Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Decision 2302 Sewage Disposal System Design
SOILTEST PIT DATA: INDICATES _ INDICATES PERC. -� OBSERVED TEST GROUNDWATER TP w'l TP Z TP TP GRD. EL. 9' f� GRD. EL. 451. zJ GRD. EL. GRD. EL. — ^ W. EL. /-0o GW. EL. / 70 GW. EL. DATE: DATE: DATE: DATE: TEST BY: TEST BY: TEST BY: WITNESSED BY: WITNESSED BY: WITNESSED BY: I - c.':. > x:?, i PERC. RATE: PERC. RATE: PERC. RATE: MIN,/INCH Z MIN./INCH MIN./INCH DATE: TEST BY: WITNESSED BY: PERC. RATE: MIN./INCH DATUM: VERTICAL DATUM: �,3 , BENCH MARK USED: FIYDP-AOT T-Acl T3oL_T III '5Z % E•LEV IS, #4 T -AY -EN FIZoH A PLAN LLy TltE Tota" of YA R_ FA o uTR-t E FJC, t h 7E E R I IJ C� DEPT OF- TT} (✓ PRrJAoSE►7�/\RL t Acll_I-f Y,Dc)p_c-H tPRnpr__RT H ►G H CP_O UK)b v,)AT F2 LLVF_-.L G0)`APUT,4 (10K_')' STEP I- Measure depth to water table to nearest 1/10 ft. __._.-._..___......_._.-_______._._..____.•__._. Date omh/Qav/Year STEP EP 2 Using Water -Level Rance Zone C11 PRAMLAN9GRAM NOT TO SCALE and Index Weff Map locate - 4" INVERT AT SEPTICTANK0n) i11,51 Af-,E, EQUAL. site and determine: ......�� NOTE: LEACHING CHAMBER TO BARNSTABLE VILLAGE, MA 02630 DTESI OAppropriate index -- _____ I I-Z1-� /A.>VA-PTS, 5�1�'T1C Tli-)J�1 L DIST. BOX TO WITHSTAND HZO LOADIN(' DRIVES OR TRAVELED © Water -level range zone 3� p� c>. A. WAYS. / z NAN"OLE CDVrri t=. ----� eaa,c.,r To c1N,� r.z,, t 3 2. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF Water Resources Conditions" -- Z >1 cr7 cE r{cN GALLL+ INLET PIPE EXCEEDS 0.08 FT/FT. OR IN L z •i determine ci,rrent depth to PUMPED SYSTEM. Q �_ DATE: DATE: DATE: DATE: TEST BY: TEST BY: TEST BY: WITNESSED BY: WITNESSED BY: WITNESSED BY: I - c.':. > x:?, i PERC. RATE: PERC. RATE: PERC. RATE: MIN,/INCH Z MIN./INCH MIN./INCH DATE: TEST BY: WITNESSED BY: PERC. RATE: MIN./INCH DATUM: VERTICAL DATUM: �,3 , BENCH MARK USED: FIYDP-AOT T-Acl T3oL_T III '5Z % E•LEV IS, #4 T -AY -EN FIZoH A PLAN LLy TltE Tota" of YA R_ FA o uTR-t E FJC, t h 7E E R I IJ C� DEPT OF- TT} (✓ PRrJAoSE►7�/\RL t Acll_I-f Y,Dc)p_c-H tPRnpr__RT H ►G H CP_O UK)b v,)AT F2 LLVF_-.L G0)`APUT,4 (10K_')' STEP I- Measure depth to water table to nearest 1/10 ft. __._.-._..___......_._.-_______._._..____.•__._. Date omh/Qav/Year STEP EP 2 Using Water -Level Rance Zone REVISIONS: PRAMLAN9GRAM NOT TO SCALE and Index Weff Map locate - 4" INVERT AT SEPTICTANK0n) i11,51 Af-,E, EQUAL. site and determine: ......�� NOTE: LEACHING CHAMBER TO BARNSTABLE VILLAGE, MA 02630 DTESI OAppropriate index -- _____ I I-Z1-� /A.>VA-PTS, 5�1�'T1C Tli-)J�1 L DIST. BOX TO WITHSTAND HZO LOADIN(' DRIVES OR TRAVELED © Water -level range zone 3� p� c>. A. WAYS. / Using monthly report "Current NAN"OLE CDVrri t=. ----� eaa,c.,r To c1N,� r.z,, t fo R EV IS ¢ S t T>ti Y) L1 • 27 - $ 1C7/i 1L 2. