HomeMy WebLinkAboutDecision 4047 - Civil Detail Sheet26"
MANUF. Le BARON, BROCKTON, MA
MODEL: LK 110
LABEL SEWER OR DRAIN AS APPROPRIATE WEIGHT: 475 LBS
TYPICAL ACCESS COVER
SCALE: 3/4" = C-0"
BUILDING DOWNSPOUTS 6" LOAM & SEED
ALL DISTURBED
` AREAS (TYP,)
}l�lCLEANOUT
TO GRADE NI
/8"
6"OSCH40 ROOF DRAIN
TO DRAINAGE 2% MIN.
COLLECTOR PIPE 12" SDR35 PVC AT 0.5% MIN.
ROOF DRAINS
GENERAL NOTES: NOT TO SCALE
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE
(1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR
EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND/OR THE MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STANDARD
SPECIFICATIONS FOR BRIDGES AND HIGHWAYS AS AMENDED TO PRESENT.
ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5.
AND YARMOUTH HEALTH REGULATIONS.
3. VERTICAL DATUM IS NGVD29 ASSUMED FROM TOWN G.I.S. DATA
4. ALL ROOF RUNOFF 70 BE PIPED TO DRAINAGE SYSTEM. COORDINATE DOWNSPOUT LOCATIONS
WITH ARCHITECT. ROOF DRAINS 6"OSCH40 PVC AT 1% MIN. PITCH TO ORYWELLS/DRAINAGE
5. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHTO-H-20 UNLESS NOTED.
6. THIS PLAN IS FOR PROPGSED WORK ONLY AND IS NOT TO
BE USED FOR PROPERTY LINE STAKING.
7. ALL STORM RUNOFF TO BE CONTAINED ON SITE. PROVIDE VEGETATED SWALES IN
PERIMETER AS REQUIRED TO ENSURE RUNOFF IS RETAINED.
8, 4" LOAM AND SEED ALL DISTURBED AREAS NOT PAVED. JUTE NETTING ON ALL SLOPES >10%.
9. ALL SEPTIC PIPING 4"05CH40 PVC AT 1% MIN. UNLESS NOTED.
10. SEPTIC COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHCUT
INSPECTION BY OWNERS ENGINEER AND PERVISS'ON DETAINED.
11. COORDINATE UTILITY INSTALLATIONS WITH APPROPRIATE VENDORS. '
12. SITE LIGHTING SHALL NOT CAUSE GLARE FOR MOTORISTS, PEDESTRIANS,
OR NEIGHBORING PREMISES.
13. TOPOGRAPHY AND DETAIL LOCATION FROM FIELD SURVEY BY DOWN CAPE
ENGINEERING. ABUTTING BUILCINGS FROM G.I.S. DATA- APPROXIN!ATE
14. ALL FILL AREAS ARE TO BE CLEARED AND GRUBBED, WITH TOP AND SUBSOIL REMOVED
PRIOR TO FILL PLACEMENT. ALL FILL TO BE CLEAN STRUCTURAL FILL COMPACTED IN 5"
LIFTS T0.95% MODIFIED PROCTOR MAX. DENSITY. AREAS UNDER BUILDINGS TO BE
MONITORED :AND INSPECTED BY FOUNDATION ENGINEER. 48 HR. NOTICE REQUIRED.
15. FIRE SPRINKLER SYSTEM TO BE INSTALLED IN BUILDING. FIRE CONNECTION AND
ENGINEERED PLANS (BY OTHERS) REQUIRED TO CODE COORDINATE LINE W/WATER CO.
16. ALL PROPOSED PAVEMENT TO BE FINISHED WITH CAPE COD BERM 12" X 3"
BERM TO BE CREATED INTEGRAL WITH BASE AND TOP COATS OF ASPHALT WHERE NOTED.
17, GRADE ALL LAWN AREAS TO PROVIDE POSITIVE PITCH AWAY FROM BUILDINGS TO DRA'NS/SWALES.
