Loading...
HomeMy WebLinkAbout2-A112®I® P.T. POST x R.C. TRIM AP RAILING 4 R.C. TOP C BOT. (LING w/2x2 ,BALUSTERS i" D.G. GHT SIDE ELEVATION SCALE: 1/4"-1'-0" W? JUN 27 PPS 10: 08 j __ -- _ - — - -- --- - RECEIVE) _ ----- ---------- - - _ _Y I cq to 00 O LT. JA 1-11-1 n IA 45c4 P.T. POST J w _ _------- - w/1x R.G. TRIM -- j•� � I I i -- 4x w 4 P.T. POST d CAP -- -- /1x R.G. TRIM r -- --- t CAP 36" RAILING — 36" RAILING 2x4 R.C. TOP b BOT. 06 RAILING w/24 W 00 +7 -_ — +_ tff,+; " 2x4 R.G. TOP G BOT.R.C.US 0 W —t} -- - it_ - RAILING w/2x2 5 ®5+� OAC ►+ BALUSTERS y -- T R.G. BALUSTER j j C,) I - -- - j 0 5" O.C. j -- 4 4 P.T. POSTS q0- VINYL j 00 M -LATTICE LI z o T��. 1 I PANEL �--� Z. � � { 11 U U -TYP. W a { tmV i U LEFT SIDE ELEVATION SCALE: 1/4"w1'-0" REAR ELEVATION SCALE: 114".r -o" j j t 20'-6" I G 11 V 5" 6'-7" L. 6'-6" 6'-7" — ----= -- --- ----- 44 P.T. POST ON 10" DIA 1 CONC. SONOTUBE TYP. i i I 2x10 P.T. JOISTS i a 16" D.G. 2xI0 P.T. LEDGER BD. BOLT TD BOX w r5/8"- LAG BOLTS I I I I 9 32" O.G.-STAGGERED PIER PLAN/FRAM I N SCALE: 1/4"•1'-0" N SCALE: 1/4"-1'-0" 1x4 OVER 1 CEDAR TR 2-5/8"- GALV. THRU-BOLTS w/ WASHERS 4 NUT: COUNTERSINK, T PVC LATTICE PA TYPICAL P057/1 1 E DECK" JOISTS POST 17CH AT BEAM 2" BRG. CONC. tE L DETAIL SCALE: 1"■1'-0" 0 *—.4 xv z zZ A W Li, 0 QQ O" F Q�d is � �Q Ur a0, 4 C cn 0 Q TOP OF FOUNDATION ELEV. I0• I --� 4' CAST IRON PIPE EO PIITCH 1/4 PER MINIMUM PERFT -ELEV. (01, ELEV. 99 O 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM FROM SLAB OR CRAWL CONCRETE CLEAN SAND COVERS 4' SCHEDULE 40 PVC PIPE LOAM AND SEED MIN. PITCH 1/8' PER FT. 2' LAYER OF 1/8' TO 1/2' WASHED STONE / NOTREQUIRED z 1 CU. FT. OF CONCRETE FLOW LINE a, ANCHOR LJ 10' -TMIN. pp pp (/ 1 V. v /G. 7/ 2,0. s e GAS ELEV. _ �&.s 6' Su LEVEL 17 � cJ _ w ,10'' ELEV. _ X5 BAFFLE DISTRIBUTION L��� p 7 HIGH CAPACITY INFILTRATORS WITH BOX STONE IN AN �' (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED r to 1500 GALLON IF MORE THAN ONE OUTLET (r X36X TRENCH FORMATION SEPTIC TANK ('TO BE PLACED ON FIRM BASE) SOIL ABSORPTION a z ONE WASHED WELL2P- 3/4" D 1 1/ SYSTEM (SAS) INDEX STOW ADJUST SEWAGE DISPOSAL SYSTEM PROFILE Lor 33 GBSER,EoUSGS PRTABLE OBABLE WATER TABLE � . = WATNOT TO SCALE / c) ?O / BOTTOM OF TEST HOLE ELEV. = Q7 LIG Z,7-3 o-� LLti � �v SOIL TEST 1 DATE OF SOIL TEST • I-' 't-0 1-,7 9 SOIL TEST DONE BY SWEETSER ENGINEERING WITNESSED BY K. w (5H OBSERVATION HOLE 1 ELEV.- gLqy` OBSERVATION HOL 2 ELEv.- 972� PERCOLATION RATE --- I_ MIN./INCH AT 7e INCHES PERCOLATION RATE '�-MIN.ANCH DEPTH HORIZ TEXTURE COLOR MOTT. OTHER i;10 ti � oo IIo— C� 2-9 14 L��/ rDr2c SWEETSER ENGINEERING 235 GREAT YVESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS. MASS. 02660 y -i0 X71 JOB NO. K� SsjNO l027 rcorj y✓iZ° REVISED SHEET ( OF r• 5-11 r) /vv WATER ENCOUNTERED AT rZD' ELEV. = 8S i LEGEND: EXISTING SPOT ELEVATION 00„0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR SOIL TEST LOCA11ON UTILITY POLE -O- TOWN WATER —w�W CATCH BASIN /@f GAS LINE CLEAN OUT C - CESSPOOL C.P.0 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). - I� 