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF Water Resources Conditions" -- Z >1 cr7 cE r{cN GALLL+ INLET PIPE EXCEEDS 0.08 FT/FT. OR IN L z •i determine ci,rrent depth to PUMPED SYSTEM. Q �_ -7- 'C SOUTH SHORE DRIVE water level for Index • ,"i�� K T'2&As( •,.- \ GENERAL NOTES: . M"I WILL 6"Y'Fe Gfi OT 'to rgvl 4sw m nmrvear EkPAN)bSb Iti FLJTUMFL 10 5000 (3173D (I000 PP_0PLf,) STEP 4 Using Table of Water -level Adjustments El CT h CONSTRUCTION OF THE SEWAGE for index well (STEP 2A), current depth ,<»<<. 'E'E ns a n. e di DISPOSAL FACILITY ONLY. to water ley-! for index we!1 (STEP 3), 2. ALL CONSTRUCTION METHODS AND ZO " `' I.t; --�-L` z' and water-fevel zone (STEP 28) 1L ;, DATE: DATE: DATE: DATE: TEST BY: TEST BY: TEST BY: WITNESSED BY: WITNESSED BY: WITNESSED BY: I - c.':. > x:?, i PERC. RATE: PERC. RATE: PERC. RATE: MIN,/INCH Z MIN./INCH MIN./INCH DATE: TEST BY: WITNESSED BY: PERC. RATE: MIN./INCH DATUM: VERTICAL DATUM: �,3 , BENCH MARK USED: FIYDP-AOT T-Acl T3oL_T III '5Z % E•LEV IS, #4 T -AY -EN FIZoH A PLAN LLy TltE Tota" of YA R_ FA o uTR-t E FJC, t h 7E E R I IJ C� DEPT OF- TT} (✓ PRrJAoSE►7�/\RL t Acll_I-f Y,Dc)p_c-H tPRnpr__RT H ►G H CP_O UK)b v,)AT F2 LLVF_-.L G0)`APUT,4 (10K_')' STEP I- Measure depth to water table to nearest 1/10 ft. __._.-._..___......_._.-_______._._..____.•__._. Date omh/Qav/Year STEP EP 2 Using Water -Level Rance Zone REVISIONS: PRAMLAN9GRAM NOT TO SCALE and Index Weff Map locate - 4" INVERT AT SEPTICTANK0n) i11,51 Af-,E, EQUAL. site and determine: ......�� NOTE: LEACHING CHAMBER TO BARNSTABLE VILLAGE, MA 02630 DTESI OAppropriate index -- _____ I I-Z1-� /A.>VA-PTS, 5�1�'T1C Tli-)J�1 L DIST. BOX TO WITHSTAND HZO LOADIN(' DRIVES OR TRAVELED © Water -level range zone 3� p� c>. A. WAYS. STEP 3 Using monthly report "Current NAN"OLE CDVrri t=. ----� eaa,c.,r To c1N,� r.z,, t fo R EV IS ¢ S t T>ti Y) L1 • 27 - $ 1C7/i 1L 2. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF Water Resources Conditions" -- Z >1 cr7 cE r{cN GALLL+ INLET PIPE EXCEEDS 0.08 FT/FT. OR IN L z •i determine ci,rrent depth to PUMPED SYSTEM. LAYEF —_ —elk i,rtl uact _ �_ 5 8 'C SOUTH SHORE DRIVE water level for Index • ,"i�� K T'2&As( •,.- \ GENERAL NOTES: . M"I WILL 6"Y'Fe Gfi OT 'to rgvl 4sw m nmrvear EkPAN)bSb Iti FLJTUMFL 10 5000 (3173D (I000 PP_0PLf,) STEP 4 Using Table of Water -level Adjustments El CT h CONSTRUCTION OF THE SEWAGE for index well (STEP 2A), current depth ,<»<<. 'E'E ns a n. e di DISPOSAL FACILITY ONLY. to water ley-! for index we!1 (STEP 3), 2. ALL CONSTRUCTION METHODS AND ZO " `' I.t; --�-L` z' and water-fevel zone (STEP 28) 1L ;, MASS. D.E.Q.E. TITLE 5 AND LOCAL determine water -level adjustment ___..__.._ -._..-.