HomeMy WebLinkAboutDecisions 3385 and 3386 Restroom Concession Building Elevationslx WD TRIM
CEDAR BEVEL
SIDING - 3 1/2" EXP
SPLIT FACE CMU
A
A
A
A
,A
A
12
8
12
12 --
__ _ 8
8
CEDAR egg
BEVEL SIDING -
ROLL DN
SERVICE DR
I� 8" SCORED CMU
STAINLESS STEEL
CLAD COUNTER
FRONT (EAST) ELEVATION
SCALE: 1/4" = 1'-0"
ASPHALT SHINGLES
Ix R.S. CEDAR
WOOD LOUVER VENT
(REDWOOD)
METAL FLASHING ® ALL
VALLEYS - STOP COMP.
SHINGLES FOR OPEN VAL
THIS SLOPE DETERMINES
ROOF PEAK
NORTH ELEVATION
SCALE: 1/4" = 1'-0"
i
REAR (WEST) ELEVATION
SCALE: 1/4" = 1'-0"
12
6.5 •i- � t 2 s
METAL FLASHING ® ALL
8�
VALLEYS - STOP COMP
SHINGLES FOR OPEN VALLEY - -
ASPHALT SHINGLES —
1x R.S. CEDAR
i
CEDAR BEVEL SIDING
3 1/2" EXP
1x4 FIR TRIM
GALV. FLASHING
SPLIT FACE CMU
GRADE
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
L SIDING
2' x 4' PUBLIC ACCESS DATE 1113/97
TACK BOARD - BOTH SIDES
4' x 8' HOLLOW ALUM TUBE FRAMED
LOCKABLE BULLETIN BD CABINETS w/
LEXAN VIEWING PANELS AT DOORS
REVISIONS
DRAWING No III
A2
A
A
,A
A
i
REAR (WEST) ELEVATION
SCALE: 1/4" = 1'-0"
12
6.5 •i- � t 2 s
METAL FLASHING ® ALL
8�
VALLEYS - STOP COMP
SHINGLES FOR OPEN VALLEY - -
ASPHALT SHINGLES —
1x R.S. CEDAR
i
CEDAR BEVEL SIDING
3 1/2" EXP
1x4 FIR TRIM
GALV. FLASHING
SPLIT FACE CMU
GRADE
SOUTH ELEVATION
SCALE: 1/4" = 1'-0"
L SIDING
2' x 4' PUBLIC ACCESS DATE 1113/97
TACK BOARD - BOTH SIDES
4' x 8' HOLLOW ALUM TUBE FRAMED
LOCKABLE BULLETIN BD CABINETS w/
LEXAN VIEWING PANELS AT DOORS
REVISIONS
DRAWING No III
A2