18. SEE LANDSCAPE PLAN FOR PROPOSED PLANTINGS.
6" LOAM & SEED OR OTHER STABILIZATION- SEE LANDSCAPE PLANS
FIRST FLOOR - - (TYP.) \
76.51
\ 72.1±
71.0±
73' AT 1.5%
UTILITIES & STORAGE
IN FULL BASEMENTS
4"SCH40 AT 2% MIN. \
WORKING UO. LEVEL RANGE
9000 GAL.H-20 SEPTIC TANK
ACME PRECAST OR EQUAL
SCHEMATIC SITE&SEPTIC DESIGN
05-077
I SGkttNINU/HLANIJNUb I'tH LANUt;UAYt F'LAIV
6' CHAIN LINK FENCE AROUND
/RETENTION BASIN.
BLACK VINYL COATED LINKS.
LOAM & SEED DISTURBED AREAS (TYP.)
�°°r I >°°°°U0
°o
W
00
O° W /
°o
1 00
°o
o °
00
3 0
REMOVE ANY LOAMY MATERIAL
FROM BENEATH RETENTION BASIN BELOW RIM GRADE
AND REPLACE WITH CLEAN SAND, COVER WITH
4" LOAM AND HYDROSEED BASIN AREA
SEE LANDSCAPE PLANS FOR DETAILED PLANTING SCHEDULE
3" SCH-40
SECTION VIEW
AGE MANHOLE DET
NOT TO SCALE
CONCRETE MINIMUM STRENGTH: 5000 PSI AT 28 DAYS
STEEL REINFORCEMENT: ASTM -AS -615 GRADE 60
DESIGN LOADING: PASHTO HS -20
BIORETENTION BASIN DETAIL TIMBER
GUARD RAIL
- NOT TO SCALE -
PROPOSED GRASS LINED BIORETENTION BASIN
EXCAVATETO LINE & GRADE SHOWN ON PLAN
4" LOAM & SEED LINING
ON BOTTOM
AND SIDE SLOPES.
-H
6" NATURAL STONE TRAPROCK APRONS
`I/
LeBARON OR EQ.
`n
BELOW SWALE ENTRANCE
a
°
PROP.H-20 F&G ,ABOVE BOTT.
23.5" FRAME
6'-8" X 6'0
°O °O0
PARKING
\
2'01.D. PRECAST
°o°°o°o°o°°°h°°o°o
oo°o°o°o°oo°o
BOLT SECURELY IN
PLACE
/CONCRETE RISER.
H-20 MORTAR ALL
°0000°0000 0
� �
�°o°°o°°o°°o oh°°°°°^0
1000 GAL.
INLETS, UNITL GROUND COVER
HAS
PROPOSED
COMPONENTS oa4F
0
HOLE
12" SDR35 DRAIN LINE
0.5% min.
6" LOAM & SEED ALL DISTURBED AREAS NOT PAVED, 12"X3" CAPE COD BERM INTEGRAL WITH TOP COURSE
/WHERE IN
NOTE: CONCRETE CURBING REQ. ENTRANCE AREA
0000°0000ao°0°o°00°o°o°a°
EXTEND GRAVEL 6" MIN.
PEST EDGE PAVE
REMOVE TOP & SUBSOIL
COMPACT SUBGRADE
NOTE: REMOVE FROST SUSCEPTIBLE MATERIAL
TO A DEPTH OF 36" BELOW FINISHED GRADE.
REPLACE WITH NON FROST SUSCEPTIBLE MATERIAL
(LESS THAN 10% PASSING #200 SIEVE)
NOTE: COMPACT ALL FILL IN 6" LIFTS TO 95% MOD.
