HomeMy WebLinkAboutReview ChecklistTOWN OF YARMOUTH
SEWAGE PLAN REVIEW CHECKLIST
Location: A.M. / Lot 4zI Zone of Contribution: In Out Acreage
Street:
Villag
Owner
Addre
Phone:
Builder:
Address:
Phone:
Commercial: Residential:
Floor Plan: # Bedrooms:
Installer:.
Phone:
Engineer:
Phone: 77
87 /t N/A
1. Required # of copies received
2. Date of soils exam and percolation te:
3.4-5 ft of naturally occurring pervious
4. Foundation 2 ft above high point of
5. Water line 10 ft from septic com one
6. Benchmark indicated and shown - NI
7. Septic tank minimum 10 ft from foun
8. Leaching minimum 20 ft full, 15 ft ci
9. Leaching minimum 100 ft from weth
10. Leaching minimum 150 ft from drink
11. Tank/leaching minimum 10 ft from
12. System meets all other setback requn
13. Uses adjustment for maximum high 1
14. Leaching set 4-5 ft above adj. water c------
_____15. System not in top or subsoil (AB horizons) or 5' removal
15.
YES NO
C/'
L/
16. Proposed contours are suitable
17. System meets slope requirements - min. 1/8", '/4" preferred
18. System meets breakout requirements PVC liner: Wall:
19. Specked tee sizes are proper, gas baffle on outlet tee
20. Sewage is under 10,000 gpd for parcel
21. No garbage disposal
22. System adequately sized for its intended use
23. Minimum 6" stone or compacted below tank and dbox
24. Manhole covers within 6" of grade, pump chamber cover to grade
25. Inspection port on plastic chambers/leach field
26. Electrical permit for pump chamber/Separate meter for duplexes
27. Pump system -2" line,weep hole,check valve, tee in dbox, pump size
28. Septic tank/pump chamber to be factory wat roofed
29. Vent provided if leaching below 3 feet, under driveway/parking
30. Buoyancy calculations for tank/pump chamber
31. Engineer to inspect and certify soils: wall: commercial:
32. Engineer/Registered Sanitarian and Land Surveyor stamps/signature
33. H-20 loading is subject to vehicular traffic, groundwater
34. Title V Application and permit fee, installer signature
35. Foundation footing min. 2 feet above adjusted ground water for new house
36. Deed Restriction required max. # bedrooms: max. flow: gpd
37. Check area lots for groundwater/Label groundwater in Assessor's Map
Plan reviewed by: 6/03/03