Loading...
HomeMy WebLinkAbout2015 Jun 02 - Email to J.O'Loughlin Inc. Re: Revisions ' vonHone, Amy From: vonHone, Amy Sent: Tuesday, June 02, 2015 12:09 PM To: 'jolinc@verizon.net' Subject: 23 Outward Reach Mike- I have reviewed the plans and have the following comment: �. Based on where the proposed leach is shown, you will either need to do a removal of the C2 layer in Test Hole 2 in addition to the A& B layers to provide a minimum 4' of suitable sand below the leach facility OR raise the Leach by 0.3' to make sure there is 4' between the top of the C2 layer(EL. 9.8) and the bottom of the Leach Facility. ��'1. If you choose to remove the C2 layer, you will need to revise the note about the 5' removal required. Right now the note only specifies removal of the A& B layers. Call or email with questions. Thanks, Amy Amy L.von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0) 508398-2231 X1241 (F) 508-760-3472 avonhoneCcDvarmouth.ma us 1