____ _ Q' 9 STEP 5 Estimate depth to high water -TTFi angios B� T�f`� vl Eu) ca�ss sF�t Ic.'J by subtracting the water - OR TRAVELED WAY SHALL BE level 2diustment (STEP 41 SCHEDULE 40 OR EQUAL. from measured depth to water /' level at site (STEP 1) ......................... 4. AL4 150>rLS SEPTIC TANK DETAIL: 4000 GALLoQ NOT TO SCALE N•Zo Loop/u4 NOTES: I. SEPTIC TANK SHALL BE STEEL 4. INLET AND OUTLET TEES TO BE CAST IRON, REINFORCED CONCRETE. SCHEa 40 PVC OR CAST -IN-PLACE CONCRETE. TEES 2. SEPTIC TANK TO WITHSTAND H 20 LOADING TO BE CENTERED UNDER MANHOLE COVER. 3. ALL PIPE CONNECTIONS AND CONCRETE MANHOLE COVER CONSTRUCTION TO BE WATERTIGHT. BROUGHT TO FINISH GRADE 13.'1 2" MIN COVER NORMAL WATER LEVEL r-= - - - - - - - - - - - - - - - - - -� r„ 1 I 3., INLET TEE ' C-7 PRECAST I,. / ;Ik. [OU , ✓ 4'- 0" MIN. OUTLET SEPTIC I'S 0 LIOUID DEPTH TEE 7 s1 _ TANK 1•T71ff _ 1 1 1 I OBOTTOM ON LEVEL STABLE BASE O,�D a PLAN om— PLAN VIEW CROSS-SECTION VIEW T�P)CA, L PAVEMENT PE.•TAIL. W07 TO SCALE DISTRIBUTION BOK DETAIL: LEACHING 1=AGILITY DETAIL• NOT TO SCALE J� 1 1 1 I I U PRECAST I - 3o" ; I DIST. I I BOX f I j I I PLAN VIEW REMOVEABLE� CNA 3 � P, W_ •.' T J1 I' 1 r -T SEE 1 � NOTE 2 �i�� 4"OUTLE7 L F7ti 1.. CROSS-SECTION 12" GTZc)'VE.L 4" c4 IRONC1rS • REVISIONS: PRAMLAN9GRAM NOT TO SCALE NO. DATE QQ 4" INVERT AT SEPTICTANK0n) i11,51 Af-,E, EQUAL. NO. OF OUTLETS: —1_ NOTE: LEACHING CHAMBER TO BARNSTABLE VILLAGE, MA 02630 DTESI WITHSTAND ODING V, WHEN LO ATED UN ER I I-Z1-� /A.>VA-PTS, 5�1�'T1C Tli-)J�1 L DIST. BOX TO WITHSTAND HZO LOADIN(' DRIVES OR TRAVELED Z S'2$ -SG 6fP'T)L YANG 3� p� c>. A. WAYS. a -IS 8rn Ante LITE. bF.TAILS TITLE: NAN"OLE CDVrri t=. ----� eaa,c.,r To c1N,� r.z,, t fo R EV IS ¢ S t T>ti Y) L1 • 27 - $ 1C7/i 1L 2. PROVIDE INLET TEE OR BAFFLE WHERE SLOPE OF SYSTEM IVB A DESIGN -- Z >1 cr7 cE r{cN GALLL+ INLET PIPE EXCEEDS 0.08 FT/FT. OR IN L z •i FOR PUMPED SYSTEM. LAYEF —_ —elk i,rtl uact _ �_ 3. FIRST TWO FEET OF PIPE OUT OF DIST ' I r-? - '-Q'*��' _ 1 4 SOUTH SHORE DRIVE BOX TO BE LAID LEVEL, ,"i�� K T'2&As( •,.- \ GENERAL NOTES: . M"I WILL 6"Y'Fe Gfi OT 'to rgvl 4sw 4' I LEACJ�I 4ALLL�' I Z, 3k' IVr,. a ,\ / 3.Z9' EkPAN)bSb Iti FLJTUMFL 10 5000 (3173D (I000 PP_0PLf,) �HSIEO - t� s �c 1. THIS PLAN IS FOR DESIGN AND El CT h CONSTRUCTION OF THE SEWAGE ,<»<<. 'E'E ns a n. e di DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND ZO " `' I.t; --�-L` z' MATERIALS SHALL CONFORM TO 1L ;, MASS. D.E.Q.E. TITLE 5 AND LOCAL �'------�' _ BOARD OF HEALTH REGULATIONS. -TTFi angios B� T�f`� vl Eu) ca�ss sF�t Ic.'J 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. - -- -- - INVERT 11=3 CA/ 4. AL4 150>rLS 12" GTZc)'VE.L 4" c4 IRONC1rS / T % 1 . 