Loading...
HomeMy WebLinkAbout2015 Jun 30 - Email to Moran Engineering Re: Revisions vonHone, Amy ' From: vonHone, Amy Sent: Tuesday, June 30, 2015 2:45 PM To: Dan Croteau, P.E. (moraneng@gmail.com) Subject: 124 Pawkannawkut Drive, Yarmouth Hi Dan- I have reviewed the septic design for this property and have a couple of questions: ;�,✓I'. Will you be able to run the laterals inside the length of the low profile chambers with the indentation that ' runs the length of the chamber? It looks like you may be able to run the line along either side of the hump but I haven't seen it done before. � The plan states 11 perforations per lateral but I calculate 6 if the perforations are spaced 3.5' apart on a / 20' long lateral. �3. Buoyancy calcs.? .��_4. Specify whether the tanks are H-10 or H-20 and both will need to be waterproofed. Call or email with questions. Thanks for your help, Amy Amy L.von Hone, R.S., C.H.O. Assistant Health Director Yarmouth Health Department 1146 Route 28 South Yarmouth, MA 02664 (0) 508-398-2231 X1241 (F)508-760-3472 avonhone an.varmouth.ma.u s 1