Loading...
HomeMy WebLinkAboutEngineered Plan - 2015ACCESS COVERS MUST BE WITHIN 6" OF FINISH GRADE>r. GAS INSPECTION PORT FIRST 2' TO BE LEVEL -7 9" MINIMUM. 6' MAXIMUM COVER 4'VENT WI TH CHARCOAL FILTER 18' MIN CLEAN SAND BACKF I L L 99.3 - 14-9 "—AROUND AND 2" OVER CHAMBERS 99.22 9 /6 OUTLET 24 HIGH CAPACITY INFILTRATOR EXISTING D -BOX CHAMBERS IN BED FORMATION 1000 SEPTIC N Permit valid for REPAIR OF SEPTIC SYSI'1' M ONLY, due to State and I +real septic variances. Board of Ilealth review anal"approval is required for any future additions/renovit tions/alterations to sewage f�u•ilities and/or structures/dwelling. Yarmouth Health I)eparttuent e Date INVERT ELEVATIONS: INDICATES INVERT OUT SEPTIC TANK: 100.2 INVERT` IN DIST. BOX: 99.47 INVERT OUT DIST. BOX: 99.3 INVERT IN LEACH CHAMBER: 99.22 BOTTOM OF LEACH CHAMBER: 98.3 6JUSTED GROUND WATER: NIA 6BSERVED GROUND WATER: NIA 160TTOM OF TEST HOLE #1: 91.0 DESIGN CRITERIA: DESIGN FLOW: 3 BEDROOMS AT 1/0 G.P.D. PER BEDROOM EQUALS 330 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 20OX - 660 GAL. .4FPTIC TANK PRnVInFnr lnnn Gdl FXISTING L 0CUS MAP GENERAL NO TES : 1. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MA TER I AL S AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR .TRAFFIC OR GREATER THAN 3 ' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING ITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL: 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE: BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE". 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR L OCA T I ON OF UNDERGROUND UTILITIES. 8. EXISTING LEACH FIELD TO BE ABANDONED. SOIL TEST PIT DATA PLAN 156'r L- 91.0 DATE: JULY 22. 2015 TEST BY: STEPHEN HAAS WITNESSED : AMY l I R ED • PERC RATE:BI 4 MIN/INCH VONHONE 'L 1 ANCE VSTRUCTION REQUIREMENTS FOR ALL SYSTEM COMPONENTS VTS SHALL BE NO DEEPER THAN 36" BELOW GRADE. SAS TO BE BETWEEN 4' AND 6' DEEP. :WAGE DISPOSAL REGULATIONS )CATION OF DISPOSAL FACILITIES ;AS AND A WETLAND. 82 ' IS PROVIDED TO AN VCE IS REQUESTED. YS TEM LEES I ON NE. MAP / 32. PARCEL 18 '-HPOR T. MA. PARED FOR: > SAWYER SEPTEMBER 1 4 . 2015 PHEN A. HAAS ENGINEERING, INC P.O. Box 16 South Dennis, MA 02660 (508) 362-8132 JOB NO: 15-0401 INDICATES V INDICATES PERCOLATION = OBSERVED TEST GROUNDWATER 0" HORIZON TEXTURE COLOR 104.0 A LOAMY IOYR SAND 3/4 IO" ----- ---- -- ---- 103.2 B LOAMY IOYR SAND 5/6 30' ----- --- -- - - - -- 101.5 C / FINE -MED IOYR SAND 7/4 60' ----- --- - - - ---- 99.0. 80" C2 FINE LOAMY IOYR SAND FIRM 6/2 96' - ---- -- -- - - - - -- 96.0 C3 MEDIUM IOYR SAND 6/6 PLAN 156'r L- 91.0 DATE: JULY 22. 2015 TEST BY: STEPHEN HAAS WITNESSED : AMY l I R ED • PERC RATE:BI 4 MIN/INCH VONHONE 'L 1 ANCE VSTRUCTION REQUIREMENTS FOR ALL SYSTEM COMPONENTS VTS SHALL BE NO DEEPER THAN 36" BELOW GRADE. SAS TO BE BETWEEN 4' AND 6' DEEP. :WAGE DISPOSAL REGULATIONS )CATION OF DISPOSAL FACILITIES ;AS AND A WETLAND. 82 ' IS PROVIDED TO AN VCE IS REQUESTED. YS TEM LEES I ON NE. MAP / 32. PARCEL 18 '-HPOR T. MA. PARED FOR: > SAWYER SEPTEMBER 1 4 . 2015 PHEN A. HAAS ENGINEERING, INC P.O. Box 16 South Dennis, MA 02660 (508) 362-8132 JOB NO: 15-0401