Loading...
HomeMy WebLinkAboutEngineered Plans - Rev. 2015VCesspool -T r4- LOCUS N cD < Q CD m BENCH MARK LOCATION MAP Map Bedrm M m CTF.• 440890 Plan: Kitchen L.C. Plan: 22356—A < m @ Bulk Head ELEV 9.3 Contour & Impervious pp & Dining Top of Foundation 40mil Liner EI. 9.4 EI 7.0 to EI 8.5 � N 8.2 $.4 Bedrm Living 9 N8.4 r—X19.2' �_ — Fenc Rm cv 8.1 8.9 fence W 1ST FLOOR —' S 84° 53' 20» o �o - 8r 100.12' EXISTING FLOOR LAYOUT I l Lot 25 ' 8;6 $� f Create 0" drainageEI.7.51e LCP 22356A . 7.9y i I Sht 3 9,654 SF Z I I� 0.22 Acres ° G -I `D 10 Pump & Fill I I or Remove I BH Cesspools g I (Field Locate) O v� Line EXISting �_; i I _ Dwelling o I t�-I 18 2 J o T. 0. patio Replacei Sewer r I CA N Back to Cost Iron v a I I Cellar Floor 8.8 Exit ',LineI w' M =3.45 rt I I o Water Line m 8.5 c i DmD i 8.2 m 8.5 8.8 :2\ 1 6.0 sh I m D I. J I .•I z9 ao r 7 _-- o ----- 8.6 i CB DH L ------I' F ' Stone I 7.3 Drive I %r) A C6 716 100.16 T 8 7. o 1 w guy N 86°59'50" E o 7.5 _ (n 0 OF hfg�H OF S4 p o=� DANIEL c�G°� MICHAEL P. S u Z 0 CROTEAU LA `' CIVIL DUE.10 u, a No. 46253 o No. 375,,30_ SCALE: 1 "--20 ' 'P��'i'FG/s,_�Rtio`��u. 0' 20' 40' 60' �s/or4AL ELEV. DATUM = NAVD-88 Sh t. I O f2 IN 0 m < -T r4- LOCUS N cD < Q CD m LOCATION MAP Map ID: 33/149 Deed CTF.• 440890 Plan: Bk.443, Pg.80 L.C. Plan: 22356—A Sheet 3, Lot 25 SYSTEM DESIGN Design Flow: 3 bedrooms @ 110 gal/day = 330 gal/day Septic Tank: 330 gal. x 4.5 = 1485 gal. Use: 1500 Gal. Septic Tank Leaching Facility: 6 Rows of 4 Infiltrator Quick -4 Plus (LP) Chambers Proposed Area: 6 x 16 LF of Chamber x *4.73sf/If = 454 sf Capacity: 454 sf x 0.74 gal/1 sf = 335 gal/day *Per Mass.DEP Certification For General Use NOTE: Garbage disposal is not permitted with this design. Note REAS ALTERED BY NEW SEPTIC SYSTEM,m,LAIS.T.r LL&TUN-ARE TO BE GRADED 0 CONTAIN STORMWATER RUNOFFU`iJN1L RJRWTRTY: VSD APR 2 9 2015 ame Date s HEALTH DEPT. ORAN ENGINEERING ASSO.C.,LLC u v 508-432-2878 941 MAIN STREET (RTE 28), HARWICH, MA SEPTIC SYSTEM DESIGN PLAN IN YARMOUTH Prepared For: Patricia Geary 58 NANTUCKET AVENUE S. YARMOUTH MA PROJECT: 74-299 FCALE: I "=20' DATE: 3 70175 /gear -'`l`/� C// -r F � 17 -� 2 T.O.F. Cover At Grade ELEV. 10.45 ELEV. --� �- 13 Cast Iron Frame And Cover At Grade Use Clean Medium Sand TEST HOLE D. 8.3 ' Below, Around and for max 2" Above Chambers *Use Filter Fabric. Above System -Sand Elev. 8.15 4" Perf.lnsp Port w/screw cap & Lawn Box Access to gradeZ40mil Liner aev. 8.35 . 8.05 EI 7.0 to 8.5 Surface El. 9.3 .. .::.......:....::...;`To EI. 8 5..:. Elev. Depth Horizon Texture Color o 6.6 0-20" HTM Fill 18-28" A E 5.7 20-31 " A E Loomy Sand 10YR4/1 Loamy Alarm is to be on 28-48" Loamy Medium Sand 10YR5/8Med 4.3 31-48" B Medium Sand 10YR4/6 0 b) 48-108" C Meium- Fine Sand 2.5Y6/3 Alarm on EI. force main - I Btm El. -0.7 GWE C��" 73" (El. 2.2) b oo bGb bb'bbab obb oo EL. O b O O b 0 O O C O O OO O G C b - I°' 10" drain -back oobbb cboo b b c o b o b o e 3.1 Zabel Co inclined for. 7, X 16' Effluent _ 516 HDRAIN OLE Low Profile St'OneleSS Field! ,* TEST HOLE 2 Filter 4 (-100 iz• _ Check' D -Box 6 Rows of 4 Infiltrator Chambers 1500 GAL: valve 1000 Gal: w�lnlet Tee (Quick 4 Plus Standard -Low Profi/e) EL. 3.8 SEPTIC TANK Pump Chamber Adj. High GW Monolithic Monolithic *B soil -Layer is to be utilized. Factory Waterproof y p SYSTEM PRO -FILE Factor Waterproof Not to sca ie Lawn Box *SAS to P.Chamber Vent Line Not Shown grade 4" screw Ca *Eletrical Permit Required.. p Perforated Pipe Leach Chamber • To Btm. of Chamber Use min.: 2- 3/8 Holes u 1 "vert. spacing INSP. PORT DETAIL SAS DETAIL *Use Clean Medium Sand Around and for 2" Above Chambers *Use Filter Fabric Above Sand nt top of each ie of chamber w/2" pipe 4, Quick 4 -Plus Standard Low Profile Infiltrator Chambers 16' GRO UND WA TER ADJ. Groundwater Found: E 1. 2.2 Index Well: MIW-29 Zone A (1/15, 8.1')=> SEPTIC SYSTEM NOTES Add. High GW Depth= 1.) EXISTING CESSPOOLS ARE TO .BE PUMPED AND FILLED OR REMOVED. .2.) SYSTEM COMPONENTS ARE TO BE SET ON A STABLE COMPACTED BASE. SEPTIC TANK AND PUMP CHAMBER ARE TO BE INSTALLED ON COMPACTED FILL SOIL OR 6" OF CRUSHED STONE ON NATIVE SOIL. 3.) ALL COMPONENTS ARE TO MEET TITLE 5 MATERIAL AND CONSTRUCTION REQUIREMENTS. 4.) SEPTIC TANK, PUMP CHAMBER, AND DISTRIBUTION BOX ARE TO BE WATERTIGHT PER TITLE 5 REQUIREMENTS. 5.) UNSUITABLE SOILS, WHERE ENCOUTERED BELOW EL.8.05 ARE TO BE REMOVED FOR 5' AROUND! LEACHING AREA AND REPLACED WITH TITLE -5 FILL SOIL. *B soil -Layer is not to be removed. 6.) 40 mil. PE OR PVC LINER IS TO BE INSTALLED AROUND SAS AT EL.7.0 TO EL.8.5 7.) Install 2" Vent Line Between SAS & Pump Chamber. 8.) FORCE MAIN IS TO BE CONTINUOUSLY SLOPED TO DRAIN BACK COMPLETELY INTO PUMP CHAMBER AT THE END OF EACH PUMP CYCLE. 9.) DESIGN ENGINEER IS TO CERTIFY SYSTEM INSTALLATION (ELEVATIONS & LOCATIONS) AND OPERATION PRIOR TO BACKFILLING. 10.) PUMP CHAMBER AND DIST. BOX ARE TO BE WATER TESTED AT THE TIME OF THE HEALTH AGENT INSPECTION. 11.) DISTURBED AREA IS TO BE GRADED, LOAMED, AND SEEDED. GRADE TO PREVENT RUN-OFF ONTO ADJACENT LOTS. * Eletrical Permit Required. Sht:2of2 +1.6' E 1. 3.8 NAVD Depth Horizon Texture Color 5min 55sec 0-18" HTM Fill @ Depth Of -41 " in the B layer E 18-28" A E Loamy Sand 10YR411 Qc Witness: Amy VonHone, HA *B soil -Layer is not Loamy Alarm is to be on 28-48" B Medium Sand 10YR5/8Med c 0 48-108" C ineium- Sand 2.5Y6/3 PEEL. TEST @ TH ;2 Time Drop 5min 55sec 12-9" 9min 02sec 9-6" @ Depth Of -41 " in the B layer Perc & Design Rate= < 5 min/inch Date : 1 / 15/ 15 Hole following 2" Check Valve. Performed y: Daniel P. Croteau, PE, SE481 Witness: Amy VonHone, HA *B soil -Layer is not to be removed PUMP NOTES 1) Submersible Pump -Meyer Co.:SRM-4 2) 2" Force Main to drain back into pump chamber at the end of each pumping cycle. Use 5/16" Drain Hole following 2" Check Valve. 3) Alarm Panel - SJE Rhombus Tank Alert -1 4) Alarm is to be on a seperate circuit from the pump. 5) Pump Sequence: a) Pump off El. 3.5 (1'OFF Tank Btm.) b) Pump on El. 4.0 (1.5'OFF Tank Btm,) C) Alarm on EI. 4.5 (2'OFF Tank Btm.) o ,,k OF DANIEL oS P. cn a CROTEAU CIVIL No.46253 STER�G���I SS�ONAL E� (KORAN ENGINEERING ASSOC.,LLC 508-432-2878 941 MAIN STREET (RTE 28), HARWICH, MA SEPTIC SYSTEM DESIGN PLAN IN YARMOUTH Prepared For: Patricia Geary 58 NANTUCKET AVENUE YARMOUTH MA PROJECT: 74-299 Sht:2of2 DATE: 3/70/75 Rev: 4/23/75