Loading...
HomeMy WebLinkAbout6-A170LEFT ELEVATION RIGHT ELEVATION No a co O 12M OF FINAL 155T 11129106 I 1111-1 UNI.F55 NOT�n 011HM15F TOP OF FOUNDATION ELEV. = 34.60 9.50 ELEV. LEGEND: 10 FT. ADVANTEX MODEL AX-; 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT.'h, 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE 2" PRESSURE PIPE 150 PSI MINIMUM - MANHOLE COVERS BIOTUBE / PUMP " PACKAGE E24„QQ Lr / ELEV. � 1500GAL X4.44_ .I (TO BE SET ON A FIRM BASE) 2000 GALLON SEPTIC TANK SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE \ \ N \ o \ 1 N \ MANHOLE COVERS 2" SCHEDULE 40 PVC PIPE MIN. PITCH 1/8" PER FT. / CAP & VALVE 3" DIA. PVC. MANIFOLD VALVE 2" HOLE/ ELEV. e / 3/8" DRILL 3�J2-J - HOLE 3/4" TO 1 1/2" CLEAN DOUBLE WASHED STONE FREE OF FINES & SILT - CHECK VALVE PUMP CHAMBER ELEV. AT INVERT INLET 24190- ELEV. AT ALARM ON ELEV. AT PUMP ON ELEV. AT PUMP OFF 24 BOTTOM OF INSIDE PUMP CHAMBER BOTTOM OF OUTSIDE PUMP CHAMBER \ 58.9 !1 \ \ LOT11 \l " 9 7 S 4 c,/ • 20.1 P11MP \ 77. G 02 2+ 5. F. 4':' &Z ` O�o� I CHAMBER �'2 LESER �' 1 I :27 I 2040 GA QN SEPTIC T N'K 2 /Ik- I il�{ill, / h IL/,4tiyI, III� • 20.82 i'I'rll 26 07 EXISTING SPOT ELEVATION OOxO EXISTING CONTOUR----00---- FINAL SPOT ELEVATION 0 . FINAL CONTOUR 00 SOIL TEST LOCATION UTILITY POLE TOWT1 WATER ®.W I>�W�' M INSPECTION CAP & CLEAN SAND PORT C 2" LAYER OF MANHOLE VALVE \1/8" TO 1/2" COVERS VENT 35.00 MAX. 32.73 MIN. \WASHED STONE REQUIRED � z 32.00 ° 0, _-e S e '� :. SEPT' . 8 . I e 0 2" HOLE FA , ae• a _= ELEV. _ _3U.92 0 0 0 0 0 0 0 0 ELEV. = 30.42._ 14 STANDARD INFILTRATORS WITH STONE INA z WELL A1W 230 10.33' X 46' X 80 FIELD FORMATION 18.12 ZONE C INDEX 23.3 SOIL ABSORPTION ADJUST 28 SYSTEM (SAS) USGS PROBABLE WATR TABLE ELEV. = _1230 OBSERVED WATER TABLE ;9/13/05) ELEV. - _ 9.60 TEST HOLE 2, LOT 9 BOTTOM OF rEST HOLE ELEV. =-21,6Q- PUMP CHAMBER CALCULATIONS: REQUIRED FLOW PER CYCLE .25 X 3M 8250 GAL./CYCLE VOLUME PER CYCLE -0=- GAL/CYCLE /7.48 GAL./CU. FT. - 11.03 CU. FT./CYCLE VOLUME OF WATER IN FEED 3.14 X 0.00694 X 42 _ FT. _ _9.8.2_ CU. FT. VOLUME OF WATER IN MANIFOLD 3.14 X 0.015625 X _-A_ FT. a 0.25_ CU. FT. TOTAL VOLUME OF WATER RETURNED 1.17 CU. FT, TOTAL MINIMUM VOLUME PER CYCLE 1220 CU. FT. DISCHARGE 12.20_ CU.FT. /34.67 CU.FT./FT. - 0.35_ FT. (1000 G.S.T. STORAGE CAPACITY (-3X-GAL./DAY/7.48 GAL/CU.FT./34.67 CU.FT./FT. _ _1.22.__ F7 _1.27_ REQUIRED _2.,'10_ PROVIDED / • 34 Ri • '34.50 \ 36.53 1 I � l 1 " 36.81 1 134.06 34. D SAS J O 1 TEST SOIL 2 h !4, RSER S�s�o _ O DSKr- I� 10k 35.65 DECK12 / P{ POSED / IU 38.1 I I \ 1 / 3 BEDR PORCMSLING Trill r H I j 1' 1111 11( PR POs, D f �r -•- �33. IL S1 Fez 17,0( TET B-H s � -- �• 30.39 30.98 33.48 ti \ 35.18 \ � " L ` -35.36 3 AS 1. _ - o \ � _ a _ _ �s 32.18 50� 3.55 3 32.83 / 32: DO V� S W�/VG- - 9 5'27• - ROAD 18 � 33.53 633.67 Ir :Z /Y " l" V �i � 3.0 �"f 0 8-34X9 34. 49 UUAM- 340 l 2' FI 1-1/2" LATERAL LINE 3/8" HOLES 0 5' O.C. ALTERNATE SIDES (0 11 AND 1 O'CLOCK) 3 - 3/8" DRAINAGE HOLES PER LATERAL 0 BEGINNING, MIDDLE & END (6 TOTAL) 3" PVC MANIFOLD DISTRIBUTION LATERALS AT 52" D.C. SIDE VIEW SOIL TEST DATE OF SOIL TEST SEPTEMBER 13_2005 SOIL TEST DONE BY SWEETSER �tjSI RING WITNESSED BY A. VQN HONE OBSERVATION HOLE 1 ELEV.