HomeMy WebLinkAboutDecision 3408 - Site Planz
0
O�
ZZ
<P
DINAHS POND
O \
SEA r ��S-AERN
MID CAPE HIGHWAY
WHITES PATH
R pJ�RO P�
LOCUS
PUMPING
STATION
FLAX POND
USGS — DENNIS QUADRANGLE
2000
0
1000
CATCH BASIN
2000
4000
C-
GUY WIRE
CO-)
UTILITY POLE
1" 1000
FEET
—W—
WATER LINE
ASSESSORS MAP 88
PARCELS: E14 and E15
ZONING DISTRICT: INDUSTRIAL
40,000 SF
100' FRONTAGE
SETBACKS: FRONT - 30'
SIDE - 10'
REAR - NONE (CORNER LOT)
SITE IS IN AQUIFER PROTECTION DISTRICT
FLOODZONE: ZONE C PANEL 250015 0002 D
CA.PE HIGHWAY
_ 40 WHITES PATH �-
--nic�TRIA�
C�
�G
0
02
o�
�L
2
o� REI
LOCUS
Rpd�ROPO /
1N�vS�R\
4F�-
R' 0
R>�
88/E1
i
30 0 100 200 400 of
( IN FEET )
1 inch - 200 ft.
TOTAL AREA = 16,918 sf + 16,333 sf = 33, 251 sf TOTAL
% IMPERVIOUS COVER = 60%
DRAINAGE CALCULATIONS:
IMPERVIOUS COVER - BLDG,ADDN, EXIST PAVE = 10,697 sf
10,697 = .25 AC
43,560
3
Q = CIA = (.9)(5)(.25) = 1.13ft/sec 2
= 505 g/min 505 g/min / .7 gpm/sf = 721 sf REQUIRED
IMPERVIOUS COVER - PROPOSED PAVE = 9719 sf
Q = CIA = (.9)(5)(9719/43560)448.8(1/.7)= 643 sf REQUIRED
TOTAL LEACH AREA REQUIRED= 1364 sf
EXSITING LEACH SYSTEM: 2 LEACH BASINS 14' X 6' = 835.6 sf
ONE TRENCH (4')(15')(2') + 6(15') - 2(4' X 6') = 162 sf
ADDITIONAL PROPOSED LEACH SYSTEM: LEACH TRENCH 65'X6'X2'(650 SF)
TOTAL LEACH AREA PROVIDED = 1648 sf O.K.
97-056
LEGEND
j�
WATER GATE
O
CATCH BASIN
800 (EXIST)
HYDRANT
C-
GUY WIRE
CO-)
UTILITY POLE
—G—
GAS UNDERGROUND
—W—
WATER LINE
0-
PROPOSED CONTOUR
31
- EXISTING CONTOUR
773-1 -21
PROPOSED SPOT GRADE
crr,�
PROPOSED TREE.
BY 2' AS SHOWN 4" OF
FILL OVER
BUILDING DATA:
HEIGHT = 23'1
EXISTING 78' X 40' + PROPOSED 19.5' X 78' ADDITION
SPACE (INTERIOR)
OFFICE SF
STORAGE S
FIRST FLOOR
800 (EXIST)
2080 (EXIS
NEW ADDITION
1482 (PR(
SECOND FLOOR
800 (PROP)
400 (PRO
SECOND FLOOR LOFT
TOTAL
1326 (PR
SUB TOTAL
1600
5288
TOTAL USABLE SPACE = 6888
LOT 11
LOT 1030-
-`. 31 _-__ PROPOSED ADDITION )
ZONE 0 ONE FLOOR/
U�FE1 19' X 78'/ 1
da1
b t-� PROPOSED 651x6'x2' 0
30 n LEACHING rRENCH vaN K �' PROPOSED 2ND STORY XV
/� pREN \ \ o GAS ADDITION \ LOT 16
�ROPOSED
�METER �� �' - 0
(POSTS REO.) O
o CATCH BASIN i /' r, w 13 EXISTING WOODFRAME BUILDING
RIM ELEV. = 30. 0 .v ONE STORY r�
06 1�CONCRETE
_ X11 2 . --NG 14 SLAB ELEV. 31.37'
EXCAVATION 1.1
3 TOBIfo moa 2 PROPOSED
FILED IN. 29
.�` HANDICAP 30
SPACES \
i
PROPOSED �� PROPOSED
DUMPSTER CATCH BASIN \
AREA rn 4 RIM ELEV. 30.30'J 1 6 l 23 /% 31 -
Z
ER '\ RIM /
G 309 B�iFF^moi 5 17 1 ■ E�EV. = 30.35' Icr / o'l^
_. L 32 24 ij
6 / 1 8 , '\ EXISTING /.
