Loading...
HomeMy WebLinkAbout7-A170LFL - FF 9,1LFL.. — (� F✓ T L 1L4 n o r I R�E-A (Z E L u v A -r L 1 --- L�7-(.svX-no,J I – I — I I N J a C j NOV 29 2007 .o YARMOUTH OLD KING'S HIGHWAY RECEIVED 6 J007 YARMOUTH OLD KING'S HIGHWAY yi I_�uu' _I lui�l -7o/J I=_ / APPROVED BY: DRAWN BY 71 REVISED o -aa -o7 B 4T RonJ--lvi�L.n1J� — `t7>�*`�J�y�n.1 778-�67t DRAWING NUMBER /a�� SOIL TEST PIT DATA: JULY 12, 2006 SEPTIC TANK DETAIL: 1,500 GALLON ADD 1500 SEP.T. DISTRIBUTION BOX DETAIL: NOT TO SCALE LEACHING DETAIL: NOT TO SCALE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND NOT TO SCALE D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. NO. OF OUTLETS: cJ 130.0' 40 OR EQUAL. TEST PIT #1 34.7 NO OBSERVED GROUNDWATER NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, 150' OF ANY KNOWN LEACHING FACILITY. FINISHED GRADE ALL TOPSOIL, SUBSOIL AND OTHER 00 0 0 00 0 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o T 0 GRD. EL MATERIAL AND DELETERIOUS SUBSTANCES. REINFORCED CONCRETE. SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 ° NO. GW. 17.7 RETAINED ON THE #4 SIEVE. SIEVE ANALYSES 2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. ANALYSES MUST DEMONSTRATE THAT THE REMOVABLE -- 2" WALLS NOTES: o ° T "--------------"-" 107-100% MUST PASS IC50 SIEVE UNLESS UNDER PAVEMENT, DRIVES OR 6. RECOMMENDED MANUFACTURER-SHOREY OR CTIVE PARTICLE SIZE) mm ASS COVER ° 4 UNITS OBS 00 A THE CONTRACTOR SHALL BE RESPON- TRAVELED WAYS, WHEREIN H-20 LOADING APPROVED EQUAL. STRUCTION ACTIVITY WITH DIG -SAFE a::a..tv:•a..+,a A•••• : v.:•" 2" 1. DIST. BOX TO WITHSTAND H-10 LOADING COMPANY AND MAINTAINING THE HIGH DENSITY O o0 50" 12' LOAMY SAND l OYR 3/3 : 12" DATE: THE STATE OF MASSACHUSETTS SHALL APPLY. 3. ALL PIPE CONNECTIONS AND CONCRETE AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE T PVC auaam UNLESS UNDER PAVEMENT, DRIVES OR f I TRAVELED WAYS WHEREIN H-20 LOADING " o 4 PVC o PIPE o° POLYETHYLENE INFILTRATOR 3050 0 1 o t B 7/12/06 TAKEN FROM RECORD PLANS. THE CONSTRUCTION SHALL BE WATERTIGHT. LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR _ SHALL APPLY. 0°00 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0° 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LOAMY SAND TEST BY: 4. FILL ALL UNUSED KNOCKOUTS WITH 2-24" DIA C.I. (60 MIN.) MANHOLE COVERS T 15 10YR 6/6 INDICATES ' THE BSC GROUP, INC. MORTAR. BROUGHT TO Fl ISH GRADE 6. g. 8" 2. PROVIDE INLET TEE OR BAFFLE WERE 5,5" OUTLETS F 35.0' - - ----- 40" EL = 31.0 � ESTIMATED - TEE TO BE UNDER 12" MIN. 349 Main Street, (RT. 28) Unit D SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR ' 02673 PLAN VIEW - LEACHING CHAMBERS WITNESSED BY: SEASONAL HIGH GROUND WATER M.H. OPENING -3" #51 BRAY a d "a " "e . "ea cea T IN PUMPED SYSTEM. pp ��4bVOc R°� °ae YARMOUTH PORT MASSACHUSETTS AMY VON HONE y� �- A b 17D OCT 2 6 2007 `!ARMOUTH /� .R y I 4°°�R,° L-2 3. FIRST TWO FEED OF PIPE OUT OF DIST. m DIANE BAYLIS PERC. RATE: INDICATES OBSERVED 10 -6" RAISE BR W/_ SEWER BRICK c-•;- ° ==� ` ' 4" r BOTTOM ON LEVEL STABLE BASE 6" MIN. 3/4" TO BOX TO BE LAID LEVEL. 