Loading...
HomeMy WebLinkAboutApp-Permit-ComplianceYARMOUTH HLALl M vr—r I . No. ' �O / xe 1 146 ROUTE 28 �5�—"� FEE 57 SO. YARMOUTH, MA 02664 Board of Health, , MA. APPLICATION FOP, DISP®AL SYSTEM CONSTRUCTION PERMIT Application for a P rmi� to Construct( ) Repair( ) Upgrade( ) Abandon( - ElComplete System LJIndividual Components Location �� �� Owner's Name Map/Parcel# Addresses bd Lot# &-10 AICX_,) Installer's Name ,T,f.�� �A j V—, Designer's Name Addresse5 J address Telephone# Telephone# Type of Building Lot Size 2�6 sq. ft. Dwelling - No. of Bedrooms � Garbage grinder (7D Other - Type of Building No. of persons Showers ( ) , Cafeteria ( ) Other Fixtures Design Flow (min. required) gpd Calculated design flow f Design flow provided gpd Plan: Date Number of sheets Revision.Date "title Description of Soil(s) _ Soil Evaluator Form No. Name of Soil •-DESCRIPTION OF REPAIRS OR ALTERATIONS Date of Evaluation a The undersigned agr s to install the above described Individual Sewage Disposal System in accordance with the provisions of TITLE 5 and further agrees t t 1 e the ste o r tion until a Certificate of Compliance has been issued by the Board of Health. Signed Date .6— Inspections N..77`69 COMMONWEALT14®F MASSAC14US ETTS Board of Health, MA. CERTI 'ICTE OF COMPLIANCE Description of Work: ❑ Individual Component(s) ❑ Complete System FEE The undermined hereby certify that the Sewage Disposal System; Constructed ( ), Repaired ( ), Upgraded ( ), Abandoned ( ) by: z� d at has been installe accordance with the provisions of 31'6 CMR 15.00 (Title) and the approved design plans/as-built plans relating to application No. - 6 , dated Z Approved Design Flow �:(gpd) Installer G 1' S . Designer: �C.(/E�� lL3'� Inspector: Date: The,Usuancb -f_ this permftshallnot-be-construed>as a. guarantee:tha e_system-will-function-as.clesigned... No. r FEE f-� -i COMMONWEALTH Of MASSACHUSETTS LZ/ i Board of Health, , MA. DISPOSAL S YSTC®NSTRUCTI®N PERMIT Permission is hereby granted to; Construct( ) Repair( ) Upgrade ( ) Aban�on ( ) an individual sewage disposal system at Disposal System Construction /ermit No. c��z> dated as described in the application for Provided: Construction shall be completed within three years of the date of this permit. All local conditions must be met. Form 1255 Rev. 5/96 A.M. Sulkin Co. Boston, MA Date /1) Board of Health