7 CENTERVILLE, MA 02@32 TELEPHONE: (508) 328-4692 EMAIL: trlsweller@cgmall.com REGISTERED LAND SURVEYORS t ENVIRONMENTAL CONSULTANTS