1 1/2" CRUSHED CHECK: M. DIBB LOAM &SEED DISTURBED AREAS FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 8991SEP4.DWG 2 MIN./INCH =_ GROUND WATER 10'-0" do MORTAR 12" CROSS-SECTION STONE BASE 4• ALL PIPE CONNECTIONS AND CONCRETE 3 MAX. „111111117777777777 COMPACTED FILL 36 MAXIMUM 12"MINIMUM „ 68 SOIL EVALUATOR NORMAL WATER LEVEL a: CONSTRUCTION SHALL BE WATERTIGHT. 0 0 0 0 0 0 00 0 0 0 o C M. DIBB FINE SAND INDICATES PERC. PRECAST SEPTIC TANKp 3" =: } 10" 20" �S: TEE 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. " o 0 0 0000 0 0 000 0° 3" LAYER o PEASTONE O DENSITY O 00 00 O 10YR 7/4 SOIL CLASS: TEST _ c 2" e INLET 4-9"T 4 _6" a : 4'-0" MIN. ao eew oN 5'-4" 30 1/2" 15 1 30 24 EFFEC. DEPTH O 0 00 O OO POLYETHYLENE O �0 0 INFILTRATOR 3050 O O 0_ 0 O ? =` UWIDDEPTH Wn.ET1� 2 /" �00 LEACHING 0 L.T.A. R. 0.74 G.P.D./SQ.FT. INDICATES UNSUITABLE MATERIAL 5'-8" -: (GAS caNIRM) e' _ a :' 1 PRECAST DIST. Bax 1 CHAMBER 0 \ 3/4" - 1 1/2" NO G= - 'a=0:-. „ 47 50 47 WASHED STONE EL = 23.7 132" 23.7 a�?::--e F: :�<.: ::eer•:': .: ei:=f::e - - 12 Z a BOTTOM ON LEVEL STABLE BASE 3" I` 4 PLAN VIEW 6" MIN. 3/4" TO�W 6�Uy/ 1 1/2" STONE CROSS-SECTION VIEW 7 1/2 PLAN VIEW CROSS-SECTION OF CHAMBER DATUM: DESIGN CRITERIA: VERTICAL DATUM: N. G.V. D. DESIGN FLOW: BENCH MARK SET: TOP OF FOUNDATION = 33.83 4 BEDROOMS AT110G.P.B./D 440 G.P.D. r10f WNL D. ma CWL REQUIRED SEPTIC TANK: PROFILE: NOT TO SCALE EL. -A No.a6041 440 X 200% = 880 GAL. EXISTING SEPTIC TANK: = 1500 GAL. TOP FOUNDATIONCB/DH FIRST PIPE LENGTH E CONCRETE COVERS TO WITHIN EL -35.7 6" OF FINISHED GRADE. TO BE SET LEVEL FOR MIN. 2' FINISH GRADE EL=34.5-34.0 FNO SIZE OF LEACHING FACILITY REQUIRED: \ 4" PVC SCH 40 � DESIGN PERC. RATE: <2 �- 4" PVC/ SCH 40 LEACHING CHAMBER _ _ _ uPL \ OHw � f 20�i �a% �' MIN./ INCH 4" PVC SCH 4 `w LONG TERM APPL. RATE 0.74 G.P.D S.F. / �!I=jC I=D 'r ` \ 1=EH I=c 1_ oHw `OHW 440 GPD + 0.74 GPD/SF = 595 S.F 5 OUTLET DIST. I=F BOX 5.3' SEPARATION - - /-\� SEPTIC TANK ! - CV� e^ \ OHW SIZE OF LEACHING FACILITY PROVIDED: EST. HIGH GROUNDWATER S 86'44'fla= W / ` \ 43.00 _ \ OHw % /� / \ -33_--y -- _\ �O /` \ UP h 'SRM \ -moo- -- l j h 6j7 +` �/\DRIVEWAY / 6�%' T USE HIGH DENSITY POLYETHYLENE LEACHING CHAMBERS(4 UNITS) 12'X2'X35' SIDEWALL = 2(12'+35') X 2' = 188 INVERT ELEVATIONS: OBSERVATION POR \ ° , \ �- "-'\ BOTTOM = 12' X 35' = 420 608S.F, TOP OF FOUNDATION 37,28 q PROPOSED 12'x35 TP 1 -_3 / \ ,/-- I \ 3 \ 4" INVERT AT BUILDING 34.00 4" INVERT AT SEPTIC TANK (IN) 33.50 B EXISTING C EXISTING LEACHING S.A.S. 22" OAK W \ dry p ` "� \ �� 8 A'qN \ / / 608 S.F x 0.74 GPD/SF = 450GPI_ a -� x 4" INVERT AT SEPTIC TANK (OUT) 33.25 31.40 D EXISTING E � �; --- �\ "`' i TWIN 18" OAK / 20.5• \ BENCH MARK: �a _ HYDRANT TAG BOLT H DCRA37.01 , 4" INVERT AT DIST. BOX (IN) m /, \, o / \, �. NSVD VARIANCES REQUESTED: 3 4" INVERT AT DIST. BOX (OUT) 31.23 F / 1 ! i INVERTS AT LEACHING FACILITY: PROBOXED / PROP. , o srooP / dr o 0 �O \� NONE GARAGE --32- 4" INVERT AT _ - - I HYD \\ STORY \ OF LEACHING CHAMBER 31.0 G BREAKOUT 31.5 PUMP, CRUSH AND REMOVE ALL EXISTING SEPTIC COMPONENTS ` WOOD FRAME I ts, 10 HOUSE #51 1 I 1 TGF=37,26 / ELEVATION AT BOTTOM 29.0 H FROM THE SITE IN ACCORDANCE WITH TITLE o' INV=34.00 I ' x 