Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 2015BM@T.0.F27.25 Corner Of C oncrtete Pad B M @ 20.0 19.5 F. G. 14" TEE AND GAS B AFFLE 1000 GALLON H-10 EXISTING SEPTIC TANK COVER TO WITHIN 6" OF FINISHED GRADE-, 98.7 18.0 17.9 SEPTIC SYSTEM PROFILE NOT TO SC ALE D -BOX F.G. 19.5 MINIMUM 2" PEASTONE OR PIPE TO BE LEVEL GEOTEXTILE FABRIC FOR 2' OUT OF D -BOX TOP @ 16.8 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -17.74 00000000000 000000-00000 6" COMPACT STONE OR COMPACTED BASE OUTWARD REACH 15.8 (2) 500 GAL DRYWELL H-10 WITH 3/4" -1 1/2' OF DOUBLE WASHED STONE 4' ON ENDS AND 3.58' ON SIDES 12.5' X 25' O N -"BOTTOM @ 13.8 y 8.94' jam, n %e 5.56 EL BOTTOM OF #2 TEST HOLE TEST HOLE LOG DATE: 4/22/15 TEST BY: MIKE O'LOUGHLIN WITNESS: AMY VON HONE PERC RATE: < 2 MIN TEST HOLE # 1 n>' 19.3 EL n" TEST HOLE # 2 19.56 EL FI LL DAILY FLOW: (3) BEDROOMS 84" 330 GPD 12.3 EL = 660 GPD B W LOAMY SAND USE: EXISTING 1000 GALLON 108" 10Y 5/8 10.0 EL 64" MEDIUM SAND 14.23 EL a C 2.5Y 7/4 SOIL ABSORPTION SYSTEM: 156" BW 10Y 5/8 6.3 EL 74„ DOUBLE 13.40 EL TEST HOLE # 2 19.56 EL NO WATER ENCOUNTERED BOTTOM OF PERK 88" PRESOAK 9:40 < 9" GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE & UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM IS TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15.00: TI TLE V. 3. THIS PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. DESIGNER TO INSPECT & CERTIFY OVER -DIG, REQUIRED BY PLAN, AND FINAL INSPECTION BEFORE BACKFILL. 5. CONTRACTOR TO PROVIDE 48 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. 6. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 7. THE TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 8. SOILS ARE FOUND UNSUITABLE OR DIFFERING FROM THOSE FOUND IN SOIL LOG CONTACT DESIGNER AND THE BOARD OF HEALTH. 9. AN OVERDIG IS REQUIRED IN BELOW PLAN OR IF UNSUITABLE SOIL FOUND A+B LAYERS, CLEAN GRANULAR SAND MEETING 310CMR 15.255(3) SHOULD BE USED AS FILL MATERIAL, 5' AROUND AND UNDER S.A.S. _- 10. -ALL 4" __P-IPE-CONNEC-TIONS--AT SEPTIC --TANK AND D -BOX -SHALL --- BE MORTARED IN PLACE. IF USING 18' PLASTIC RISER PIPES, THESE TOO SHALL BE MORTARED IN PLACE. DESIGN DATA FILL DAILY FLOW: (3) BEDROOMS 56" 330 GPD 14.90 EL = 660 GPD A LOAMY SAND USE: EXISTING 1000 GALLON H-10 SEPTIC 10Y 3/2 DISTRIBUTION BOX: 64" AS DRYWELL. 14.23 EL a LOAMY SAND SOIL ABSORPTION SYSTEM: 2. A 5' REMOVAL BW 10Y 5/8 USE: (2) 500 GAL DRYWELLS 74„ DOUBLE 13.40 EL AND 3.58' ON Cl MEDIUM SAND SIDEWALL AREA: 75' X 2' X 115" 2.5Y 7/4 X 0.74 = 231.25 GPD C2 SAND LOAMY SOFT = 1901, 2.5Y 6/4 9.38 Et MEDIUM SAND C3 2.5Y 7/4 KEN ETH JANSSON 168" NONE REQUIRED 5.56 EL NO WATER ENCOUNTERED BOTTOM OF PERK 88" PRESOAK 9:40 < 9" GENERAL NOTES 1. CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE & UNDERGROUND, PRIOR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM IS TO BE INSTALLED IN COMPLIANCE WITH 310 CMR 15.00: TI TLE V. 3. THIS PLAN IS NOT TO BE USED FOR PROPERTY LINE DETERMINATION. 