Loading...
HomeMy WebLinkAbout4327 RevRED CEDAR CLAPBOARD 4' TO WEATHER OTHER ELEVATIONS ARE W.G. SHINGLES 5' TO WEATHER 7 `)1u113 NMI 1 6YW6e: 8 V 6- NVP 16. Py 4'' 1Onti oL�f pr q� f vd . IM N 0 g . a W pq J N M H U X Z N Oof%D W Q (Y) Pq oc) [3 o a3L.0 L t� O o -Is 0� fW- \ O �- lf7 Z SCALE, ./s SIDE ELEVATIOAW' 5CALEP 1/8' = 1'-O' IQI J 7_ In' 1 A -J un 1 L lilti J1Q _ -- -. m P\ FAR ELEVATION � SGA' -E, 1/4- _ 1'-0' - LEFT SIDE ELEVATION SCALE 1/4' = 1'-0*SHEET NUMBERin/ n z TOP OF FOUNDATION ELEV. = 25.6 3�> 4' CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER F_L LEV. = 22.1 ELEV. = 21.7 BENCHMARK c 20 FT. MINIMUM FROM CELLAR HORIZ TEXTURE COLOR 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE �y 0-6" A LOAMY SAND t0YR3/3 CLEAN SAND 6-18" CONCRETE LOAMY SAND 10YR6/8 COVERS Cl LOAMY SAND LOAM AND SEED 4" SCHEDULE 40 PVC PIPE C2 LOAMY SAND 10YR6/1 MIN. PITCH 1/8" PER FF. REVISED 7�/< //16 2" LAYER OF 1/8" TO 1/2- 6 WASHED STONE REVISED /Z/,9�%O SHEET f OF I 6" MAX MAX.22.27 MIN. VENT NOT REQUIRED 1 CU. FT. OF CONCRETE FLOW LINE 21,52 a ANCHOR 10 - MIN. 1 - 2.0" LEV. - 21.45 o o agm e 11 o LEVEL2'0'1 0 >3 0" ELEV. - - 20.1 ELEV. = 21.4 6" SUMP ELEV. = 21.2 BAAFS DISTRIBUTION ELEV = J BOX 21.02 7 INFILTRATORS WITH STONE IN AN (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 1500 GALLON IF MORE THAN ONE OUTLET 11' X 49' X 11" TRENCH FORMATION ~ (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION WELL AiW-247 SEPTIC TANK ZONE B 3/4" TO 1 1/2"INDEX SYSTEM (SAS) 25.3 WASHED STONE ADJUST 4.6 SEWAGE DISPOSAL SYSTEM PROFILE BOTTOM OF TEST HOLE OR W2/ 7/99fi ELLEEV. = OBSERVEDSGS WATER TTABLE (ABLE 1116.5 NOT TO SCALE - SOlLRf �RVF ABg oRPnot, S,., SD /L A85pRPnON r ' _ D. i. BOX P;x 'e' s d 6- Nrr 6. sw.r f }Cc- 1° I 1500 GALLON SEPTIC TANK FSP / 2 uo 45o. OO p � O o� a Q 0 Q), SUIL I EST DATE OF SOIL TEST FEBRUARY 7. 1996 SOIL TEST DONE BY T. Md F I AN WITNESSED BY P. BRYANTON OBSERVATION HOLE 1 ELEV.= 20.5 OBSERVATION HOLE 2 ELEV.= 20.5 PERCOLATION RATE 6:20 MIN./INCH AT 48 INCHES PERCOLATION RATE MIN./INCH AT INCHES DEPTH HORIZ TEXTURE COLOR MOTT. �y / 2 uo 45o. OO p � O o� a Q 0 Q), SUIL I EST DATE OF SOIL TEST FEBRUARY 7. 1996 SOIL TEST DONE BY T. Md F I AN WITNESSED BY P. BRYANTON OBSERVATION HOLE 1 ELEV.= 20.5 OBSERVATION HOLE 2 ELEV.= 20.5 PERCOLATION RATE 6:20 MIN./INCH AT 48 INCHES PERCOLATION RATE MIN./INCH AT INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-6" A LOAMY SAND t0YR3/3 PROJECT LOCATION LOT I 25 CRANBERRY LANE S. YAR. 6-18" B LOAMY SAND 10YR6/8 18-36" Cl LOAMY SAND 2.5Y7/6 6-120 C2 LOAMY SAND 10YR6/1 BANDS OF SAND WATER ENCOUNTERED AT 1!6 ELEV. = "5 APPROVED }UTO COMMITTEE arwRD LEGEND: EXISTING SPOT ELEVATION 00,0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 00.0 FINAL CONTOUR 00 SOIL TEST LOCATION UTILITY POLE __o_ TOWN WATER =W CATCH BASIN (J GAS UNE G DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-9" A