35*D S\ FF=38.17 WALK OUT ! LOCUS INFORMATION OF LEACHING CHAMBER 5. \ RESERVE AREA ; BSMNT SLAB=29.91 BASEMENT ) / / S CURRENT OWNER: DALE MORRISON BOTTOM OF HOLE 23.7 J 32' 39 J - - - _ - / oo! PROPOSED 1,500 a �-_40 ArN�NG TITLE REFERENCE: BOOK 19467, PAGE 170 FLOOR PLAN GAL. SEPTIC TANK y - - - _ kq _ - - PLAN REFERENCE: BOOK 203, PAGE 11 -a2- - - - - _ ASSESSORS -43-- \ `�, \ \ 35- LPARCE• 551 LOT 17 � ^¢4 \\ \� �; --- ZONING DISTRICT- R-40 N/F JOHN J. DUGGAN ` - - -- - - - �A\\ \ SETBACKS: FRONT 30' ASSESSORS MAP 151 1 -�\`� S ~"�-� SIDE 20' PARCEL 56 LOT 19 REAR 20' LOT 18 BATH NTHOMAS JF SPIROS MINIMUM LOT SIZE: 40,000 S.F BED O •4' ASSESSORS MAP 151 DALE ON KITCHEN �3 p� PARCEL 54 ASSESSORSRS MAP 151 MA;y EXISTING LOT AREA: 18,763± S.F FAMILY OPEN TO \ PARCEL 55 ry 16,763± S.F OVERLAY DISTRICT: OLD KINGS HIGHWAY BATH ROOM BELOW _ _ =` NITROGEN SENSITIVE 10.72' ZONE: NOT A ZONE If N8655'29'E oF+us ss�ys FEMA FLOOD "C" ZONE DISTRICT: , DATED 7/2/1992 BED BED ?No. #250015 0002 D B2PANEL FL 300Pa g' 39`N2 ,tir'>R"�,. ,� LOCUS PLAN: NO SCALE FIRST FLOOR SECOND FLOOR MARGARET M. QUIRK i ASSESSORS MAP 151 _. PARCEL 60 Ct' CHASE GARDEN CREEK N BRAY FARM LOCUS BATH UNFINISHED AREA ROAD NORTH �P LOT 31 "/F NOTTINGHAM ROAD WILLIAM L. ARSENEAUX OJ�� FINISHED ROOM ASSESSORS MAP 151 PARCEL 61 SEE FURURE ARCHITECTURAL PLANS FOR AREAS OF NEW CONSTRUCTION. � 3 i8H pI }1 0 ,,, � 2 s >" u� 07 PLAN VIEW SEr..� �°�• SCALE: 1' = 20 FEET R(7�D "'GHWAY BASEMENT 0 10 20 40 FT. REVISIONS NO. DATE DESCRIPTION 1. 9/5/06 1000 GAL. TANK 2. 8/20/07 ADDITION ADD 1500 SEP.T. GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE ALL EXCAVATED MATERIAL WITH CLEAN GRANULAR SAND, FREE FROM ORGANIC MATERIAL AND DELETERIOUS SUBSTANCES. MIXTURES AND LAYERS OF DIFFERENT CLASSES OF SOIL SHALL NOT BE USED. THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN TWO INCHES. A SIEVE ANALYSIS, USING A #4 SIEVE, SHALL BE PERFORMED ON A REPRESENTATIVE SAMPLE OF FILL. UP TO 457 BY WEIGHT OF THE FILL SAMPLE MAY BE RETAINED ON THE #4 SIEVE. SIEVE ANALYSES ALSO SHALL BE PERFORMED ON THE FRACTION OF FILL SAMPLE PASSING THE /4 SIEVE. SUCH ANALYSES MUST DEMONSTRATE THAT THE MATERIAL MEETS EACH OF THE FOLLOWING SPECIFICATIONS: 1007 MUST PASS #4 SIEVE (4.75 mm EFFECTIVE PARTICLE SIZE) 107-100% MUST PASS IC50 SIEVE (0.30 mm EFFECTIVE PARTICLE SIZE) 0%-207. MUST PASS #100 SIEVE CTIVE PARTICLE SIZE) mm ASS 0� 5% MUST P0.15 0#200 SIEVE (0.075 mm EFFECTIVE PARTICLE SIZE) 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. 9. ALL EXISTING INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 0. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. li 349 Main Street, (RT. 28) Unit D W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: DESIGN FOR SEWAGE DISPOSAL SYSTEM UPGRADE #51 BRAY FARM ROAD NORTH YARMOUTH PORT MASSACHUSETTS RECEIVE y� �- A b 17D OCT 2 6 2007 `!ARMOUTH 0Lc ••.Macs,, PREPARED FOR: - m DIANE BAYLIS 2 BRAY FARM ROAD NO, YARMOUTH PORT, MA 0265 DATE: JULY 7, 2006 COMP. DESIGN: K. HEALY CHECK: M. DIBB DRAWN: P. HAGIST FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 8991SEP4.DWG DWG NO. 5743-01 SHEET 1 OF 1 JOB NO. 4-8991.00 D %Y