Loading...
HomeMy WebLinkAboutEngineered Plan - 2015TOP OF FOUNDATION ELEV. = 129.001p FT. MINI UM (ASSUMED) LEGEND: EXISTING SPOT ELEVATION00.0 EXISTING CONTOUR ----00----- i FINAL SPOT ELEVATION 0.0 FINAL CONTOUR U SOIL TEST LOCATION - UTILITY POLE -O- TOWN WATER -W --y-=- _W_- r CATCH BASIN j GAS LINE T ----G CLEAN OUT C•0• -- CESSPOOL C.P.0 FT. MINIMUM FROM CEI 10 FT, MINIMUM 2 CRAWL SPACE SLAB CONCRETE CLEAN SAND "MA-11 COINCRETE INSPEOTION PORT CO ERS LOAM 14D $EED q" SCHEDULE 40 PVP PIPE 2" LAYER E MIN. PITCH 1/t" PER FT. 1/8 TO 1 9,3 WASHED STONE R FILTER FABRIC6 MAX. TV� g8.5p 0.00 4AX. 6.70 M 1, VENT SOIL T DATE QIS- F SOIL T O TOBf:R 15. 2015 SOIL TEST QONE BY SWEET ER NGIN'ERIN WITNESSED PY _Pj_ LR -----=---- QB ERVATJON HOLE 1 ELEV.=_.99.Q- PERCOLATION RATE "� <_T�_ MIN./INCH AT 2 __ INCHES . DEPTH INOR14 4" CAST IRON PIPE COhPR MOTT. OTHER P-6- (OR EQUAL) MINIMUM. LOAMY $AND 1OYR4/1 NO ROOTS PITCH 1/4" PER FT. ME IUM SAND ELEV. ELEV. LI E UID tiH OUTLET TEE RECD 4 FEET 14 INCHES 5 FEET 19 INCHES 6 FEET 24 INCHES 7 FEET 29 INCHES 8 FEET 34 INCHES LEGEND: EXISTING SPOT ELEVATION00.0 EXISTING CONTOUR ----00----- i FINAL SPOT ELEVATION 0.0 FINAL CONTOUR U SOIL TEST LOCATION - UTILITY POLE -O- TOWN WATER -W --y-=- _W_- r CATCH BASIN j GAS LINE T ----G CLEAN OUT C•0• -- CESSPOOL C.P.0 FT. MINIMUM FROM CEI 10 FT, MINIMUM 2 CRAWL SPACE SLAB CONCRETE CLEAN SAND "MA-11 COINCRETE INSPEOTION PORT CO ERS LOAM 14D $EED q" SCHEDULE 40 PVP PIPE 2" LAYER E MIN. PITCH 1/t" PER FT. 1/8 TO 1 9,3 WASHED STONE R FILTER FABRIC6 MAX. TV� g8.5p 0.00 4AX. 6.70 M 1, VENT SOIL T DATE QIS- F SOIL T O TOBf:R 15. 2015 SOIL TEST QONE BY SWEET ER NGIN'ERIN WITNESSED PY _Pj_ LR -----=---- QB ERVATJON HOLE 1 ELEV.=_.99.Q- PERCOLATION RATE "� <_T�_ MIN./INCH AT 2 __ INCHES . DEPTH INOR14 TEXTURE COhPR MOTT. OTHER P-6- A LOAMY $AND 1OYR4/1 NO ROOTS P -12t;" ME IUM SAND 2.3Y7/4 FLOW LINE LEVEL RS TEE NUJ WATER ENGOUNTEREQ AT 1--�6 - ELEV. _ �R8.5 _ 10" FLOW LIE 96.000 c [•FAIN. 10" ---� { _D�SIPN CALCLI� 11�NS 1ELEV. _ �37_ MIN. r 0,. 4 0 _ 4 ELEV. _ ° NLJMBEt OF BEDROOMS -B_�? L VEL o f fpr o 94.67 GARBAGE DISPOSAL UNIT ELEV. - _97QQ GAS 6' SUMP E F, =o - = ° ELEV. _ ..-_ ADD GAS - -- BAFFLE ELEV. a 9 LEV. _ '_.50w ° - - TOTAL ESTIMATED FLOW ( 11p /pR,/DAr X T4,�. SR.) �. GAL./DAY BAFFLE D�ST�I IJTiR I ELEV.\ RFQUIRED FIRST SEPTIC TANK CAPAC TY SSL, GAL,. EXISTING _ �_ 6 HIGH CAPACITY INFII TRATORS WITH z P.17 ACTUAL SIZ OF FIRST SEPTIC TANK(POS7 �„ GAL. (EXISTING) (TO BE PLACED ON FIRM BASE) ® STONE IN AN REQUI qED SE,CONp SEPTIC TANK CAPACITY _���, GAL;. 