Loading...
HomeMy WebLinkAboutDecision 4066 - Plan of Land Sheet 2• • aa• .a :as • a• a1 �® 'y4 I � lv�' �Xj y$-F�...fi'jV • � • OR «i w 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE H-20. EL 24.5 0/A HORIZON 0 PROPOSED LOAMY SAND 13'. 1500 GAL SEPTIC 1 ; 5. THIS PLAN IS FOR PROPOSED WORK ONLY AND IS NOT TO TANK TEE H-20 TEE 16' ism INSTALL NEW ' 6. 6* LOAM AND SEED ALL DISTURBED AREAS NOT PAVED, M6.03.0 SEED. GAS BAFFLE LOAMY SAND - o0o a PROPOSED 00000000 00000 3'-0' 27' AT 1% 4"OSCH40 PVC _ 2" PEASTONE & •ILTER FABRIC INVERT 21.0 2' CAST IRON H-20 COVERS TO GRADE (2) REQ. ON SAS BLOCKS OR 3 dT5 PRECAST RISERS H-20 21D. 21.48 21:31'25 MAX M ,h �-EL 19.0 eOSCH40 PVC \ H-20 500 GAL LEACHING CHAMBER BY SHOREY PRECAST PIPES LEVEL IST 2' L EQUA3 O I: H -2D 0-L3Dx ON 12' muFACTEO GRAyn OR UNITS REQUIRED SHOREY DB -9 H-20 OR EQUAL 3/4•-1-1/2' DOUBLE WASHED STONE 4' MIN. INVS EL 21.0 ALL AROUND PRECAST STRUCTURES/ OR AS SHOWN SYSTEM PROFILE OVERALL DIMENSION TO OUTSIDE OF STONE 33.5' X 12.83' (VARIES) NOT TO SCALE PROPOSED SEPTIC SYSTEM LEACHING AREA PROP. 2' CAI2 TREE _� 4.54 1 391 SF FOOTPRINT- 2' EFF DEPTH 24.14 18. Tree ^ - ' J - VENT \ , 24.58. \ 107.61 - o N THI U •::;:•.?::i::::.....:.....:.'.:-.� -""'y1si :::p'mO •QCo V.......ii%". .":: .......... :......... OD 24.75....... ... ; .... .. B .�-�.+<^[t^iai�i. 'lf2:%iq;}'::-^fSt:::t .y.V• X 24.64 0.\ P/t 1. ;:eiriii>i Fi}:i5::::•:-. r.r �'J / `�'$f.:i; ti 19.9' \ n, �`. E \ W \.�C :moi � 24.16 PROPOSED \\-� RISER do COVER TO GRAD 1500 GAL TYP. 11 i H-20 SEPTIC \ \ NEW DB -9 H-20 fop / Cj f� TANK f \ \ RISER "& COVER TO GRADE Bed 0i V J RISERS k COVERS TO GRADEO \ � It SPi CAUTION: GAS do ELEC. `w�n`,,• x24.30 o / PS��i IN AREA- NOTIFY 1DIIGG_SAFE O o - VAN X2452 _ REMOVE E��'�� DECK STAIRRSTHCPS SIGN AAwm Locvtim PROPOSED / 1,000 ca..'soac STAIRSTOx24.08 Tank From AsbuAt l G Cord (PUMP & REMOI PROPOSED / t >t-2EGI� .. EXPANSION �f 23.96. O _ PROPOSED 7/ Bar O STEPS & 5' light � � �x 10' LANDING ry NOTES: SEPTIC PLAN VIEW SEE SHEET # 23R �° BENCHMARK (HYDRANT) 1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS Scala 1"=10' APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE (1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS 0 5 10 15 20 25 FEET 2. ALL CONSTRUCTION MATERIALS, COMPONENTS. AND METHODS E)APLOYED ON THIS PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGS. AND\OR THE MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS FOR BRIDGES AND HIGHWAYS AS AMENDED TO PRESENT. ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5. THt SOIL EVALUATOR: THOMAS Mc MIM, PE AND YARMOUTH HEALTH REGULATIONS. BOH: LYNNE MULKEEN 3. VERTICAL DATUM IS NGVD ASSUMED FROM QUAD. MUNICIPAL WATER IS AVAILABLE DATE. 8-20-03 APPROVED BY HEALTH DEPT. UcEd ITI. 7 , TITLE 5 FLOW: MIXED USE- RESIDENTIAL & OFFICE (INCL EXPANSION) OFFICE USE 1738 SF (75 GPD/1000 S - 130 GPD RES.