Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Review Checklist
TOWN OF YARMOUTH SEWAGE PLAN REVIEW CHECKLIST Location: AM /02- LOT Date of Subdivision Approval Street Zone of Contribution: In--�_ Out Village Commercial /Residential kv Owner: ZoInstaller I r h► Builder: s 7 1. Reauired number of c 2. Date of soils exam ai 3. 4 feet of naturally occ 4. Foundation 2 feet ab( 5. Water availability lets 6. Benchmark indicated uiiXGj C3lu�Q N/A YES NO 10. Leachiniz a minimum of 100 feet from wetianuzi. 11. Leachintz a minimum of 150 feet from drinkin wells/25 f et from irri ation wells. 12. System meets all other setback requirements. 13. Uses adjustment for maximum high 2roundwater. 14. Leaching 4 -5 feet above adjusted water table or bottom of test pit. 15. System not in t012 or subsoil or 5 foot removal. 7 16. Proposed contours are suitable. 17. System meets slope re uirements - min. 1/8" 1/4" preferred, 18. Svstem meets breakout requirements - eastone elevation carried out 15 feet minimum. 19. Specified tee sizes are pro er, as baffle on outlet tee. 20. Sewa a flow under 10.00012d for Darcel. 21. No garbage disposal. LZ 22. Svstem adequately sized for its intended use. 23. Minimum 6" stone or mechanically com acted below the tank and d -box. 24. Manhole covers within 6" of 2rade - septic tank and VMM12 chamber. 25 Electrical permit for12ump chamber 26. Pump system - 2" line, e12 hole check valve sant in d -box alarm on separate circuit. 27. Septic tank and 12umn chamber to be Factojy waterproofed. 28. Vent provided if leachinQ below 3 feet or under driveway or parking. 29. Engineer to inspect and certify a. clay removal b. wall construction schedule C/ c. commercials stem 30. Enizineer and Land Surveyor stam and signature. 31. H2O loadin T when system subject to vehicular traffic. 32. Title V application and feesi need by a licensed installer. VV- 34. � t I 33. Foundation footing 2 feet above adjusted water table. 34. Lot subdivided prior to July 31. 1986 - Nitrate Loading. t / 35. Subdivided prior io April 7. 1989 - Phosphorus Zone 300'. Plan reviewed by: �� ©; 4-- d