25 \, LEACH PITS 337
y
O `\
719 i 34 r 'CIP
r ��x A 'RIM / \
0,\,� =--30.97' 35
ZO 0 9 ,� 2ING
D 6xIROLLED ASPHALT CURB O
\ ^� 1 20 p, Q 27 T BE REMOVED O ) \O
r \✓ l
MATCH EXISTING PAVEMEN . \
�0 a O H"
`\ 10.. 21 28 o �'
LOTS 14 & 15 �z r/BERM
P /
rea = 33,251 sq.ft 1 1 22-
0.76 Acres 3
\ V METAL �J A�rUS G/ - -
t 3 SIGN POST C-
_ - -
'\ w - WITH LIGHT(((00 G
G
BENCHMARK 3Q.0 2
HYDRANT 0 /G ^PPVE
TAG BOLT # 1369
ELEV. = 34.29' =
RLE
,C
PARKIAIC CALCULATION:
OFFICE TOTAL - 1,600 sf
@ 1 space/200
TYPICAL
CATCH BASIN PROPOSED
STORAGE - 5,288 sf TOTAL
PER SECTION
606 M.B.C.
1 OCCUPANT/100 sf (1
SPACE/2 OCC.)
(NOT TO SCALE)
REQ.
TOTAL
= 35
SPACES REQUIRED
LAYERS
RIM
ELEVATIONS 30.3'
SPACES PROVIDED.
TREE CALCULATION:
BY 2' AS SHOWN 4" OF
FILL OVER
LEACHING PIT 1
PEASTONE
12" CORRUGATED
IS TO BE
FREE OF FINES
SMOOTH LINED:
.....
•
-, ..: . ; J. ...
�.. - •.
H.D.P.E. PIPE
AND COMPACTED IN 6"
00
oo°°op
°o°oa °oo °pc
LAYERS
BLOCK UP AS REQ
TYPICAL PAVEMENT
I)
8"10
0
FULL MORTAR BED
SECTION
)P)
12" CORRUGATED
1'
TOP
CLEAN N '
1
SMOOTH LINED
�T`�� " " ..: � ; J. ':.
.°O
•• .... •. ..
HEAVY DUTY FRAME
AND METAL COVEROO
O Oc,0O
ppO
FILL
H.D.P.E. PIPE
p•O °0 00"0°O
po pp °OO °OC
2"
BINDER
P
4" PEASTONE AND FILTER FABRIC
SLOTTED
—gyp
8
^- n _^
o
D0000
OVER CROWN OF PIPE
pO 0
OO
>
12"
GRAVEL
DP)
1" WASHED
-//p
24"
Il
LEACHING
OI
Oppp
opOp0p
STONE
v 0.0-0 00 -0,00-0, HEAVY DUTY FRAME
'o^°oo'°.°n�Opn-c
PIT
SET CROWN OF PIPE AT EL.28.0
AND METAL GRATE
1
0000
0
O0
pQO
:.
TO GRADE
4'
6'
4'
RUNS LEVEL BETWEEN SOLID BASINS
I
CLEAN
14' DIAMETER
z 6'x6'
COMPACTED
`
45
PRECAST
FILL
2' DEEP, 6' WIDE -
LOT 12
H-20 CATCH
I
.75"-1.5" DOUBLE WASHED STONE
BASIN
LOT 1030-
-`. 31 _-__ PROPOSED ADDITION )
ZONE 0 ONE FLOOR/
U�FE1 19' X 78'/ 1
da1
b t-� PROPOSED 651x6'x2' 0
30 n LEACHING rRENCH vaN K �' PROPOSED 2ND STORY XV
/� pREN \ \ o GAS ADDITION \ LOT 16
�ROPOSED
�METER �� �' - 0
(POSTS REO.) O
o CATCH BASIN i /' r, w 13 EXISTING WOODFRAME BUILDING
RIM ELEV. = 30. 0 .v ONE STORY r�
06 1�CONCRETE
_ X11 2 . --NG 14 SLAB ELEV. 31.37'
EXCAVATION 1.1
3 TOBIfo moa 2 PROPOSED
FILED IN. 29
.�` HANDICAP 30
SPACES \
i
PROPOSED �� PROPOSED
DUMPSTER CATCH BASIN \
AREA rn 4 RIM ELEV. 30.30'J 1 6 l 23 /% 31 -
Z
ER '\ RIM /
G 309 B�iFF^moi 5 17 1 ■ E�EV. = 30.35' Icr / o'l^
_. L 32 24 ij
6 / 1 8 , '\ EXISTING /.
