Loading...
HomeMy WebLinkAboutSeptic System Design Decision 3168G� ro 6a LOCUS ROUTE 6 LOCATION MAP LOT 4 20,322 SF PROPOSED FENCE 1 I 1 ASSESSORS HAP: 94 PARCEL: Z4 CURRENT ZONING: R-40 (1980 SUBDIVISION) BUILDING SETBACKS: F: 30' S: 15' R: 20' FLOOD ZONE: C �i r ,I j 1 FENCE LINE j+17. f � WW�STING a Og, 18 20 21 19 1 z1.8 KEY: EXISTING CONTOUR: - PROPOSED CONTOUR: ........................ • • • • • . EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE: - UT ILITY POLE: --o- FENCE -o-FENCE LINE: HYDRANT: -6 DM # 94_108_ + i 16.2 17- �18 ` 19 '0. 1 TEST HOLE LOGS ENGINI,'ER: THOMAS MCLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 9-28-94 PERCOLATION RATE: < 2 MIN/IN TH"-1 TH-2 18.7 TOP ELEV 24" SUBSOIL 16.7 MEDIUM -FINE SAND ...... ............. .14J 78" i 122 10.7 8.7 211 TOP & ELEV SUBSOIL I n. FINE SAND ," ..14.5 114" 1 111.6 120" 11.1 COARSE SAND NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NGVD +�,) 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 LOADING SPECIFICATIONS. 5. PIPE PITCH = 114" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE LAID LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE ADJUSTED USE OF A GARBAGE DISPOSAL. GROUNDWATER 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE ELEV = 14S STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW. 11. PROPOSED WATER SERVICE TO BE, 10' (MINIMUM) FROM SEPTIC SYSTEM, SGS GROUNDWATER ADJUSTMENT: WELL: A1W-230, ZONE. C, ADJUSTMENT. 3.4' SEPTIC SYSTEM DESIGN FLOW ESTIMATE: EDROOMS AT 110 GAL/DAY/BEDROOM = 330 GAL/DAY SEP IC TANK: 330 GAL/DAY * 1.5 DAYS = 495 GAL USE 1000 GALLON SEPTIC TANK UTILITY CLUSTER LEAC'YING AREA: TTCv ? L Tl1TArnTDL'TTC/1DC TITTT:I Inv nr C,-rnuTi' y-� �z1.s EDGE OF PAVE 21121-0 �- CATCH BASIN TEMPORARY CUL-DE-SAC BENCHMARK AT CONC. BOUND ELEV = 20.6 �2& x & x 0.96' DEEP) SIDE AREA: 128 + 8)2 x.96 = 69 SF (2.5) = 172 GAL/ DAY jBOTTOM AREA: 28 x• 8 = 224 SF (1.0) = 224 GAL/DAY TOTAL CAPACITY = 396 GAL/DAY h d SEPTIC SYSTEM SECTION COVERS WITHIN 12" 24,5 OF FINISHED GRADE TOP OF FOUNDATION 7rr-oUT SCREEN PORCH 114' PROPOSED 3 BEDROOM 2811 DWELLING GAR. 1�® 28' PROPOSED DWELLING 28' 2" PEASTONE OF 3/4" - 1 1/2" WASHED STONE J_ M IL r \v2-0-55 11, F 18.5 I 20.8 1000 GAL ELEV. D -BOX 19.76 <2 ELEV. ELEV. SEPTIC TANK 19.93 ELEV, 28' 21.0 4 ELEV. ELEV.'1, TEE SIZES: f9,4g 3 FLOWDIFFUSORS WITH 2' OF 4.0' INLET: 6" UP, 10" DOWNELEV. STONE (28' x 8' x 0.96' DEEP) OUTLET: 6" UP, 19" DOWN ADJUSTED GROUNDWATER ELEV = 14.5' DM �_ DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 026%0 I SITE AND SEWAGE PLAN LOCATION. • 20 DEV EAU LANE I YARMOUTHPORT, MA PREPARED FOR - JOANNE WHITE SCALE: 1" = 30' DATE: 11-9-94 REFERENCE: PLAN BOOK: 347 PAGE: 44 I 0