4. DESIGNER TO INSPECT & CERTIFY OVER -DIG, REQUIRED BY PLAN, AND FINAL INSPECTION BEFORE BACKFILL. 5. CONTRACTOR TO PROVIDE 48 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. 6. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE DISPOSAL. 7. THE TOP OF ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC MARKING TAPE OR A COMPARABLE MEANS IN ORDER TO LOCATE THEM ONCE BURIED. 8. SOILS ARE FOUND UNSUITABLE OR DIFFERING FROM THOSE FOUND IN SOIL LOG CONTACT DESIGNER AND THE BOARD OF HEALTH. 9. AN OVERDIG IS REQUIRED IN BELOW PLAN OR IF UNSUITABLE SOIL FOUND A+B LAYERS, CLEAN GRANULAR SAND MEETING 310CMR 15.255(3) SHOULD BE USED AS FILL MATERIAL, 5' AROUND AND UNDER S.A.S. _- 10. -ALL 4" __P-IPE-CONNEC-TIONS--AT SEPTIC --TANK AND D -BOX -SHALL --- BE MORTARED IN PLACE. IF USING 18' PLASTIC RISER PIPES, THESE TOO SHALL BE MORTARED IN PLACE. DESIGN DATA SEWAGE PLAN DAILY FLOW: (3) BEDROOMS X 110 GPD = 330 GPD SEPTIC TANK: 330 GPD X 2 = 660 GPD Lc� USE: EXISTING 1000 GALLON H-10 SEPTIC TANK DISTRIBUTION BOX: LU AS DRYWELL. USE: DB -6 H-20 a � SOIL ABSORPTION SYSTEM: 2. A 5' REMOVAL IS REQUIRED TO REMOVE THE A & B LAYERS. USE: (2) 500 GAL DRYWELLS H-10 WITH DOUBLE WASHED STONE 4' ON ENDS AND 3.58' ON SIDES. SIDEWALL AREA: 75' X 2' X 0.74 = 111.00 GPD BOTTOM AREA: 12.5' X 25' X 0.74 = 231.25 GPD TOTAL AREA: 150 SQFT + 312.50 SOFT = 342.25 GPD SEWAGE PLAN ENGINEER: 1. PUMPOUT ONE NOTE EXISTING LEACHING PIT AND REMOVE ALL STEPHEN HAAS LOCATION: Lc� F= CONTAMINATED SOILS. SECOND LEACHING PIT' PUMPOUT AND USE LWl o LU AS DRYWELL. PAUL MARSH a � 2. A 5' REMOVAL IS REQUIRED TO REMOVE THE A & B LAYERS. n� JOB NUMBER: 5-21-15SP SHEET NUMBER: 1 DRW BY KMJ REVISION: Rev June 2, 2015 THE DESIGNER AND THE BOARD OF HEALTH TO INSPECT OVER -DIG 0 PREPA FROM CERTIFIED PLC J. O'LOUGHLIN INC. PLAN BY ELDREDGE SURVEYING -�- Q 3. EXISTING 1000 Q�FEPQKTTO REMAIN. (508) 362-4942 KEN ETH JANSSON NONE REQUIRED VE DI E Date� HEALTH AGENT APPROVAL DATE SEWAGE PLAN ENGINEER: STEPHEN HAAS LOCATION: 23 OUTWARDREACH YARMOUTH MA ' PREPARED FOR: PAUL MARSH W , * d�°, Y: ✓' j: SCALE: 1" = 10' DATE: MAY 21, 2015 JOB NUMBER: 5-21-15SP SHEET NUMBER: 1 DRW BY KMJ REVISION: Rev June 2, 2015 MAP: 125 PARCEL: 7 8 V PREPA FROM CERTIFIED PLC J. O'LOUGHLIN INC. PLAN BY ELDREDGE SURVEYING COMPANY DATED 12/10/13 714 MAIN STREET, YARMOUTH PORT, MA 02675 (508) 362-4942 KEN ETH JANSSON