PROCTOR DENSITY WITH VIBRATORY ROLLER COMPACTER
PAVEMENT CROSS SECTION
NOT TO SCALE
75.5±
75.5± 4"SCH40 PVC VENT LINE PITHES BACK TO
� eIIFAmm
Em
SEEN
LEACHING FIELD
12" PERF. HDPE
c�
UNS JUST [INTO
12"0H-20 HDPE
SIDES WITH GRASS STONE MULCH BETWEEN SHRUBS
NOTE: PLACE FILTER FABRIC BETWEEN
MDC p
EASTONE
-1)
,
'°°°°°"°"°0
i°o 0 0 o U°o°o
6'-8" X 6'0
ALL FRAME AND GRATES UNTIL
PARKING
TRAP
�
n a
°o°°o°o°o°°°h°°o°o
oo°o°o°o°oo°o
H-20
IS PAVED AND FOR RETENTION
BASIN
°0000°0000 0
� �
�°o°°o°°o°°o oh°°°°°^0
1000 GAL.
INLETS, UNITL GROUND COVER
HAS
PROPOSED
•
'o°ooa°o°p" o e
°o °o ° ��o
LEACHPIT
STAB!LIZEO.
3"PVC TO PUMPt-
PIT
1000 GALLON PRECAST
H-20 CATCH BASN
ORIFICE IN LATERAL
60" O.C. WITH SHIELDS
o °oo°0°08 ,
ivovo80000c�°o°o°
SHOREY OR EQUAL
4" MIN. PEASTONE
AND MIRAFI 140NS
'8X6'-8' SHCR_Y SCLI
STONE
°
507.SAND
.R AS REQ.
OVER STONE
BASIN H-20 OR EQUAL
12" COARSE SAND OVER PARENT MATERIAL
�o°Oo888888��Doc oeo--mom
20% COMPOSTED LEAVES
30% TOPSOIL 12" DEEP TOTAL
B (TYP.)
MANHOLE COVER SEE DETAIL
Ll
_
o o8n80088 0 0 0
o°o°o°o °c"j°oeeo
(TYP.)
- NOT TO SCALE -
COMPACT BACKFILL
'
CLEANOUT DETAIL:
jo p0p°�VD°�°o°0°0°0°°°
p0°o 000 oa °000°°°o°i
SE
TIONAL PLATE
H-20 RATED FEMALE ADAPTOR & THREADED PLUt
-
1/4" ORIFICE AT 5' O.C.
VALIE BOX TO SLEEVE TO ALLOW MCVEMEN7
GRADE AT EA. END.
6.00'
4"0SCH40 PERFORATIONS DOWN
VENT AS SHOWN
POURED CCNCREFE DONUT
;r 1.5 CU
1 r I
CAST IRON COVER
3"SCH40 PVC DRAIN BACK
LINE TO
PUMP CHAMBER ,
HOLE
12" SDR35 DRAIN LINE
0.5% min.
6" LOAM & SEED ALL DISTURBED AREAS NOT PAVED, 12"X3" CAPE COD BERM INTEGRAL WITH TOP COURSE
/WHERE IN
NOTE: CONCRETE CURBING REQ. ENTRANCE AREA
0000°0000ao°0°o°00°o°o°a°
EXTEND GRAVEL 6" MIN.
PEST EDGE PAVE
REMOVE TOP & SUBSOIL
COMPACT SUBGRADE
NOTE: REMOVE FROST SUSCEPTIBLE MATERIAL
TO A DEPTH OF 36" BELOW FINISHED GRADE.
REPLACE WITH NON FROST SUSCEPTIBLE MATERIAL
(LESS THAN 10% PASSING #200 SIEVE)
NOTE: COMPACT ALL FILL IN 6" LIFTS TO 95% MOD.
PROCTOR DENSITY WITH VIBRATORY ROLLER COMPACTER
PAVEMENT CROSS SECTION
NOT TO SCALE
75.5±
75.5± 4"SCH40 PVC VENT LINE PITHES BACK TO
� eIIFAmm
Em
SEEN
3" CAST IRON
CHECK VALVES
3"PVC BALL VALVES (2)
4'0 VALVE PIT
67.5
LEACHING FIELD
12" PERF. HDPE
RESERVE000
UNS JUST [INTO
PLANT
SIDES WITH GRASS STONE MULCH BETWEEN SHRUBS
0 0 CAL. AF
PITCH
EASTONE
-1)
a
MIX OR
STONE MULCH PER
PER LANDSCAPE PLAN
�IIl1
LANO SURVEYORS
LANDSCAPE
SPECS.
