Loading...
HomeMy WebLinkAbout4-A242Y ill FRONT ELEVATION o- REAR ELEVATION SCALA UHLE55 NOT�n OTN�pW15� 1■1' ���►�� ������� ��►�►�� (�►�►�� ��►�►�� �Ilol� ►.►�� Y ill FRONT ELEVATION o- REAR ELEVATION SCALA UHLE55 NOT�n OTN�pW15� l (1 N z N Q � � � � co N } 5 O � U FRONT ELEVATION ATION REAR ELEVATION2 tgA 0r F N& 55U I I / 05/ 04 5CAI,� UU55 NOtn OTHM15E y AaN}- LEFT ELEVATIC-11PIN RIGHT SEL EVATI"N e 1 � C� co } 4�-- PM, 0f FINAL 155T l/ 05 / 04 SCALA UNL�55 NOf�p 0TH PIW15� PA6� # .-' Y LEFT ELEVATION � TRIGHT lELEVATIODT e C) K1 FINAL 155T I I / 05/ 04 5CALF UNLF55 Nib OfHFPIW15F 1/411 - 1' 3 P77 # I (1 N .N v� � � N 77 N 73 O � LEFT ELEVATION � TRIGHT lELEVATIODT e C) K1 FINAL 155T I I / 05/ 04 5CALF UNLF55 Nib OfHFPIW15F 1/411 - 1' 3 P77 # N LOCUS ASSESSORS MAP; 127 PARCEL: 64 4 CURRENT ZONING: R-40 lis MINIMUM BUILDING SETBACKS: ON'ti 4409+ 009 FRONT: 30' SIDE: 20' REAR: 20' 941`t't�� FLOOD ZONE: C LOCATION MAP PARCEL 64 (60,945 SF) EXISTING DWELI TO BE REMOVED EXISTING DRIVE TO BE MODIFIED f. l 10,5- �\ A 'LTCB 20----- 22__ --- - - TCBL`.� 24-- ---- -`. 'N - 2 CB 28- - - - .. \ ` . • EXISTING DOCK 32- 364- .LTCB 3 38 42 44, cp 46- ` 48- \ ` `TCB 5 -2 50. ;i. -5 N . -15 -24 ` TCB 6 -26 -28 -30 2 SO' OFF TOP OF �ftfo46 AF��fi� `34 COASTAL BANK 50_ A x'10 r� - -36 100' OFF TOP OF COASTAL BANK 48 10, / `38 10, EXISTING SEPTIC IOg3 6 SYSTEM TO BE PUMPED AND REMOVED ir,, 48 n�'40 l 4� O94t) BENCHMARK AT - CONCRETE BOUND KEY: ELEV=48.81' EXISTING CONTOUR: - - PROPOSED CONTOUR: ---- EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25.5 TEST HOLE: * UTILITY POLE: - - FENCE LINE: - - - HYDRANT: -- RETAINING WALL: DM// 04-18 \. W 48 4644 '42 E t 1 ', BENCHMARK AT G 02' �-CONCRETE BOUND PA VE ELEV=44.23' 44.6 OVERREAD ELECTRIC EXISTING WATER SERVICE TO BE REPLACED SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 _ BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY SEPTIC TANK: 440__ OAL / DAY x 2 DAYS = 880 GAL USE 15Q GALLON SEPTIC TANK LEACHING AREA: US6 4 INFILI'RAT'OR CHAMBERS (MODEL 3050) WITH 4' OF STONE ALL AROUND (36.4' x 12.2' x 2' DEEP) �TDE AREA. (36.4' + 12.2'; x 2 x 2 = 194 SF (0.74) = 144 GAL/DAY UITOM AREA: 36.4' x 12.2' = 444 SF (0.74) = 329 GAL/DAY CAPACITY = 473 GAL/DAY SEPTIC SYSTEM SECTION 52.0 TOP OF FOUNDATION 49.0 ,/ ELEV. 48.0 / . 1500 GAL ELEV. SEPTIC TANK (6" OF STONE UNDER OR MECHAIQICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN DEMAREST - McLELLAN ENGINEERI,N'G 24 SCHOOL STREET, P.O. BOX 463 WEST DENNIS, MA, 02670 PHONE & FAX: (508) 398-7110 NOTES 1. VERTICAL DATUM: NGVD 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO 11-20 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (T'IT'LE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3'. 11. EXISTING SEPTIC SYSTEM (SEPTIC TANK & PIT) TO BE PUMPED AND REMOVED. 