Loading...
HomeMy WebLinkAboutDecision 2652 - D - SP-3 Site Plant; N/F THIRD DUNKIN DONUTS RGAI:CY COMPANY I SItOR RIII I,DI1 ACHING TRENCH TYPE SANITARY DISPOSAL SYSTEM: (NEN) 4" Inv. (high end) - 6 2 -- 4" Im. (low end) - 5.8 7.00 .------- -_-`�'W Bottom of trench - 4.0 Design. ground voter - 0 8.00 7.9, �I T 17`_95 7.47 I CATCH BASIN (NEW) - AGO p 7.43.�j I Rim: 7.00 1) I Inv.: 4.00 r, 7.87 Sump: 1.50 $ 2 - '.DIS'fitEBOTION BOR (NEW) 7.36ff S -O. DOS 8 7.25-�,\`��" �I T. P. 03 Inv. in •l. �.� ��._-''- 7.75 bBlT11 r- 9 00 Bo[tamuofTop of stankbox .5.42 _'-I �5 P•)-_ --�......... FERC. TESTI A� `\1 -16.17 _ I { °& it T.P. $3' \) CATCH BASIN (NEW) I8'3 Rim: 7.00 I :I Inv.: 4.00 1 Sump: 1.50 3 3 .25 q ELEV: 7.75 7.18 i g 7.46 1 �i t • i j; I l!1�0. w 9.0o - 3' CLEAR SEPARATION - BETWEE1 CURB g LOT S LIGTu BASE. (TYP) a (i _ t' ( LEACHING TRENCH TYPE STDPM • . (� DISPOSAL SYSTEM (NR89 L Top of trench - 5.77 Top of pipe - 5.M - 1 i II •' 12''1 Inv. - 4.00 Bottom of scone - 2.0) 1 t Design ground water elev.- 0. I 0 - e31 E.02 -i-..-.. 1[gl--r-JtATCH-BAS-17 (I- 0 1 Rim: 7.00 I.P. f2 - Inv.: 4.00 ' O - Sump: 1.50* . I I • 'd V.P. i ROUTE 2 j 8.27 .6.25 8.09 8.S; i 8.50 8.65 PUDI,iC RI1,H1 OF WAY) N/F J011ti K. SH(JI'1 I'tii_ (I?JI'{F l'ARI��I'� RI_I_III.' RL•'TAIL STORKS, POST OFFICF AND AMUSEMENI' CENTER BOWLING/YIDGO GAMES), C.B. SUBSOIL EXPLORATION RES'_TS TEST PIT Ill ( 10 MAR 89 ) SURFACE ELEVATION: 8.4 0-6" Topsoil 6"-66" Sandy yellow-brown fill 66"-72" Original topsoil 72"=84" Yellow sandy subsoil 84"-120" Fine gray -brown sand Bottom of Test Pit Elev.: -1.6 Ground water at 9'-6" or Elev. -1.1 TEST PIT #2 ( 10 MAR 89 ; SURFACE ELEVATION: 8.4 0-6" Topsoil 6"-66" Sandy yellow-brown fill 66"-72" Original tops)il 72"-88" Yellow sandy Zubsoil 88"-124" Fine gray -brows sand Bottom of Test Pit Elev.: -1.93 No water encountered to Elev. TEST PIT #3 ( 10 MAR 89 ) SURFACE ELEVATION: 7.8 0-4" Topsoil 4"-28" Sandy yellow-brown fill 28"-44" Original topsoil 4411-6211 Ye_low sandy subsoil 62"-120" Fine gray -brown sand Bottom of Test Pit Elev.: -2.2 Ground water at 9'-6" or Elev. -1.7 TEST PIT A ( 22 FEB 72 ) SURFACE ELEVATION: 8.5 G-10" Loam &Isubsoi' 10"-48" Clean sand fil_ 48"-66" Subsoil 66"-102" Medium -fin=_ sand Bottom of --est P_t Elev.: 0.0^. Ground wate_ at 8'-6" or Elev. 0.00 B-5 ( OBSERVATION WELL ) WATER TABLE READING ( 29 MAR 89 ) SURFACE ELEVATION: 8.00 Ground water at P.00' or Elev.: 0.00 PERCOLATION TEST A ( Adjacent to Test P=- #2 ) DEPTH: 5'-611+ Rate: Less tha_. "< minutes ler inch. CONSTRUCTION NOTES 1. THE CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND PROPOSED CRITICAL ELEVATIONS (BUILDING FINISH FLOOR, DRIVEWAY ENTRANCES, WALKS, DRAINS, SEWERS, CURBS, RAMPS, ETC.) AT GROUNDBREAK, NOTIFY McDONALJ'S PROJECT MANAGER OF ANY DISCREPANCIES BETWEEN FIELD AND PLAN INFORMATION. 2. PROPOSED ELEVATIONS SHOWN F85.421 REFER TO TOP OF PAVEMENT ELEVATION; FINISH WALK AND CURB ELEVATIONS SHALL BE 6" ABOVE FINISH PAVEMENT. 3. EARTHWORK: THE CONTRACTOR SHALL REFER TO THE "SPECIFICATIONS FOR THE 89 SERIES STANDARD BUILDINGS" AND THE GEOTECHNICAL ENGINEERING REPORT FOR THE PROPOSED McDONALD'S RESTAURANT LOCATED ON ROUTE 28 IN SOUTH YARMOUTH, MASSACHUSETTS (PREPARED FEBRUARY 27, 1985)" BY BRIGGS ASSOCIATES, INC. RECO%24ENDATIONS MADE IN THE REPORT ARE BASED ON SOILS OBSERVATIONS MADE AT VARIOUS SOILS TEST LOCATIONS SHOWN ON THE PLAN (TP = TEST PIT, B = BORING) AND ARE TO BE USED BY THE CONTRACTOR IN ACCORDANCE WITH THE LIMITATIONS DESCRIBED IN BOTH THE REPORT AND THE STANDARD SPEC- IFICATIONS. THE CONTRACTOR SHALL REPORT TO THE PROZ3CT MANAGER ANY FIELD VARIATIONS IN THE SOIL OR GROUNDWATER CrNTrTTIONS ENCOUNTERED THAT WOULD REQUIRE ALTERATION OF THE MATERIAL AND/OR CONSTRUCTION PtETTtODS 9.46 UNDER THIS OR OTHER SECTION OF THE CONTRACT. 9.18 - 9.88 9.310 '8.68 8.88 8.86 9.16 FR 1 F,NDLY I S RESTAURANT i+hid C�Ek% & SP iu'' D(,0)YARMOUTd N.:'ua [�AYI 3 0 X989 y fppk c x rl z� V) BE Be � Be E` Re, Vm. 81 U RARING : PLAI` 'ITH SEWAGE DISPOSAL SYSTEM ELEVATIONS