211111
OF LEACH FIELD
°0000°0000 0
4"SCH40 PVC
MAX. SLOPE 3:1
TRANSITIONAL 4:1 TYP.
HERBACEOUS 4
W
Ili • . • . �1
ELECTICAL CONDUIT SWEEP
\/ �/\
\\j\\j\\>/ ..-
•
��
iilllii�i�IIIIIIIIIIIII��J
3" CAST IRON
CHECK VALVES
3"PVC BALL VALVES (2)
4'0 VALVE PIT
67.5
R ALL JOINTS
JON -SHRINK GROUT
/8 YPWEEPHOLE
LEACHING FIELD
12" PERF. HDPE
18 0
UNS JUST [INTO
PLANT
SIDES WITH GRASS STONE MULCH BETWEEN SHRUBS
I LATERALS
PITCH
EASTONE
-1)
a
MIX OR
STONE MULCH PER
PER LANDSCAPE PLAN
FABRIC OVER VENT
LANO SURVEYORS
LANDSCAPE
SPECS.
TO SAND AT BOTTOM
OF LEACH FIELD
°0000°0000 0
4"SCH40 PVC
MAX. SLOPE 3:1
TRANSITIONAL 4:1 TYP.
HERBACEOUS 4
W
\ e90'
ELECTICAL CONDUIT SWEEP
\/ �/\
\\j\\j\\>/ ..-
VEGETATION \\ \\
o°r\\/�\\/�\\/�\\�
`2"OSCH40 LATERAL o0�
oC�
o a
�EACHING
3"PVC TO PUMPt-
PIT
SEE LANDSCAPE PLAN
ORIFICE IN LATERAL
60" O.C. WITH SHIELDS
CONNECTION
I
4" MIN. PEASTONE
AND MIRAFI 140NS
SOIL FILTER MIX
STONE
/FABRIC
507.SAND
o
�
OVER STONE
l
12" COARSE SAND OVER PARENT MATERIAL
F&C'S TO GRADE
(NOT SHOWN)
20% COMPOSTED LEAVES
30% TOPSOIL 12" DEEP TOTAL
RAIN GARDEN DETAIL
MANHOLE COVER SEE DETAIL
Ll
SIDE
ELEVATION VIEW-
(TYP.)
- NOT TO SCALE -
COMPACT BACKFILL
'
CLEANOUT DETAIL:
4"0SCH40 PEFORATIONS DOWN
VENT AS SHOWN
�,` / 24" LO. PRECAST CONC. RISER AS REQ.
Le BARON CAST IRON LAO -910 SEE PAVEMENT SECTION
H-20 RATED FEMALE ADAPTOR & THREADED PLUt
i/ /4'0 PRECAST DONUT 1" OVER FIELD
1/4" ORIFICE AT 5' O.C.
VALIE BOX TO SLEEVE TO ALLOW MCVEMEN7
GRADE AT EA. END.
°
4"0SCH40 PERFORATIONS DOWN
VENT AS SHOWN
POURED CCNCREFE DONUT
;r 1.5 CU
R ALL JOINTS
JON -SHRINK GROUT
/8 YPWEEPHOLE
PRESSURE FLOW
TO LEACHING
FIELD SAS
PITCH TO DRAIN BACK
LEACHING FIELD
12" PERF. HDPE
18 0
UNS JUST [INTO
I
I
I LATERALS
PITCH
EASTONE
-1)
-
PUMP OUT WELL
TEE
AT 1%
FABRIC OVER VENT
LANO SURVEYORS
I I 5' O.C.
CU. FT. MIN.