25 \, LEACH PITS 337
y
O `\
719 i 34 r 'CIP
r ��x A 'RIM / \
0,\,� =--30.97' 35
ZO 0 9 ,� 2ING
D 6xIROLLED ASPHALT CURB O
\ ^� 1 20 p, Q 27 T BE REMOVED O ) \O
r \✓ l
MATCH EXISTING PAVEMEN . \
�0 a O H"
`\ 10.. 21 28 o �'
LOTS 14 & 15 �z r/BERM
P /
rea = 33,251 sq.ft 1 1 22-
0.76 Acres 3
\ V METAL �J A�rUS G/ - -
t 3 SIGN POST C-
_ - -
'\ w - WITH LIGHT(((00 G
G
BENCHMARK 3Q.0 2
HYDRANT 0 /G ^PPVE
TAG BOLT # 1369
ELEV. = 34.29' =
RLE
,C
PARKIAIC CALCULATION:
OFFICE TOTAL - 1,600 sf
@ 1 space/200
sf = 8
space REQUIRED
STORAGE - 5,288 sf TOTAL
PER SECTION
606 M.B.C.
1 OCCUPANT/100 sf (1
SPACE/2 OCC.)
= 27.spaces
REQ.
TOTAL
= 35
SPACES REQUIRED
LAYERS
35
SPACES PROVIDED.
TREE CALCULATION:
BY 2' AS SHOWN 4" OF
35 SPACES (1 TREE PER 8 SPACES) = 4.4 5 TREES REQUIRED
5 TREES PROVIDED
SEPTIC CALCULATION:
OFFICE: 75 gal/1,00sf /1,600 sf = 120 of/day
STORAGE(IND): 16 PERSONS MAX ® 15gal/day/person = 240 gal/day
TOTAL DESIGN FLOW = 360 gal/day
TITLE V SYSTEM DESIGNED FOR 501 gal/day (OLD TITLE V) PER PLAN
APPROVED 7/85
'DyATE
REA ,PON cI
GENERAL NOTES:
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE (1-
800-322-4844) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR
EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND\OR THE MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STANDARD SPECIFICATIONS
FOR BRIDGES AND HIGHWAYS AS AMENDED TO PRESENT.
3. ALL RUNOFF TO BE CONTAINED ON LOCUS.
4. ALL DRAINAGE COMPONENTS MUST BE CAPABLE OF WITHSTANDING H-20 WHEEL LOADS.
5. EXISTING SEPTIC SYSTEM INSTALLED PER SITE PLAN BY DCE DATED 6/13/85.
6. SPACE >2" CAL. TREES AT 20' ON CENTER(SPACE AS SHOWN IN BUFFERS WHERE EXISTING
TREES ARE ABSENT OR DEEMED INADEQUATE BY THE BUILDING INSPECTOR.)
TYPICAL
LEACHING PIT EXISTING (NOT TO
SCALE)
FILL OVER
LEACHING PIT
IS TO BE
FREE OF FINES
AND COMPACTED IN 6"
4 MIL POLY
LAYERS
OVERLAP PEASTONE
BY 2' AS SHOWN 4" OF
PEASTONE
12" CORRUGATED
SMOOTH LINED:
.....
•
-, ..: . ; J. ...
�.. - •.
H.D.P.E. PIPE
°0Q °°
00
oo°°op
°o°oa °oo °pc
o 0 0 0
8"10
0
�—
Op
0
O O
CLEAN N '
1
CLEAN
FILL
Op
0
HEAVY DUTY FRAME
AND METAL COVEROO
O Oc,0O
ppO
FILL
Op
TO GRADE
0oOpOO
OO
o
D0000
pO 0
OO
4..5'
PRECAST
O p O
1" WASHED
-//p
Il
LEACHING
OI
Oppp
opOp0p
STONE
PIT
: .0
0000
0
O0
pQO
:.
4'
6'
4'
14' DIAMETER
EXISTING USE - WAREHOUSE AND OFFICE - D3
PROPOSED USE - WAREHOUSE AND OFFICE - D3
SI TE PLAN
OF LAND IN
SOUTH YARMOUTH, MA
SHOWING A PROPOSED ADDITION
PREPARED FOR
E. F. WINSL 0 W PLUMBING
& HEA TING CO. INC.
SCALE: 1" = 20'
20 0 20 40 60 Feet
DATE: APRIL 7, 1997
REVISED: APRIL 11, 1997 - EXISTING WATER AND GAS SERVICE
REVISED: MAY 1, 1997 - PARKING, DRAINAGE
off 508-362-4541
fox 508 362-9880
down cape engineering, Inc.
CIVIL ENGINEERS
LAND SURVEYORS
939 main st. yarmouth, ma 02675
I