=--35.90 OBSERVATION HOLE 2 ELEV.- 34.10 PERCOLATION RATE _ 4� MIN./INCH AT 58 _ INCHES PERCOLATION RATE 4_2_ MIN./INCH IN C2 HORIZON DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-30 30-120 B/C1 C2 LOAMY SAND MEDIUM SAND 2.5Y7/4 NO STRIPPED/MIXED NO WATER ENCOUNTERED AT �2D= ELEV. _ _-255,9D END VIEW PRESSURE PIPE !OM F UMP CHAMBER HORIZ TEXTURE COLOR MOTT. OTHER 0-66 66-150 B/C1 C2 LOAMY SAND MEDIUM SAND 2.5Y7/4 NO STRIPPED/MIXED ' SOIL CLASSIFICATION DESIGN PERCOLATION RATE $ 5_ MIN./IN. EFFLUENT LOADING RATE �1 GAL/DAY/S.F. LEACHING AREA 'O. 10.33 X 46 LEACHING CAPACITY (AREA X RATE) 351.63 GAL/DAY 475.18 X 0.74 RESERVE LEACHING CAPACITY .3= GAL./DAY JOB N0. 6250-00 REVISED 5.0' 5.0' LOCATION MAP REVISED SHEET 1 OF 1 TOP VIEW tH OF MAd T. A. DUMAS N o..61 S DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-66 66-150 B/C1 C2 LOAMY SAND MEDIUM SAND 2.5Y7/4 NO STRIPPED/MIXED ' NO WATER ENCOUNTERED AT _ 150" ELEV. - 21.60 DESIGN CALCULATIONS NUMBER OF BEDROOMS 3 GARBAGE DISPOSAL UNIT _ _ _- TOTAL ESTIMATED FLOW ( 110 GAL/BR./DAY X _3_ BR.) -,r"34_ CAL./DAY REQUIRED SEPTIC TANK CAPACITY BBQ- GAL. ACTUAL SIZE OF SEPTIC TANK _2 GAL. SOIL CLASSIFICATION DESIGN PERCOLATION RATE $ 5_ MIN./IN. EFFLUENT LOADING RATE �1 GAL/DAY/S.F. LEACHING AREA 475.1 SQ. FT. 10.33 X 46 LEACHING CAPACITY (AREA X RATE) 351.63 GAL/DAY 475.18 X 0.74 RESERVE LEACHING CAPACITY .3= GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WIYHSTANDING H-20 LOADING. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL v BE MORTARED IN PLACE. a 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL -'DIG -SAFE' AT 1-888-344-7233 AT LEAST 72-WOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER _ IMMEDIATELY. B. PARCEL IS IN FLOOD ZONE C 9. LOT 1S,SHCWN ON ASSESSORS MAP LQ.$_ AS PARCEL _it - 10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS. 11, ALARM IS TO BE BOTH AUDIO AND VISUAL. 12. SEPTIC TANK AND PUMP CHAMBER ARE TO BE TESTED TO INSURE THAT THERE IS NO INFILTRATION OF GROUNDWATER INTO FACILITIES. UNSUITADLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3). 14, EXISTING SEPTIC FACILITIES ARE TO BE PUMPED AND REMOVED. !15. THE SEPTIC TANKS AND PUMP CHAMBER ARE _ TO BE SET ON A FIRM BASE OR 3/4" TO 1 1/2" STONE 6" THICK. \ 18. THE CONTRACTOR IS TO CONTACT THE DESIGN ENGINEER FOR THE FOLLOWING MINIMUM INSPECTIONS: 1 STAKE OUT SYSTEM. 2 PRIOR TO AND DURING THE SETTING OF THE TANKS. 3 IF BUILDING DEBRIS OR STUMPS ARE ENCOUNTERED DURING EXCAVATION. 4, EXCAVATION OF THE SAS, PRIOR TO FILL PLACEMENT. - - _5. INSTALLATION OF ALL PIPING, 6. COMPLETION OF SEPTIC SYSTEM, PRIOR TO BACKFILL 17. CONTRACTOR TO HAUL ALL POLLUTED STONE, SAND, DEBRIS TO A SUITABLE DISPOSAL SITE. 18. PUMP IS TO BE A MEYERS SRM 4 4/10 HP (W/31 GPM CAPACITY & 14.5HEAD) OR EQUAL. o APPROVED NOV 3 0 p006 APPROVED: BOARD OF HEALTH DATE AGENT 02006 SWEETSER ENGINEERING LOCUS ? z z Op�9T �F ROSE 6 PROPOSED SEPTIC DESIGN FOR DUBLIN CONSTRUCTION, INC. PROJECT LOCATION LOT 11 DOVE'S i`lING ROAD, YARMOUTH .S 235 GREATWESTERNOOAD 508 SOUTH 0. BOX 398-3922 02660 DATEAUG. 3,2006 SCALE 1" = 20' JOB N0. 6250-00 REVISED LOCATION MAP REVISED SHEET 1 OF 1 02006 SWEETSER ENGINEERING