TO SAND AT BOTTOM
OF LEACH FIELD
2"05CH40 PVC
4"SCH40 PVC
_
I
\ e90'
ELECTICAL CONDUIT SWEEP
PORT
'RISER
poOo
`2"OSCH40 LATERAL o0�
oC�
o a
�EACHING
3"PVC TO PUMPt-
PIT
T- 4"X2" TEE
ORIFICE IN LATERAL
60" O.C. WITH SHIELDS
CONNECTION
I
I FIELD
(TYP.) BOTTOM
STONE
PLAN VIEW
DRILL ORIFICES IN EACH LATERAL ON TOP
° ° I OF PIPE (12 O'CLOCK POSITION)
o
�
SEE PLAN FOR LOCATIONS
l
4"SCH 40 PVC MANIFOLD
AS REQ.
ELEV. 71.2
MANHOLE COVER SEE DETAIL
Ll
SIDE
ELEVATION VIEW-
(TYP.)
MORTAR ALL COMPONENTS (TYP.)
COMPACT BACKFILL
ROM APPROVED SOURCE.
4"0SCH40 PEFORATIONS DOWN
VENT AS SHOWN
�,` / 24" LO. PRECAST CONC. RISER AS REQ.
LATERALS CENTER CENTER
SEPTIC
i/ /4'0 PRECAST DONUT 1" OVER FIELD
1/4" ORIFICE AT 5' O.C.
°
1__4" THICK 4000 PSI CONC. W/WWF
1 r I
CAST IRON COVER
PRESSURE FLOW
TO LEACHING
FIELD SAS
PITCH TO DRAIN BACK
LEACHING FIELD
12" PERF. HDPE
18 0
OBSERVATION HOLE. IN CTR.
I
I
I LATERALS
PITCH
I =
-
PUMP OUT WELL
I
AT 1%
LANO SURVEYORS
I I 5' O.C.
CU. FT. MIN.
TO SAND AT BOTTOM
OF LEACH FIELD
.005
4"SCH40 PVC
' � 3000 PSI CONC
I
PLAN VIEW
INSPECTION
PORT
DETAIL
MAN QLD
ool
�EACHING
ACCESS COVER
DESCRIPTION
AROUND
CONNECTION
I
I FIELD
SEE DETAIL. EL. 49.5f
12" PERF. HDPE PITCH TO DRAIN BACK AT 0.5%
PLAN VIEW
DRILL ORIFICES IN EACH LATERAL ON TOP
° ° I OF PIPE (12 O'CLOCK POSITION)
o
�
PUMP OUT WELL SEE ORIFICE SHEILD DETAIL
l
ADJUSTING BLOCKS/RISER
AS REQ.
ELEV. 71.2
4"MANIFOLD INVERT EL.
Ll
1
MORTAR ALL COMPONENTS
(TYP.)
(O.5% PITCH DRAINS TO
(
COMPACT BACKFILL
ROM APPROVED SOURCE.
OWNERS ENGINEER 70 INSPECT &CERTIFY
LATERALS CENTER CENTER
SEPTIC
PIPING
1/4" ORIFICE AT 5' O.C.
SEE PAVEMENT SECTION
WITH CRIRCE SHIELD
5 3" CAST IRONp,1ure
CHECK VALVE (t
sssure Tap
tYl1)
C! BALL VALVE
w
H-20 4'0 MANHOLE
0
//C
.5� PITC � -_`
a YE ^� 3" PRESSURE FLOW
TO LEACHING
3/8" WEEPOOLE PITCH TO ORAPN SACK
L58" � �-
3"SCH4C IPVC DRAIN BACK LINE TO PUMP CHAMBER
SECTION VIEW :seas° °
c°
888° 0
12" o°0188°88
VALVE PIT DETAIL y
NOT TO SCALE
CONCRETE MINIMUM STRENGTH: 5000 PSI AT 28 DAYS 2""05CH40
STEEL REINFORCEMENT: ASTM -AS -615 GRADE 60 WITH 1/4" ORIFICES
DESIGN LOADING: AASHTO HS -20 DT 12 O'CLOCK OSITI
LEAC
MIRAFI
2"PEASTONE
z
EL. 75.5 MAX.