1000 n TO BE WATER TESTED 11' X , + X gyp• TRENCH FORMATION WELL AGTUA SIZE OF SECQND $EPT1C TANK p GAL; CALLOW 14�a GALLON IF MORE THAN ONE OUTLET ZONE 1QOO �/i�� SOIL C ASSIFLCATION TANK !� z INDEX D SIGN PERCOLATION RATE MIN./1N. E��Q � � (TO BE PLACED ON FIRM BASE) 5,��+`� � S� � �+ PDJUST. EFFLUENT LOADING RATE _ a GAL./DA'{%S.F. S PTHC TANK 3/4" TO 1 1/2' CLEAN SY 1[_.m �S� � 'a� `LEACHING AREA. ;- �SY. SQ. FT: DOUBLE WASHER STONE 3 A FREE OF FINES &SILT USG$ PROBABLE WATER TABL ELEV. _ ___�__ (11X¢0+(�+9X?.�'f0/12) = LEACHi�dG A XTY (AREA X RATE) GAL./DAfOBSfRVED WATER TABLE ELEV. •3o4SEeAGE DI POSA� $YSTEMPR0ILS BOTTOM OF TEST HOL ELEV: NOT TO SCALE RESERI(E LEACHING CAPACITY _V� GAL,/DAY N OTE$: 174.41' 1. ALL WORKMANSHIPANQ� MATERIALS SHALL CONFORM TO D.E.P. TITLE 5' AND' THE TOWN S ROLES AND REGULATIONS FOR THE SUP5URFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO $ANITARY i NITS SHALL BE BROUGHT TO ' WITHIN B" OF FINISHED GRAPE. 3. ALL COMPONENTS .OF THE SANITARY SYSTEM SHALL VE' C APABLE OF WITHSTANDING H-10 LQADING UNLESS THEY ARE UNQER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING'SHALL QE' LOT B USED UNDER OR WITHIN 10 'FT. OF DRIVES OR PARK114G AREAS., 22,570.1 S.F. 4. ANY MASONARY UNITS .USED TO BRING COVERS TO,GRADE SHAT -L BE MORTARED IN -PLACE. 5. NQ DETERMINATION HAP BEEN MADE AS TQ COMPLIANCE WITH • 105.9 DEEDED OR . ZONING REGULATION$. OWNER / APPLICANT 15 TO 0 TAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 96.8 6. Ul"ILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR / LL "DIG-SAFEI' AT 1-8$$-344-7 33 AT LEAST 72' HOURS IS TO CA PRIOR TO TQ COMMENCING WORK ON SITS. / . CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL 'AS 7 SITE CONDITIONS PRIOR TO COMMENCING WORK ON .SITE. ANY VARIATION / IS TO BE BROUGHT TO THE ATTENTION ' OF THE` DESIGN ENGINEER 1 / 99,3 OR�ve IMMEDIATELY. lb BH --- - J6 / 8 PARCEL IS IN FLOOD SONE 10/0 GALLON o ' �y a 9. LOT IS SHOWN ON ASSESSORS MAP ion 'AS PARCEL SEPTIC TANK 10 EXISTING LEACH [SITS ARE TO BE PUMPED AND REMOVED OR BACKFILLED. 14 10/000 GALLON v SEP�C TANK to o Iw 6 O, o t �J r 96.2 A ?tn>®uth HeltDgartee® / a' t y.. ?p VED 9.1 0.0f t f 97.6OECK (_ r `a / ` tf z '` ✓/ N . ame Rate It W 5..5 'i J /* 97.9 a+1 9, 1 y l SOIL �9 (94) DRIVE `'FEST 2 = 101.7 I Q x 96.7 �APP OQ: BOARD OF HEALTH x 99.1 D. / 110°1. BOX DATE AGENT / • 9t4.e 1 � o / x 4.6 93.7. J x 97.3 1'13..33' �' � 87.9 "TIC DF31SIG11 FOR "IN '� I 7UST LOC. 85/37 '�'h a, WTit '..Ord;;f R ak'.i'sin :203 SETUMT ROACi 508- P. 0. BOX 713 35-6900 SOUTH DENNIS, MIAS5. 0266 Rotj iE 6 DATE OCT. 16, 2015 SCALE » 1 2a, REV. JOB N0 76,60 .:.. SNFET I OF. 71- RECD LOCATION MAP LOCATION n. IS,6IPROJl7940r001dwo17640-SAS.DWG C 2015 S�EET$ER IENGINEERtt