Loading...
HomeMy WebLinkAboutDecision 4093 Sewage Disposal System Repair DesignSOIL TEST PIT DATA: TEST PIT618 GRD. EL. EST. HIGH GW. 2.5* FILL A L. SAND 1OYR3/3 B L. SAN 10YR4 6 EL = 3.8 C M. SAND 10YR7/3 50" OBS GW 66" ELEV=1.3 102" INDICATES gfaBO 3 EL = -1.7 ESTIMATED PLAN VIEWA,d,�y��,���� DATE: - SEASONAL HIGH s' MIN. 3/4' TO CROSS-SECTION VIEW t 1/2' STONE 9/14/06 GROUND WATER TEST BY: INDICATES SEPTIC TANK BUOYANCY CALCULATION: GROUND WATER THE BSC GROUP, INC. E0 DATUM: VARIANCES REQUESTED: GROUND WITNESSED BY: VERTICAL DATUM: NGVD 1929 H-10 2,00 AMY VON HONE INDICATESBUOYANCE FORCE = (2.5'-1.0 ') X 62.4 Ib/cf X 12.0' X 6.0' =6,739 LBS PERC. RATE: PERC. BENCH MARK USED: HYDRANT TITLE V: SECTION 15.212: TO ALLOW 4 SEPARATION TO GROUNDWATER 1 _MIN./INCH TEST TAG BOLT #159 IN LIEU OF 5'. WEIGHT OF TANK = SOIL EVALUATOR ELEV=9.57 WEIGHT OF SOIL = (1'' X X 12.0' X 6.00') X 85 Ib/cf = 6,120 LBS 1LBS MARK DIBB ® INDICATES TITLE V: SECTION 15.255: TO ALLOW THE BREAKOUT DISTANCE TO BE 4' TO 14,160 LBS + 6,120 LBS = 20,280 LBS > 6,739 LBS UNSUITABLE BENCH MARK USED: CB W/DRILL HOLE SOIL CLASS: MATERIAL ELEV=6.87 FIELD WITH THE USE OF A 40 MIL POLY -LINER. 1 TO ALLOW THE TOE OF SLOPE TO BE 1 FROM L.T.A.R. PROPERTY IN LIEU OF 5' AT RIVER STREET 0.74 G.P.D./SQ.FT. LIMIT OF EXCAVATION EDGE OF p / / / � AVEMEN7 BENCHMARK: 5OFF EDGE OF SAS - - - - --- - W/DRILL EL HOLE - SEE NOTES 5&6 -7- f - CB EL'L (NGVD 1929) CB ['�� ��� 1/4" PERFORATIONS STREET - 0 5.0' O.0.((48 (PUBLIC 29.5' WIDE) ��G �CB OHW OH �P OHw OHW OTAL) -TS - - _w- - � . A? W OHW OHW--___OHW - EDGE OF PAVEMENT OHW --7-- FNDDH l OHW---__. OHW _-�'•�O _•, . / BENCHMARK: PR9P0 40MIL - - - HYDRANT TAG BOLT #159 WG UPL OHW� CB OHW �- OHW IELEVATION=9.57 (NGVD 1929) POLY LINER _ / 6.7 �- OHW - - - TOP=7.3 �/ 77�- - ST005 CE N 84'45'70" W - OHW -} _ BOT=3.3 -B � .. - .- - 11 6.5 W� 5 253.8E' OHW - OHW DHW �/ O� - UPL 9/14/06 *GROUNDWATER BASED ON BASS RIVER ELEV=2.5 PER YARMOUTH HEALTH DEPARTMENT 18" OBSERVED GROUNDWATER AT ELEV=1.3 PROFILE: NOT TO SCALE SEPTIC TANK DETAIL: 2,000 GALLON NOT TO SCALE NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. FINISH GRADE BARRIER 2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. EL.EL 8.3 ELEVATION 8.1-8.3 UNLESS UNDER PAVEMENT, DRIVES OR = A TRAVELED WAYS, WHEREIN H-20 LOADING TOP FOUNDATIONd/ate SHALL APPLY. CONCRETE COVERS TO WITHIN 3. ALL PIPE CONNECTIONS AND CONCRETE EL.