I
I
I
INSPECTION PORT
PITCH
EL. 73.8 MIN
I
SEE DETAIL
I
AT 1%
LANO SURVEYORS
POUR 1
CU. FT. MIN.
- YARMOUTHPORT MASS.
20" MIN.
.005
' � 3000 PSI CONC
I
3"PVC TO PUMP
THRUST
BLOCK
ool
MARK
LATE T
(1/4"0
DESCRIPTION
AROUND
CONNECTION
I
P
3"SCH4
1Z
12" PERF. HDPE PITCH TO DRAIN BACK AT 0.5%
PLAN VIEW
DRILL ORIFICES IN EACH LATERAL ON TOP
° ° I OF PIPE (12 O'CLOCK POSITION)
PUMP OUT WELL SEE ORIFICE SHEILD DETAIL
BOTTOM STONE
�t
ELEV. 71.2
4"MANIFOLD INVERT EL.
Ll
1
EXCAVATE TO CLEAN VIRGIN MATERIAL
I
(O.5% PITCH DRAINS TO
(
COMPACT BACKFILL
ROM APPROVED SOURCE.
OWNERS ENGINEER 70 INSPECT &CERTIFY
LATERALS CENTER CENTER
SEPTIC
PIPING
DETAILS
SEE PAVEMENT SECTION
RI
740N FABRIC OVER STONE
O
WITH FABRIC OVER
e°
- Z„
8o°Qeoeo
°o°0
00 00000 ° o0 0 0°0 °o°
80
0°8 °°°0°0
2"
8°0°00 0 8°8°8°8 8 °a o 0 8 8 a
°0°0 0 00 0°° 8 8 0 °°0°°°°°0,°,8°0° °oaa
o o°o°0°°°o°e°a °°°o "Oo°
000 0
oo°°o°°0°8°°0°8°8°°0°°0°°00°°0°8°°0°°°°°o°°a°°o°°o°o°°o°° °O°o
10" TOTAL OF ,75" - 1.5" STONE
ORIFICE SHIELD OS200
DOUBLE WASHED ONLY
ORENCO SYSTEMS INC
ENGINEER TO INSPECT
PH. 1-800-348-9843
ON
OR EQUAL SEE DETAIL
NOT TO SCALE
...:.:1111.......` I -T I SEPTIC PROFILE
s^ 9000 GAL. H-20 TANK CLEARWELL PUMP CHAMBER) NOT TO SCAI F
4'0 AMPHIDROME REACTOR (VERIFY EXACT DIMENSIONS OF ALL STRUCTURES PRIOR TO SETTING- INVERT ELEVATIONS TO BE HELD)
INTERNATIONAL FUND FOR ANIMAL WELFARE YARMOUTH, MASSACHUSETTS designLAB ARCHITECTS
DOWN CAPE ENGINEERING, INC.
NOTE: GROUNDWATER 40'+ BELOW SURFACE 1 BOTT. TH
PER TEST WELL RESULTS
STEPHEN STIMSON ASSOCIATES LANDSCAPE ARCHITECTS
CIVIL SITE PLAN
OF LAND AT
IN
YARMOUTHPORT, MA
PREPARED FOR:
[.F.A.W.
DATE: MARCH 1, 2006
REVISED: APRIL 13, 2006 (CCC, TOWN COMMENTS)
REVISED: MAY 16, 2006, (DD SET)
SCal e: 1 40'
0 20 40 60 80 100 FEET
off 508-362-4541
fax 508 362-9880
down cape engineering, inc.
Cl VIL ENGINEERS
LAND SURVEYORS
939 Main Street - YARMOUTHPORT, MASS.
05-077 SITEPLAN.DWG
IFAW Headquarters
Yarmouthport, MA
designLAB architects
374 Congress St, Suite 507
Boston, MA 02216
t 617 350 3005, f 617 350 6006
EL. 75.5 MAX.
