HomeMy WebLinkAboutDecision 3556 - Septic and Site PlanLOCATION OF TEES MUST BE
DIPECTLY UNDER OPENING,
MIRAn 14ON OVERUA IV
-
FABPIC OVER
MIRAFI 140N FABRIC OVER
H-
- 4" PEASIONE
4" MIN. PEASTONE -
PRECAST
SLOTTED H-20
t2`0 SLOttEO H=20
RISERS
AS REO.
12"0 HDPE
CURRUCATED HDPE PIPE
ADS N-12 OR EO.
ADS N— t 2 C'R EQUAL
75 =t.5" DOUBLE
2.0' (NP.)
wA5HE0 STONE
COMPACTED 6" LIFTS
6,0
-
SLOTTED H -"LG INVERT USifD
H-20
.
12.0 HDPE
600 GAL,
LEACHPIT
-
2'
—
SHOREY OR EQUAL
e"
TRENCH CROSS SECTION
-
—
�-STRUCTURE.
WASHED STONE UNDERr
COMPACTED
ATH _ _(
�—
NTS
NOTES REMOVE ANY
UNSUITABLE SOILS
FOUND FOR 5' MIN.
AROUND LEACHING.
3/4- - 1 1/2-
"X" LEACHING TRENCH
WASHED STONE (1",)
4' MIN AROUND PIT
BETWEEN STRUCTURES
SEE TRENCH CROSS SECTION
WIDTH
Ta T� VARIES
M 1
EWEF q a" THICK POF.TIAND CEMENT
Tm� BRISTLE BROOM FINISH I�
SIOEWA[k- W,/W.W.F. WHERE SHOWN
"' S.`• `+j% SCOPE SECTIONS AT 4.5'. PRECAST CONCRETE CURBING 6" REVEAL
\;•, q R Si / 6" LOA6! & SEED EXPANSION JOINTS AT 18' O.C. I AROUND BUILDING AND AS SHOWN
ALL DISTURBED
EXPANSION JOINT I OUPASTONE 5000 PSI OR. EQUAL
AREAS (TTP,)_ MATERIAL 6.5"
\ 1" TOPCOAT MASS I
PITCH 2>a � <
�i AWAY FROM BLDG. \� TYPE II
• e . 2" BINDER
6 %6"—x'10 WIRE MSN 000a oo°°°°000000�o�oo o°000Q�oo�000000 OJ °'n°o °oc000°o¢�oo°0000
°° ~• o c°�O°Eo°c"L°o°o°o�
8" COMPACTED GRAVEL �oo • °
TEE LOCATION - _-- hh�`", ��� .. 12" PROCESSED GRAY
°o°o° °o° MDPW M1.03.1 VIB.
6" COMPACTED GRAVEL ALL APOUND� ° ° °°C °
NCT TO SCALE REMOVE TOP & SUSS011
L-121
NOTE: REMOVE ANY FROST SUSCEPTIBLE MATERIAL
TO A DEPTH OF 36" BELOW FINISHED GRADE.
REPLACE WITH NON FROST SUSCEPTIBLE MATERIAL
(LESS THAN 10% PASSING F200 SIEVE)
26•'
MANUF. LeBARON. BEOCKTON. MA
MODEL: LT 105
WEIGHT. 430 LBS
TYPICAL ACCESS COVER
SCALE. 3/4" = 1'-0"
SEPTIC SYSTEM INFORMATION:
AWTE PROVIDES. ONE BIOCLERE MODEL 16/19 UNIT
(2) PERISTALTIC CHEMICAL FEED PUMPS FOR
ADDITION OF SUPPLEMENTAL CARBON AND-A.LKALINIT
\- INCLUDES COMPLETE BIOCLERE SYSTEM VESSELS, CLARIFIERS,
MEDIA, PUMPS, CHEMICAL FEED PUMPS, CONTROLS AND ALL
INTERNAL CONNECTING PIPING AND WIRING.
BIOCLERE IS DELIVERED WITH LIFTING SLING AND CAN BE
HANDLED BY SITE EXCAVATION EQUIPMENT.('M, 640 LRS DPI)
ONSITE TECHNICAL ASSISTANCE AND COMMISSIONING
BY AWTE PERSONNEL.
CO' -PACTCM TO PP -^v DE
LEAlH"r, FIElCS K'I:H Sf'_
PEMOVAL AND REPLACEMENT AS REOUIRED, VENTS ETC,.
ADDITIONAL EQUIPMENT REQUIRED: FOOTING PAD FOR BIOCLERE,
CONDUIT LINES FOR RECYCLE AND CHEMICAL FEED LINES,
ALKALINITY MIXING TANK WITH MIXER, EXTERNAL CONNECTING PIPING
AND WIRING OF ALL SYSTEM COMPONENTS.
REQUIRED SITE WORK INCLUDES- EXCAVATION, SETTING OF TANKS AND
FOOTINGS. CONNECTIVE PIPING. WIRING AND BACKFILL WITH CLEAN SAND.
/a.
NOT TO SCALE
4' DIA
24"LD. CAST IRON COVERS
AS SHOWN. MORTAR. ALL COMPONENTS
FFLR EL. 42.85
TEND. EL. 42.51
4"SCH40
PVC AT 25
CONTROL PANEL AND 3435
ALKALINITY & - x .
CARBON SOURCE 'Q
WITH DRIP LINES TO STI
(SUPPLIED BY AWTE) a
TO BE PLACED IN iD '
CRAWL SPACE 38.
MECHANICAL MIXER &
RELATED HARDWARE TO BE
SUPPLIED BY CONTRACTOR
SEPTIC ELECTRICAL CONTRACTING REQUIREMENTSr
MOUNTING OF CONTROLS AND PROVISION
OF 115V/30AMP CIRCUITS TO THE
- SYSTEM CONTROL AND THE BIOCLERE UNIT.
ALL EXTERNAL: WIRING.
PROVIDE ADDITIONAL ELECTRICAL SERVICE TO THE
CRAWLSPACE FOR THE OPERATION OF THE
CHEMICAL FEED PUMPS AND THE MIXER.
99-07G
u 10" 14"
TEE TEE
1500 GAL P-20 -
SEPTIC TANK GAS BAFFLE &
4' L10. LEVEL ZABEL FILTER
ACME OR EQUAL
6" GRAVEL & MECH.
COMPACTION (T)(P.)
PROVIDE
4"SCH40
FORM WATER TRAP WITH
45 BENDS AS SHOWN
4"SCH40 PVC
33' AT 1
NU'ES_ 1. CONCRETE MINIMUM STRENGTH. 4,000 PSI ® 28 DAYS,
STEEL REINFORCEMENT. 6 X 6 10 GAUGE STEEL WIRE MESH.
PRECAST MOUNTING PAD
NOT TO SCALE
F N F^JUSN;
1-i/2- SCHD 40 PVC
RECYCLE LINE —,
:Ho 40 -
INLET
SUMP
4'-n 1/4`
PRECAST MOUNTING PAD
SEE DETAIL ABOVE
CONTRACTOR TO PROVIDE.
VENDOR: AWTE INC..
241 DUCHAINE BLVD. -
NEW BEDFORD, MA02745
PH. 1-508-998-7577.
FAX 1-508-998-7177