1 11. A VARIANCE OF 2.0' IS REQUIRED FOR THE TOP OF FOUNDATION TO BE EVEN WITH THE HIGH POINT IN THE ROAD. A NEGATIVE GRADE 1 N \ \ OF 3/4' PER FOOT SHALL BE MAINTAINED FOR A MINIMUM OF 15' AROUND THE FOUNDATION. n I 17 4, 3�\ A- r V) VII / rs 0 ;0 o 1 B FCN=/00 0(11 llL �N11N T. A. DUMAS No. ¢i9 T i DEPTH HORIZ TEXTURE COLOR T N'tr - i;10 ti � oo IIo— 1 B FCN=/00 0(11 llL �N11N T. A. DUMAS No. ¢i9 T i DEPTH HORIZ TEXTURE COLOR MOTT. — OTHER o D Grury arc SWEETSER ENGINEERING 235 GREAT YVESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS. MASS. 02660 oaTEA� 4�5T JOB NO. K� y l027 LOCATION MAP REVISED SHEET ( OF r• y. J 9 ? CJ J1r- lS /✓P WATER ENCOUNTERED AT /20ELEV a 27e NUMBER OFBEEDIROOOMsCALCULATIONS 3 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW j ( 110 GAL/BR./DAY X BR.) 7361 GAL/DAY REQUIRED SEPTIC TANK CAPACITY -770 CAL ACTUAL SIZE OF SEPTIC TANK900 GAL SOIL CLASSIFICATION DESIGN PERCOLATION RATE < MIN./IN. EFF4EALUENT LOADING RATE 11 0.74 GAL/DAY/S.F. II)"MAREAY71ZX`07/z/ Y K S SQ. ET. LEACHf1 G CAPACITY (AREA X RATE) 3S�'0 GAL/DAY }7N.3x o•7V RESERVE LEACHING CAPACITY 3S/ b GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF A2 wl a iT RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6' OF FINISHED GRADE 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL 13E USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATIC IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. G A PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP DL• AS PARCEL X ? Z APPROVED: BOARD OF HEALTH DATE AGENT 4 M12 ■! 0i r S J ii ff LG��S PROPOSED SEPTIC DESIGN FOR cT7C) PROJECT LOCATION Z_ � �NT:ejC9zP L�3 ✓�, //J2v.�a rG/ SWEETSER ENGINEERING 235 GREAT YVESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS. MASS. 02660 oaTEA� 4�5T JOB NO. REVISED c�lufhr No , LOCATION MAP REVISED SHEET ( OF r• 4 M12 ■! 0i m / b I? STR1BUION BOX . �s � Hltii 'r.APA� nn �11L AT�s +gym+ (TO BE PL.AM ON FIRM BASE} TC# MWSASO 10 r 1500 GALLON IF ET F AT�c�, -�SEPTIC 'TANK Com: SOIL ABSORPTION ZONE J14 11 SYSTEM (SAS) INDEX T I G oT 33 USG§ PRAM WATER TABIr ELEV.- SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE � / / ) ELEV, NOT TO ScAu c� 1 '70 � BO'ETCbi OP TEST NDLE a". 1 _ OBSERVATION HOLE T EI.BV:.. PERCOLA11 RATE 42 MKANW AT '71�, JNCM DEP mm. RE Com MOTT. QTHER ��J ,ry V (110 CAL/ITR./L1AY. X 8R) REQU#RED SEPYIC'TANK CAPACITY ° GAL UTILITY POLE -o- 5- GAL. Ira; r /z . GAS G am--- EFFLUENT LOADING RATE GAL./DAY/S.F. V777 S4 FT ".4p 11Y54) 17X ZX .10 -/?) � 3u GAL../DAY G, o Fjj✓j i ��� 7l� b GAL/DAY NOTES. �,I.+fl7 I. ALL WORKMANSHIP AND MA;ERjt�1S SMALL �COIfftRtM TO D.E.P. 31 mon t1A C a•1r v 'Y y,,�,wr� Cafjrjcr'j AWASAW m / b I? STR1BUION BOX . �s � Hltii 'r.APA� nn �11L AT�s +gym+ (TO BE PL.AM ON FIRM BASE} TC# MWSASO 10 r 1500 GALLON IF ET F AT�c�, -�SEPTIC 'TANK Com: SOIL ABSORPTION ZONE J14 11 SYSTEM (SAS) INDEX T I G oT 33 USG§ PRAM WATER TABIr ELEV.- SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE � / / ) ELEV, NOT TO ScAu c� 1 '70 � BO'ETCbi OP TEST NDLE a". 