HomeMy WebLinkAbout2015 Oct 09 - Email to David Mason Re: Required Revisions,
i '
IvonHone, Amy
From: vonHone, Amy
,� Sent: Friday, October 09, 2015 9:58 AM
To: 'Mason, David'
Subject: 34 Harbor Road
Dave-
A couple of things that need to be clarified (sorry):
' 0�1. Existing system location for purposes of either needing a removal for the new system or to make sure it
� �, gets backfilled
� �2. List the foundation setback variance under maximum feasible compliance
i '�3. Crawl space or full foundation?
� 4. Top of the liner should be at the breakout elevation (EL. 95.5?) Bottom of the liner should be at the
crawl space floor or the cellar floor(EL. 94.9 or EL. 91.4?)
�5. Perc date was May 20, 2015
� 6. Show work limit line along back property line for Conservation ( I will be giving her a copy of the plan for
� her file)
If Scott will be putting this system in before October 26, Bruce should be able to approve the revised
plans. Have him bring in the plans with his permit application.
Thanks, Amy
Amy L.von Hone, R.S., C.H.O.
Assistant Health Director
Yarmouth Health Department
1146 Route 28
South Yarmouth, MA 02664
_ (0) 508-398-2231 X1241
(F) 508-760-3472
� avonhonel�avarmouth.ma.us
1