LOAMY SAND 10YR3/3 PROJECT LOCATION LOT I 25 CRANBERRY LANE S. YAR. 9-24" B LOAMY SAND 10YR6/8 24-36" Cl LOAMY SAND 2.5Y5/6 6-126 C2 LOAMY SAND 10YR6/1 BANDS OF SAND WATER ENCOUNTERED AT 108" ELEV. = 11.5 DESIGN CALCULATIONS NUMBER OF BEDROOMS 4 GARBAGE DISPOSAL UNIT NO TOTAL ESTIMATED FLOW (11Q-GAL/BR./DAY X 4 BR.) 440 GAL/DAY REQUIRED SEPTIC TANK CAPACITY 880 GAL ACTUAL SIZE OF SEPTIC TANK 1500 GAL SOIL CLASSIFICATION I DESIGN PERCOLATION RATE < 7 MIN./IN. EFFLUENT LOADING RATE 0.68 GAL/DAY/S.F. LEACHING AREA 649 SQ. FT. (11X49)+(6OX2X11/12) LEACHING CAPACITY (AREA X RATE) 441.3 GAL/DAY 649 X 0.68 RESERVE LEACHING CAPACITY 441.3 GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH LDL✓ jR LCR N� REG*j�ATIONS. OWNER 1' APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-800-322-4844 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. 8. PARCEL IS IN FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSORS MAP 97 AS PARCEL S 9 10. SEPTIC TANK AND DISTRIBUTION BOX ARE TO BE EITHER SET ON A 6" BED OF 3/4" - 1 1/2" STONE OR ON MECHANICALLY COMPACTED SOIL. 11. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND THE SOIL ABSORPTION AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 12. DESIGN ENGINEER IS TO INSPECT AND CERTIFY THAT THE SEPTIC SYSTEM HAS BEEN INSTALLED IN ACCORDANCE WITH THIS PLAN. APPROVED: BOARD OF HEALTH DATE AGENT O 1996 SWEETSER -LOCUS II z W,. o af Z 2 Q 1/ ROUE 6 PROPOSED SEPTIC DESIGN FOR DAVENPORT REALTY TRUST PROJECT LOCATION LOT I 25 CRANBERRY LANE S. YAR. SWEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398_3922 SOUTH DENNIS, MASS. 02660 DATE JUNE 5, 1996 scALE 1" = 20' REVISED 7�/< //16 JOB N0. 3783-00 LOCATION MAP REVISED /Z/,9�%O SHEET f OF I O 1996 SWEETSER PLAN LEGEND �0. UTILITY POLE _E— OVERHEAD ELEC. \ \ \ \ \ \ \ 1 IP \ FND 9 V- 0 0 / co z o o g p PRGEL g6 12a ��1�Z Op"ti PROPOSED 32,704± SF -20.5 LOT 1 S. F. - A.M. 49 PARCEL 102 A.M. 49 PARCEL 127 - z\ \ A.M. 49 PARCEL 103 / i / / / / / A.M. 49 PARCEL 104 2p, STK % W/NAIL F FND A.M. PARCEL e LOT 2 S. F. 0 Syak� A. M. 49 -'' PARCEL 107 \ CB `\ W/DH FND \ \ \ \ \ \ \ O STK W/NAIL FND 49 105 STK W/NAIL FND A. M. 49 PARCEL 106 i / car IP FND \2 CB \ W/DH FND IP FND �- ASSESSORS MAP 49 PARCEL 100 - #16 LAKE`ROAD PARCEL 101 - #22 LAKE ROAD PARCEL 102 - #18 LAKE ROAD REFERENCE DEEDS: 4915-39, 4915-40 & 12634-271 ZONING DISTRICT. R25 R25 DIMENSIONAL REQUIREMENTS: MIN LOT AREA = 25,000 S.F. MIN. LOT FRONTAGE = 150' MIN. FRONT YARD = 30' MIN. SIDE YARD = 15' MIN. REAR YARD = 20' MAX. BLD. COVERAGE = 25% MAX. SHAPE FACTOR = 22 0 20' 40' 1\- tq xo Lf) �0 � � J Q N 0< U � O p� V) W� W Q JO Z > U D V) to w wQN �uj�I O U�Lr) �00 I�� z J w LL- Ld z F- o w< WuiW J F - I -- O J D W O (L O a O u- 0 W 0L D (a W Ir En W a Uj J W Q O w Z 0- V) J I w II O v) � Iw- J Q o.. U? U � U a z z O yz Q ON J n- O n- I=- z = O I - (L p Q 0 W >- Q O J IL W F - Q Q N 0 rn 5 w O Z