1 _ OBSERVATION HOLE T EI.BV:.. PERCOLA11 RATE 42 MKANW AT '71�, JNCM DEP mm. RE Com MOTT. QTHER ��J ,ry V (110 CAL/ITR./L1AY. X 8R) REQU#RED SEPYIC'TANK CAPACITY ° GAL UTILITY POLE -o- 5- GAL. Ira; r /z . GAS G am--- EFFLUENT LOADING RATE GAL./DAY/S.F. V777 S4 FT ".4p 11Y54) 17X ZX .10 -/?) � 3u GAL../DAY G, o Fjj✓j i ��� 7l� b GAL/DAY NOTES. �,I.+fl7 I. ALL WORKMANSHIP AND MA;ERjt�1S SMALL �COIfftRtM TO D.E.P. mon t1A C a•1r v 'Y y,,�,wr� Cafjrjcr'j DEPC Z TEXTURE MOTT. QTHER ��J ,ry V 1�iLG7i✓.tlG. (110 CAL/ITR./L1AY. X 8R) REQU#RED SEPYIC'TANK CAPACITY ° GAL UTILITY POLE -o- 5- GAL. Ira; r 10*41 . GAS G am--- EFFLUENT LOADING RATE GAL./DAY/S.F. V777 S4 FT CLEANLEACHNG 11Y54) 17X ZX .10 -/?) CESSPOOL GP 3u GAL../DAY -� / b GAL/DAY NOTES. �,I.+fl7 I. ALL WORKMANSHIP AND MA;ERjt�1S SMALL �COIfftRtM TO D.E.P. TITLE 5 AND' M TOWN OF 2 LJ4 tZO l2 y,,�,wr� Cafjrjcr'j /40 WATER ENC01 WWW AT "'0" f ELEV. m gS• i iv 0 WATER Ot0OUISITERED AT 42 .' ELEV. LEGEND: DESIGN CALCULATIONS 3 DUST1NC SPOT ELEVATION 00*0 NUMBER OF 6EIYROGl15 GARB o E)Q m o CONTOUR ---0q - - -_ FINAL SPOT ELEVATION TOTAL ESiLMATEl?.fLOW 730CAL/0AY FINAL ODUTOUR SOIL Im LOCATION 19 (110 CAL/ITR./L1AY. X 8R) REQU#RED SEPYIC'TANK CAPACITY ° GAL UTILITY POLE -o- ACTUAL STS Cf 5EP710 TANK GAL. TOWN CATCH BASIN iW � SOIL WMCAIM DESIGN PERCOtA7M KATIE Y 5�`�'_ MIN./1M. GAS G am--- EFFLUENT LOADING RATE GAL./DAY/S.F. V777 S4 FT CLEANLEACHNG 11Y54) 17X ZX .10 -/?) CESSPOOL GP LEAC?i fl CAPACITY (AREA X RATES/ �7Fa GAL../DAY -� RESERVE LEACHING CAPACt Y�� b GAL/DAY NOTES. I. ALL WORKMANSHIP AND MA;ERjt�1S SMALL �COIfftRtM TO D.E.P. TITLE 5 AND' M TOWN OF 2 LJ4 RULES AND kt t 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND REfdtIJT#ONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE FOR A MINIMUM OF 5' AROUND SOIL ABSW71ON SYSTEM AND BE 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO REPLACED N11H MATERIAL AS SPECIFIED IN 310 CMR 15.255;x;3}...- - WITHIN B' OF FINISHED GRAAE. 11. A VARIANCE OF 20' IS REOUIRED FOR THE TOP OF FOUNDATION TO 3. ALL COMPONENTS' OF THE SANITARY SYSTEM SHALL BE CAPABLE OF BE } 9 f OF 3/4H PER FOOT SHALL BEMAINTAINEDFORAA MINIMUM OF I 1 V47H THE HIGH IN THE ROAD. NEGATIVE OWEVATHSTANDWO H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN AROUND THE FOUNDATION. 1USED UNDER ORRt)y1IHINOR A 00FT. OF AREAS' R VES 2OR PANG AREAS SHALL E r L ry 01 ti - , P n�� L <) I 4� LJt1t.{ evr I°v } L 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALT. BE MORTARM 7N PI ACE NO DETURNINATION tfAS BEEN MADE A5 TO COMPLIANCE V47H DEEDED OR ZONING TO OflTAtNI £ �! c"wf fi. UitIIAES sHOW1 Ate ak 4X41 AT04 CQ1FiIU-: MR 15 TO CALL 'bly -sAF� A7lti4•--�` ,�I 72 HOURS PRIOR TO COWUNtOM '"AIRK ON SM 7. COYTRAC3f ra gt&$` A Atf� WMIONS AS WELL AS �,, n: ( I T SITE ii—mi trr AX-AWON ATE AlIY VQRFATtON 1 r V lJ I H IS M BE 1: . T A OF THE DESIGN ENGINEER k�''// tMMEDIATT�.Y T01`J `:d i . ' ' _ I f \ & PARCEL IS IN I't 2C• ..- 9. OT IS SHOWN ON tom' OG AS PARCEL. 20 JIM 27 M Ifl-- 09 RECLIVIC APPROVED: BOARD OF HEALTH DATE AGENT PROPOSED SEPTIC DESIGN FOR IDufcNJ-JSr'2uC7?0 PROJECT T iWAH, 59