(1) BEDROOM (110 GPD/BEDROOM) - 110 GPD OFFICE USE (BASEMENT): 1150 SF (75 GPD/1000 SF) - 87 GPD USE 327 GPD DESIGN FLOW TOTAL NO GARBAGE DISPOSALS ALLOWED SEPTIC TANK: 327 GPD (200X) - 654 GALLON REQ. USE NEW 1500 GALLON H-20 SEPTIC TANK USE C1 LAYER CLASS 1 SOILS FOR LEACHING <2 MPI a 0.74 GPM/SF LTAR LEACHING: 327 GPD/0.74 GPD/SF - 442 SF LEACHING AREA REQUIRED. USE (3) 8.5'X4.83'X 2'EFF. DEPTH LEACHING GALLEYS WITH STONE ALL AROUND AS INDICATED ON DRAWING- 391 SF FOOTPRINT BOTTOM CAPACITY - 391 SF X 0.74 - 289 GPD SIDEWALL - 88.1' X 2.0' EFF DEPTH- 172 SF X 0.74 - 127 GPD 563 SF 418 GPD >327 O.K SEPTIC SYSTEM DESIGN DATA 13.5' BOTTOM TH1 NO GROUNDWATER FOUND PLAN OF LAND U, SOUTH YARMOUTH, MA DATE PREPARED FOR GEORGE DAVIS BUILDERS, INC. DATE: JULY 13, 2006 E. SHEET 2 OF 2 off 508-362-4541 fax 508 362-9880 down cape engineering, inc. Cl 1//L ENGINEERS LAND SURVEYORS 939 Main 'Street - YARMOUTHPORT, MASS. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE H-20. EL 24.5 0/A HORIZON 0 LOAMY SAND 5. THIS PLAN IS FOR PROPOSED WORK ONLY AND IS NOT TO 3/2 BE USED FOR PROPERTY UNE STAKING. 16' ism 6. 6* LOAM AND SEED ALL DISTURBED AREAS NOT PAVED, M6.03.0 SEED. B HORIZON LOAMY SAND 7. ALL SEPTIC PIPING 400 SCH-40 PVC AT 1X MIN. UNLESS NOTED. tOYR 5/8 8. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT EL 21.5 36' INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH 9. CONTRACTOR TO VERIFY ALL UTILITIES AND EXISTING INVERTS PRIOR TO INSTALLATION C1 HORIZON OF ANY SYSTEM COMPONENTS. FINE SAND' 10. IT IS RECOMMENDED TO REGRADE PARKING AT EXISTING BUILDING TO ELIMINATE C1 PERC RATE <2MIN/IN. 2.5Y 7/4 EXISTING PUDDLE. RECOMMEND PRESSURE TREATED WOOD NEAR GRADE 11. PUMP & FILL EXISTING SEPTIC LEACHING PIT PER TITLE 5 SPECIFICATIONS. 12. NEW HCP RAMP SLOPE 1:12 MAX.. NON SKID SURFACE. RAILS BOTH SIDES PER ADA EL 13.5 132' AND 521 CMR, SEE BUILDING PLANS FOR DETAILS. NOTE ZONING 203.5 (D) FOR RAMP. NO GROUNDWATER ENCOUNTERED DCE: TEST HOLE LOGS #06-173 UcEd ITI. 7 , TITLE 5 FLOW: MIXED USE- RESIDENTIAL & OFFICE (INCL EXPANSION) OFFICE USE 1738 SF (75 GPD/1000 S - 130 GPD RES.(1) BEDROOM (110 GPD/BEDROOM) - 110 GPD OFFICE USE (BASEMENT): 1150 SF (75 GPD/1000 SF) - 87 GPD USE 327 GPD DESIGN FLOW TOTAL NO GARBAGE DISPOSALS ALLOWED SEPTIC TANK: 327 GPD (200X) - 654 GALLON REQ. USE NEW 1500 GALLON H-20 SEPTIC TANK USE C1 LAYER CLASS 1 SOILS FOR LEACHING <2 MPI a 0.74 GPM/SF LTAR LEACHING: 327 GPD/0.74 GPD/SF - 442 SF LEACHING AREA REQUIRED. USE (3) 8.5'X4.83'X 2'EFF. DEPTH LEACHING GALLEYS WITH STONE ALL AROUND AS INDICATED ON DRAWING- 391 SF FOOTPRINT BOTTOM CAPACITY - 391 SF X 0.74 - 289 GPD SIDEWALL - 88.1' X 2.0' EFF DEPTH- 172 SF X 0.74 - 127 GPD 563 SF 418 GPD >327 O.K SEPTIC SYSTEM DESIGN DATA 13.5' BOTTOM TH1 NO GROUNDWATER FOUND PLAN OF LAND U, SOUTH YARMOUTH, MA DATE PREPARED FOR GEORGE DAVIS BUILDERS, INC. DATE: JULY 13, 2006 E. SHEET 2 OF 2 off 508-362-4541 fax 508 362-9880 down cape engineering, inc. Cl 1//L ENGINEERS LAND SURVEYORS 939 Main 'Street - YARMOUTHPORT, MASS.