5f-1I:NL.L 13.E�. wg7F�.V_ -rieS'TV I) PRAMLAN9GRAM 4" INVERT AT BUILDING TO VeF-IFY INVtRT ELEVATIoNg BritCk Lt=vf.t.1236 4" INVERT AT SEPTICTANK0n) i11,51 Af-,E, EQUAL. CoARsE ser 1&3 Ee-T> C>F� / 4" INVERT AT SEPTIC TANK(out) 1.065,FULL — BARNSTABLE VILLAGE, MA 02630 4" INVERT AT DIST. BOX0n) /0.qb I" BIT COLIC WEAR I °--'—� >! t,L`�–•' ' I 4`MILo L -POLY vsn PE.ASTOwt E 5VRFAC(CLR55_1 is 4" INVERT AT DIST. BOX(out) /O. (sr OTHERS) 41,LA%(SP- PSASTOWC411 INVERT AT LEACH . (_ 59 CONSTRUCTION NOTES: - Y q 1, ALL. PAVED A1 -2 -EAS W5TUR13EV 8� C' BIT ColJC tz-1 t3 4 MIN o1= 80TTOtv9 OF LEACH G,l�it1 Ey': �v (t7 PRoPoSiWD Ga►.SSTFtt�GTto>J SHRLL GAARSE (Tri-,) ' 5e- CoveJ7,ST> wrni 12. 161Z=)VsL (SN o�s=Rs) VAI, ToIy2." ADJUSTED GROUNDWATER ELEV. 2./0 �• to \ A1..tDc.ot�f1PAC1'Fb `rb t�IATGH OBSERVED GROUNDWATER ELEV. �'�� r,X1STt>� An3AGEuT stvlavES, �o zo IZ!' COMPACTED GPAVEL STO)!Q �A OR J ti , 4„ DENSEGRAbED �' ARfcGRS'i col.�caaTe Z°FUTURE 5EPT1G 5Y$TE>vl YP.,OCE55 bT>FJE CHER PfPcwNG PIT +I --2p I,pAaIrIG XpA13S101.3 5H�1LL 13 1 1: >,IS�'RLL>;j> �' �EARaeul>uG LC 7 EL 3.}. MisjIM1JN1 A>~f, s� Rpt>1T10IJAt_ PAt:Z-K-I JG C01�1PACT'ED SCt3GF{AbE v A►..>Tj BEQIGN AP-SRNRv1: gE>:1.1 ' LA/ 6PT DIA MIN q/ $O( TOM OF cpK) gAS11� EXPALJbEZj �$i aTNERs� . SHRLL R£ STAT LEgS-f 3 FuTuRE 9EPT1C S`C5TEM 1' A1SoVE Ao3Uss rED wA-I•'E•7Z S,rA^IMRO PRECg5T LFljCt11M6 $ASN FILV-VATION EkPAUStor.l sF{gLL BE mAVt✓ i %N A>c,Di sG 4 C,ALL>rX5 TO EF1C1� r,fcr To eCRLF_ F_lJD of= PIZ0P0,51;a rows o r GPILLE'lf S IIJ ACCOt_T?Ht`iC£ W1Ti) T 1TLI:s . DESIGN CRITERIA:' DESIGN FLOW. 5 _IC !'F�.t- T!>r LE -T wn57� 6i_, c -y � `• G4L�pF r,c. /n<tY 777z_f / _7_ D Peeru4 es 075 GPD A)fAl S_kop/Y1_- REQ IU RED D P SEPTIC TANK °ten' CAPE COD SURVEY TWO TAIJIC5(20 CONSULTANTS GAL. SEPTIC TANK PROVIDED: = 4000 GAL. 3261 MAIN ST./ROUTE 6A Two Pr.ovt b 1,1) BARNSTABLE VILLAGE, MA 02630 SIZE OF LEACHING FACILITY REQUIRED: (617) 362-8133 DESIGN PERC. RATE: - .__ -G Z'._ MINANCH DIVISION OF BOSTON SURVEY CONSULTANTS INC. 3� p� ENGINEERING • SURVEYING • PLANNING — - - - -- --- - TITLE: SEWAGE DISPOSAL SIZE OF LEACHING FACILITY PROVIDED: SYSTEM IVB A DESIGN -- Z >1 cr7 cE r{cN GALLL+ - - e_i FOR PARKERS BEACH _- -- Siv�'S f""`7�J_5F 1C Z5=2Z2';PD BATH HOUSE Tr9�23 3So/ .c PD SOUTH SHORE DRIVE S. YARMOUTH, MA. FVT'L�R�. E-XP�t�s�slaN: LEAC 41UG 16VZTEN1 S+tOWt t MAY ISE EkPAN)bSb Iti FLJTUMFL 10 5000 (3173D (I000 PP_0PLf,) PREPARED FOR: 8`f (ibt>1+.1G a GA't TO EACH ROW OF GflLLEtfS• TOWN OF YARMOUTH 2 ROWS OF 20 - 'I'v 9 ' LEACH GA UV YS tdI`TH g' STOWrt. ALL A1Zc)0Wi): E=ACH R 0W SOTT09= 1056sF Y, 1, o = 105G GPD SIDES G176SF XZ.'5 = E54S GFI> TOTAL 1614 5F 'Z6 OI DP -T" 334$SF 5202 6Pb �T OTA L DATE: COMP./DESIGN: ,I CHECK: P� ' DRAWN: G.G.M. FIELD: G.G.M./J.V.B. s , tJ Jj FILE NO: DWG. NO: /G y 7 JOB NO: 1539-00 SHEET: OF: Z