= 10.33 6' OF FINISHED GRADE. /i�� 1 1 2" PVC 2-24' DIA CONCRETE MANHOLES _jjjZjLMt- WASHED SIUNE 7-30 \` i _ CONSTRUCTION SHALL BE WATERTIGHT. W METAL HANDLES BROUGHT 4. FILL ALL UNUSED KNOCKOUTS NTH Tt� 6' OF FINISH GRADE :t LEACHING FIELD MORTAR. TEE TO BE UNDER 12' MIN. PV a� q .:.- 1=7.00 1= M.H. OPENING `- 4' PVC y `' -- : a `- :- - .- r B T.EIEY•�- 6.5 SCH 40 3' PVC FORCE Mi4 RAISE M.H W� =g I=D = t2,-0, 4. SEWER BRICK e . •<. •:: :e 1=F SAND FILL SEE do MORTAR 4.12 NOTES 5 do 6 GROUNDWATER - 2.5 NGVD) NORMAL WATER LEVE " 3SEPTIC TANK PUMP CHAMBER PRECAST SEPTIC TANK 1°' 14INLET TEE T'-1" O O O 6'-0" 4'-6'' 4'-0' MIN. wam ON Z :-: LIQUID DEPTH ia�ma) '. s'WE -6' g - a. TTOM ON LEVEL STABLE BASE EL -1 0 ' a INVERT ELEVATIONS: TOP OF FOUNDATION 11.0 A 4" INVERT AT BUILDING 7.00 B 4" INVERT AT SEPTIC TANK (IN) 5.50 C 4" INVERT AT SEPTIC TANK (OUT) 5.25 D 4" INVERT AT PUMP CHAMBER IN 5.10 E 4" INVERT AT PUMP CHAMBER OUT 4.85 F INVERTS AT LEACHING FACILITY: 1 1/2 INVERT AT LEACHING FIELD 7.0 G BREAKOUT 7.3 ELEVATION AT BOTTOM OF LEACHING FIELD 6.5 H ADJUSTED HIGH TIDE/ GROUNDWATER 2.5 J DESIGN CRITERIA: [EXISTING FLOW: 8 BEDROOMS AT110G.P.B./D 880 G.P.D. DESIGN FLOW: 8 BEDROOMS AT 110 G.P.B./D 880 G.P.D. REQUIRED SEPTIC TANK: 680 X 200% = 1,760 GAL. SEPTIC TANK PROVIDED: = 2000 GAL. SIZE OF LEACHING FACILITY REQUIRED: DESIGN PERC. RATE: <2 MIN./ INCH LONG TERM APPL. RATE 0.74 G.P.D/S.F. 880 GPD + 0.74 GPD/SF _ 1189 S.F. SIZE OF LEACHING FACILITY PROVIDED: 880 GPD _ 0.74 SF/GPD = 1189 S.F. USE LEACHING FIELD BOTTOM = 25,0' x 50.0' = 1250 S,F PROPOSED 50' x 25' 10 • : ::: - • :.:::.. - �r - - 6' OHW 1250 S.F X 0,74 SF/GPD = 925 GPD PRESSURE DOSED 1 j :: ` : \ o�� y / STOCKADE FENCE GUY WIRE LEACH FIELD _ I , 5 0 ,` --1 8.50 SHOWER / \ - - - _ `' 72 "�° LOCUS INFORMATION �/ .: , \ P j # �f5.00 2.0 ' I �/ / 7.7 CURRENT OWNER: ESTATE OF .�e o JAMES J. 4, 0 1 0 I TITLE REFERENCE: BOOK 17773, PAGE 300 �NINGHAM 1°�� / 0 s 1 1/4" LATERAL (TYP OF 5) 1 y2 5 2.Ob' I I / 3 _ I " PVC MANIFOLD PLAN REFERENCE: L.C. 18832-A �� 00 3 / �'� PROPOSED ADDITION / BIT GAS METER i I ASSESSORS MAP: 34 rl A �i I EXISTING PROPOSED R6LOCATED LAWN PARCEL: 290 / 3 i 2 STORY 2 STORY / �• I WOOD FRAME ( 7.4 ZONING DISTRICT: RS -40 • ' - J 3 PVC WO(� FRAME cO RED / : • • o ....... wl FORCE MAIN HOUSE #167 HOUSE #167 POICH PROPOSED DECK SETBACKS: FRONT 30' _ POI SIDE 20' -B- -N . . . • . • ? J - - . . . . . . . . . C I THRESHOLD=8.8 TOF=11.0 I / 7.6 REAR 20' PROPOSED - - - - - _ .... THRESHOLD=12.0 VENT - -----_Q__ / I N/F F o` MINIMUM LOT SIZE: 40,000 S.F. / `-•� I STOOP / I JAMES J. CUNNINGHAM �C 8.30 I I ASSESSORS MAP 34 e `�� EXISTING LOT AREA: 17,041±S.F. RICK ) / PARCEL 290 I U g W LKWgy b I 17,041tS.F. / °P �P /� FEMA FLOOD Nm L00 � PROPOSED 1,500 O I I G �o?����Po ZONE DISTRICT: ZONE A-11 (ELEV 7/ 1 o GALLON PUMP E 6.f I PR OS A DITION BRI K PATIO �F�� °oo/ J�� #250015 0006 D, 7/2/92 Q CHAMBER E OVERLAY DISTRICT: NOT IN A ZONE II N o RAGE 70.8' O 50 I l ; '1 0 / ° PROPOSED RECONSTRUCTED u-4 GARAGE 10.3 / 35.0' �` 10.3 /O / LOT COVERAGE I SLAB8.30 z4 ss / PROPOSED BUILDING/DECK/PORCH COVERAGE - 23% � _ s I .r�Po /� 6.4' 6.5 PROPOSED 2,000 STOCKADE FENCE GALLON SEPTIC TANK N/F ROBERT J. DAMS ASSESSORS MAP 34 PARCEL 291 OF CRAIG M Foo 1Miew /1,cl0 7 6.6 LOCA ION C'O FROM T WN OF Y 7.00 0 INFORMAT S84.45'10'E / °�/P�� �P 0 4 /4 ° 00 / - , - SEp' 8.50 -TANK D -BOX T r N / 7/2 4 200.55' OST AND AIL E TO BE REMOVED \ M1RK D. DI88 { / ,IVIL w / PLAN VIEW SCALE: 1' = 20 FEET 0 10 20 40 FT. Of/_ 0 7 / LAWN >>0 7.4 4Ilk D / LOCUS PLAN: NO SCALE STAIRS / WI LOW ST STAGE ISLAND / G z BASS R NANTUCKET SOUND REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL. 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL UP TO 45% BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE h%4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE #4 SIEVE, SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 100% MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 10%-1007 MUST PASS #50 SIEVE (0.30 mm EFFECTIVE PARTICLE SIZE) OR -20% MUST PASS #100 SIEVE mm PARTICLE SIZE) P SS 0%0.15 5% MUST #200 SIEVE (0.075 mm EFFECTIVE PARTICLE SIZE) 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR 1HE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. NEW INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO INSTALLATION. 0. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. BSC GROUP 349 Main Street (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM REPAIR D #167 n RIVER STREE YARMOUTH o MASSACHUSETTS PREPARED FOR: ERT ARCHITECTS, INC. 939 ROUTE 6A YARMOUTH PORT, MA 02675 (508) 362-8883 DATE: 1/05/2007 COMP. DESIGN: M. DIBB CHECK: K. HEALY DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 4889700-SP.DWG DWG NO. 5671-02 SHEET 1 OF 1 JOB NO. 4-8897.00 #4093 - Zoo7 I