12, ALL UNSUITABLE SOIL (SANDY FOAM WITH SILT LOAM, APPROX.10' DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND, COVERS WITHIN 12" OF FINISED GRADE (ONE INSPECTION COVER TO BE WITHIN 6" OF GRADE) 47.75 L'` ELEV. 47.55 47.38 ELEV. ELEV. D -BOX (6" OF STONE UNDER" - GAS BAFFLE AT OUTLET TEE TEST HOLE E(DGS 6'4" 16' ENGINEER: THOMAS MCLELLAN, P.E. Ill WITNESS: DAVID FLAHERTY, R.S. zy��Cf ��E4 13'3.5" DATE: 9-21-04 PROPOSED 14' PERCOLATION RATE: < 2 MIN / INCH 16' T11-1 48.5 TH-2 48.0 ELEV. ELEV. 17' 0/A HORIZON OLA HORIZON REEF REALTY GAR. SANDY LOAM SANDY LOAM 24' 9" IOYR 2/2 47.7 11" 10YR 2/2 47.1 B HORIZON B 14ORIZON SANDY LOAM SANDY LOAM 30" IOYR 5/8 46.0 36" 10TR 5/8 45.0 Cl HORIZON CI HORIZON SANDY LOAM WITH SANDY LOAM WITH 120" SILT LOAM 38.5 108" SILT LOAM 39.0 C2 HORIZON C2 HORIZON MEDIUMSAND MEDIUM SAND 2.5Y 8/2 2.5Y 8/2 180" 33.5 I68" 34.0 NO GROUND WATER ENCOUNTERED SEPTIC SYSTEM DESIGN FLOW ESTIMATE: 4 _ BEDROOMS AT 110 GAL / DAY = 440 GAL / DAY SEPTIC TANK: 440__ OAL / DAY x 2 DAYS = 880 GAL USE 15Q GALLON SEPTIC TANK LEACHING AREA: US6 4 INFILI'RAT'OR CHAMBERS (MODEL 3050) WITH 4' OF STONE ALL AROUND (36.4' x 12.2' x 2' DEEP) �TDE AREA. (36.4' + 12.2'; x 2 x 2 = 194 SF (0.74) = 144 GAL/DAY UITOM AREA: 36.4' x 12.2' = 444 SF (0.74) = 329 GAL/DAY CAPACITY = 473 GAL/DAY SEPTIC SYSTEM SECTION 52.0 TOP OF FOUNDATION 49.0 ,/ ELEV. 48.0 / . 1500 GAL ELEV. SEPTIC TANK (6" OF STONE UNDER OR MECHAIQICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN DEMAREST - McLELLAN ENGINEERI,N'G 24 SCHOOL STREET, P.O. BOX 463 WEST DENNIS, MA, 02670 PHONE & FAX: (508) 398-7110 NOTES 1. VERTICAL DATUM: NGVD 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS SUBJECT TO TRAFFIC LOADS TO CONFORM WITH AASHTO 11-20 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (T'IT'LE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3'. 11. EXISTING SEPTIC SYSTEM (SEPTIC TANK & PIT) TO BE PUMPED AND REMOVED. 12, ALL UNSUITABLE SOIL (SANDY FOAM WITH SILT LOAM, APPROX.10' DEEP) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND, COVERS WITHIN 12" OF FINISED GRADE (ONE INSPECTION COVER TO BE WITHIN 6" OF GRADE) 47.75 L'` ELEV. 47.55 47.38 ELEV. ELEV. D -BOX (6" OF STONE UNDER" - GAS BAFFLE AT OUTLET TEE 3' MAX. COVER (1' MIN) 2" PEASTONE 3/4" - 1 1/2" WASHED STONE ELEV.= 47.5 45.0 4j E4,� ELEV, 36.4' 30 47.0__/ 4 INFILTRATOR CHAMBERS (MODEL 3050) ELEV: WITH 4' OF STONE ALL AROUND (36.4' x 12.2' x 2' DEEP) SITE AND SEWAGE FLAN APPROVED BY: 16' 14' 6'4" 16' DK. Ill 45'8.5" 8' zy��Cf ��E4 13'3.5" SOUTH YARMOUTH, MA PROPOSED 14' 36' 16' 4 BEDROOM PREPARED FOP. DWELLING 81 17' 10' 2, 6' REEF REALTY GAR. IJ 24' REFERENCE: LAND COURT CASE 21033 THOMAS bTcL N, P.E. PROPOSED DWELLING ' 3' MAX. COVER (1' MIN) 2" PEASTONE 3/4" - 1 1/2" WASHED STONE ELEV.= 47.5 45.0 4j E4,� ELEV, 36.4' 30 47.0__/ 4 INFILTRATOR CHAMBERS (MODEL 3050) ELEV: WITH 4' OF STONE ALL AROUND (36.4' x 12.2' x 2' DEEP) SITE AND SEWAGE FLAN APPROVED BY: DATE: LOCATION: 72 DRIFTWOOD LANE PAS. rf�r" i•n zy��Cf ��E4 SOUTH YARMOUTH, MA r "`" PREPARED FOP. es °o'z REEF REALTY SCALE: 1" = 40' DATE: 9-23-04 IJ REFERENCE: LAND COURT CASE 21033 THOMAS bTcL N, P.E. JOHN Z. DEMAREST JR., P.L.S. qe e ?-q 7--