VENT W/ STAINLESS BUGSCREEN
Inc.
INSPECTION PORT
cape
EL. 73.8 MIN
SEE DETAIL
CII4L ENGINEERS
AT 1%
LANO SURVEYORS
TOP STONE
Street
- YARMOUTHPORT MASS.
20" MIN.
72.5
72.0 TOP STONE
0.57
INV. 72.0
MARK
LATE T
(1/4"0
DESCRIPTION
NE
INV. 71.5
OR RC AT N CENTER
P
3"SCH4
12" PERF. HDPE PITCH TO DRAIN BACK AT 0.5%
PUMP OUT WELL SEE ORIFICE SHEILD DETAIL
BOTTOM STONE
�t
ELEV. 71.2
4"MANIFOLD INVERT EL.
i ST
IN CENTER,
L. I •� NOTE: DISTURBED SOILS IN LEACHING AREA
EXCAVATE TO CLEAN VIRGIN MATERIAL
68.0 RAISE TO AT ENDS
(O.5% PITCH DRAINS TO
(
PUMP CHAMBER) AND REPLACE WITH CLEAN MEDIUM SAND
ROM APPROVED SOURCE.
OWNERS ENGINEER 70 INSPECT &CERTIFY
ALL SYSEM COMPONENTS.
...:.:1111.......` I -T I SEPTIC PROFILE
s^ 9000 GAL. H-20 TANK CLEARWELL PUMP CHAMBER) NOT TO SCAI F
4'0 AMPHIDROME REACTOR (VERIFY EXACT DIMENSIONS OF ALL STRUCTURES PRIOR TO SETTING- INVERT ELEVATIONS TO BE HELD)
INTERNATIONAL FUND FOR ANIMAL WELFARE YARMOUTH, MASSACHUSETTS designLAB ARCHITECTS
DOWN CAPE ENGINEERING, INC.
NOTE: GROUNDWATER 40'+ BELOW SURFACE 1 BOTT. TH
PER TEST WELL RESULTS
STEPHEN STIMSON ASSOCIATES LANDSCAPE ARCHITECTS
CIVIL SITE PLAN
OF LAND AT
IN
YARMOUTHPORT, MA
PREPARED FOR:
[.F.A.W.
DATE: MARCH 1, 2006
REVISED: APRIL 13, 2006 (CCC, TOWN COMMENTS)
REVISED: MAY 16, 2006, (DD SET)
SCal e: 1 40'
0 20 40 60 80 100 FEET
off 508-362-4541
fax 508 362-9880
down cape engineering, inc.
Cl VIL ENGINEERS
LAND SURVEYORS
939 Main Street - YARMOUTHPORT, MASS.
05-077 SITEPLAN.DWG
IFAW Headquarters
Yarmouthport, MA
designLAB architects
374 Congress St, Suite 507
Boston, MA 02216
t 617 350 3005, f 617 350 6006
Key Plan
Legend
�V.iA�=I, 4-} �-�zaoFrMss
� c
OJALA
CIVIL
N' 30792
DESIGN D }Y IN NOT ISSUED�b CONSTRUCTION
orf 508-562-9880
to. SOB 362-9890
1/0
Inc.
wn
cape
engineering,
CII4L ENGINEERS
LANO SURVEYORS
839 Main
Street
- YARMOUTHPORT MASS.
Key Plan
Legend
�V.iA�=I, 4-} �-�zaoFrMss
� c
OJALA
CIVIL
N' 30792
DESIGN D }Y IN NOT ISSUED�b CONSTRUCTION
MARK
DATE
DESCRIPTION
PROJECT NO: 05.002
DRAWN BY: DAO
CHECKED BY: AHO
DATE: MAY 49, 2006
SCALE: AS NOTED
Drawing Title:
CIVIL DETAIL SHEET
100% Design Development Set