Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2015TOP OF FOUNDATION ELEV. -100-001_- (AS$UMEQ) 30' 10 FT. MINIMUM 4" CAST IRON PIPE PITCH Q1 /4") PERIMUFTM 20 FT. MINIMUM FROM 10 FT. -MINIM CONCRETE' COVERS ~-Jj FLOW LINE CRAWL SPACE SLAB 4" SCHEDULE 40 PVC PIPE MIN. WITCH 1/8" PER FT. 9 SOII ST DATE OF �,SOI� TEST MA 14 201 $OII. TEST DONE `BY SW ETSR EN IN RING CLEAN SAND WITNESSED eY A• VON HANE- ---r-- INSPECTION LOAM0RT AND SEED OBS�RYATION H=_ ELEV,_ �8•� 2" LAYER OF PPRCOLATION RATE < -24-_ MIN./INCH AT58 _ INCHES 1/8" TO 1/2" WASHED STONE 00.20 MAX OR FILTER FABRIC 7.95 MIN. NOT TREQUIREQ TEE II --- - -.- __ LEGEND: EXISTING SPOT ELEVATION 00.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR O SOIL TEST LOCATION UTILITY POLE -'o- TOWN WATER -W-W� CATCH BASIN �® j GAS LINE G CESSPOOL O C.P. CLEANOUT 0, DEPTH ELEV.'v = MIN. COLOR MOTT. OTHER ELEV. • E0" 2 900 L VEL o 0 o 10YR6/1 ELEV. _ �- 5-•26" B ELEV. _ _ 96�Q7 6" S MP ELEV. = _K- ROOT$ 26-120" C COARDE SAND BAFFLE 5 GRAVELS DISTRIBUTION R ELEV. LIQUID OUTLET pox lfuu.: = 14 INCHES 19 INCHES5V (TO BE PLACED ON FIRM BASE) nD GALLON TO BE WATER TESTED IF MOq.E THAN ONE OUTLET -4-FEE T 5 FEET 6 FEET 8 FEET 24 INCHES 34'INCHES SEPTIC TANK (TO ,BE PLACED ON FIRM BASE) 3/4" TO 1 1 /2" CLEAN DOUBLE WASHED STONE FREE OF FINES ac SILT SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE II --- - -.- __ LEGEND: EXISTING SPOT ELEVATION 00.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR O SOIL TEST LOCATION UTILITY POLE -'o- TOWN WATER -W-W� CATCH BASIN �® j GAS LINE G CESSPOOL O C.P. CLEANOUT 0, DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-5" ' Ap LOAMY SAND 10YR6/1 0 ROOT 5-•26" B LOAMY SAND 10YR6/6 ROOT$ 26-120" C COARDE SAND 2.5Y7/4 5 GRAVELS 97.$: 90.0 8P.2___ . 7.20 Cn -WATER ENCOUNTERED AT _ ELEV. _ _'90?,_ 01Q. 0 95.87 DESIGN CALCUL AI ION$ ELEV. _ __r NUMBER OF BE4ROQMS GARBAGE DISPOSAL UNIT TOTAL ESTIMATED FLOW 3 330_ GAL./PAY 4 HIGH . CAPACITY INFILTRATORS WITH (110 CAI.. /DAY X _�. BR) STONE IN AN z REQPIRED SEPTIC TANKOAPIACITY :199- Ct. GAL WELL A1W 2 ACTUAL SIZE QF SEP TIC A 11 X36 k 100 TRENCH FORMATION 5.07 ZONE'-�- i SOIL CLASSIFICATION �---- SOIL ABSORPTION _�_ MIN:/IN. INDEX 0.9 (4/2010 DESIGN PERCOLATION RATE ADJUST •8 %�/'/c3� AC'S EFFLUENT LOAFING RATE !� GAL./PAY/S.F. (� LEACHING AREA SR FT SYSTEM (SAS) (11X36)+(47X2X1p/12) LEACHING CAPACITY (AREA X RATE) 35140,9 4AL./DAY 90.8 474.33 X 0.74 USGS PROBABLE WATER TABLE ELEV, _ RESERVE LEACHING CAPACITY qAL./DAY OBSERVED WATER TABLE BOTTOM OFTESTHOLE ELEV. _ dK2 N QTS, 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO O,E.P. TITLE � AND THIr :TOWN'S RULE$ ANQ'REGULATIONS FOR A OF SEWAGE LOT j63A 15, 676..3 f S F. 98.10 "SOIL \ Q. TEST BOX 11 98.2 x 98.1 �' DRIVE Op• \ C) 1500 GALLON o0 • 100.0 O SEPTIC TANK \ - 200• a a o _I OHO 95.7 " 98.6 98.5 lOpO L 98.5 98 S 98.2 • U97. IS . 90.67' ___--•l97 0 ___-- g E.jN�'�LN A VENUE' 96.2 0 THE SUBSURFACE ularVa 2. ALL COVERS TO SANITARY UNITS SHALL BE BRPUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H•-10 LOADING UNLES$ THEY ARE, UNDER OR WITHIN 10 FT. OF QRIVE5 OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 1Q FT. OF DRIVES OR PARKING' AREAS. 4. ANY MASONARY UNIT$ USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT 15 TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-$88-�44-7233 AT LEAST ?2 HOURS PRIOR TO COMMENCING WORK ON SITE.` 7. CONTRACTOR IS TO VERIFY GRADES. AND ELEVATIONS AS .WELL 'AS SITE CONDITIONS PRIOR TO COMMENCING N(ORK ON $ITE ANY VARIATION, IS TO BE ..BROUGHT TQ THE, ATTENTION OF, THE DESIGN ENGINEER 1Y IMMEDIATELY. 8. PARCEL IS 1N FLOOD ZONE 9. LOT-..lS-SHOWN QN A5cESSOR9 MAP -:54 AS PARCEL 1Z 10. EXISTING CESSPQOLS (3) ARE TO BE PUMPED AND REMOVED AONQ WITH ANY POLLUTED SOILS ENCOUNTERED. Ptrmit valid for REPAIR OF SEPTIC SVSTIEM ONLY due to State and Local septic variances. Curd of flef'Sh review and alIproval is required fair t3 % any future add itions/renovations/aIterations to X09 R�5 3%r tiF �s , sewage facilities -and/or structures/dwelling. ROS!r ' 2 ?' t' Yae'mooh flealfh Di*partment WI �.r> .�. �� = r `i4i3Q1� > Es 979 / IS 1011 '7i �- w Date, AP R6VPD: BOARD. of HEAL'I - JUN 2 a 2U15 HEAL TH DEPT. DATE AGENT oil ST YARMOUTH, MASS.. 3$ I, COLLA AW., LST 83 JtrFFERSON LOC. 'EST YARMOUM ASHINGTON �+ W 203 SETUCKEfi ROAD 508- P. 0. BOX 713 ca 385-6900 SOUTH DENNI$, MASS. 02660 Q o o Locus - SCALE LINCOLN o DATE MAY 1$, X015 �" = 20' REV JOR NO! r 29 � �// JUNE 18, X015 TI pN MAP REv. $MEET 1 OF 1 �ocA G• S9 PR J 7. 61-00 dw 7561-SAS1.L1wG Q 2015 SWIrETSER ENGINEERING