Loading...
HomeMy WebLinkAboutDecisions 3385 and 3386 Restroom Concession Building Elevationslx WD TRIM CEDAR BEVEL SIDING - 3 1/2" EXP SPLIT FACE CMU A A A A ,A A 12 8 12 12 -- __ _ 8 8 CEDAR egg BEVEL SIDING - ROLL DN SERVICE DR I� 8" SCORED CMU STAINLESS STEEL CLAD COUNTER FRONT (EAST) ELEVATION SCALE: 1/4" = 1'-0" ASPHALT SHINGLES Ix R.S. CEDAR WOOD LOUVER VENT (REDWOOD) METAL FLASHING ® ALL VALLEYS - STOP COMP. SHINGLES FOR OPEN VAL THIS SLOPE DETERMINES ROOF PEAK NORTH ELEVATION SCALE: 1/4" = 1'-0" i REAR (WEST) ELEVATION SCALE: 1/4" = 1'-0" 12 6.5 •i- � t 2 s METAL FLASHING ® ALL 8� VALLEYS - STOP COMP SHINGLES FOR OPEN VALLEY - - ASPHALT SHINGLES — 1x R.S. CEDAR i CEDAR BEVEL SIDING 3 1/2" EXP 1x4 FIR TRIM GALV. FLASHING SPLIT FACE CMU GRADE SOUTH ELEVATION SCALE: 1/4" = 1'-0" L SIDING 2' x 4' PUBLIC ACCESS DATE 1113/97 TACK BOARD - BOTH SIDES 4' x 8' HOLLOW ALUM TUBE FRAMED LOCKABLE BULLETIN BD CABINETS w/ LEXAN VIEWING PANELS AT DOORS REVISIONS DRAWING No III A2 A A ,A A i REAR (WEST) ELEVATION SCALE: 1/4" = 1'-0" 12 6.5 •i- � t 2 s METAL FLASHING ® ALL 8� VALLEYS - STOP COMP SHINGLES FOR OPEN VALLEY - - ASPHALT SHINGLES — 1x R.S. CEDAR i CEDAR BEVEL SIDING 3 1/2" EXP 1x4 FIR TRIM GALV. FLASHING SPLIT FACE CMU GRADE SOUTH ELEVATION SCALE: 1/4" = 1'-0" L SIDING 2' x 4' PUBLIC ACCESS DATE 1113/97 TACK BOARD - BOTH SIDES 4' x 8' HOLLOW ALUM TUBE FRAMED LOCKABLE BULLETIN BD CABINETS w/ LEXAN VIEWING PANELS AT DOORS REVISIONS DRAWING No III A2