Loading...
HomeMy WebLinkAboutEngineered Plan - 201513.7' -ACCESS COVER AT FIN. GRADE EL. 13.Ot SYSTEM PROFILE (NOT TO SCALE) PROVIDE MIN. 20" DIAM. WATERTIGHT ACCESS COVER TO WITHIN 6" OF FIN. GRADE MINIMUM 1 OF COVER 1 MINIMUM 75' OF COVER OVER POLY TANK OVER PRECAST ybj 'PROPOSED 1,500 GALLON POLYETHYLENE SEPTIC TANK (H-10) EL. 11.0' 4"4SCH40 PVC PIPES LEVEL 1ST 2' 9.69' GAS BAFFLE o0*ogogo oo WATERTEST D'BOX °°000005 FOR LEVELNESS 9.62' 9.45' 6" CRUSHED STONE OR MECHANICAL DEPTH OF FLOW = 4' COMPACTION. (15.221 [2]) NOTE: 2" MIN. WALL THICKNESS REQUIRED REQUIRED TEE SIZES: INLET DEPTH = 10" MIN. BELOW FLOW LINE OUTLET DEPTH = 14" MIN. BELOW THE FLOW LINE NOTE.- STANDARD TEES ARE TO BE USED. DO NOT USE MANUFACTURERS TEES THAT COME WITH THE TANK ( W� SLOPE) (--L-% % SLOPE) FOUNDATION- 18' SEPTIC TANK 7' - *THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM LEGEND 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. 99 PROPOSED CONTOUR 198.41 PROPOSED SPOT EL. TH1 5 � _T3 TEST HOLE 2� SLOPE OF GROUND a UTILITY POLE r Shore FIRE HYDRANT NOTE: NOT ALL SYMBOLS MAY APPEAR IN DRAWING TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE #13587 WITNESS: AMY VON HONE, RS DATE: 9/23/15 PERC. RATE _ < 2 MIN/INCH CLASS 1 SOILS ELEV. 1 p" 12.0' ALL 18" B MS 24" 1OYR 4/6 10.0' C PERC MS 1OYR 5/8 130" 1.2' G -W ADJ. DATA: WELL: MIW-29 ZONE: A 132" 1' ADJ: 2.3' GROUNDWATER ENCOUNTERED AT EL. 1.2' LCE # 15-257 F-41, • NOTES ALL SYSTEM COMPONENTS SHALL BE 1. DATUM IS NAVD88 MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. 2 MUNICIPAL WATE EXISTI G RIS N 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT.. 12.0' YSTEM 4. DESIGN LOADING FOR ALL PROPOSED PRECAST PROVIDE INSPECTION PORTS TO UNITS TO BE AASHO H-10 / WITHIN 3" OF FINISH GRADE 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. F 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF USE (16) H-20 HIGH CAPACITY INFILTRATORS IN CONFIGURATION SHOWN HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. (NO STONE PROPOSED) ( 1 % SLOPE) D' BOX 5' 10. CONTRACTOR SHALL BE RESPONSIBLE FOR 5 0' CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & LEACHING OVERHEAD UTIUTIES PRIOR TO COMMENCEMENT OF FACILITY WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED ADJUSTED GROUNDWATER SHALL BE REMOVED 5' BENEATH AND AROUND THE EL. 3.5' PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED OR PUMPED AND FILLED WITH CLEAN SAND. p�= 0 0 0 40 0 FEET LOCUS MAP NOT TO SCALE ASSESSORS MAP 26 PARCEL 100 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3 BEDROOMS ® 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A 1500 GAL. H-10 POLY SEPTIC TANK LEACHING: 4.73 SF/LF x 6.25' LENGTH = .29.56 SF PER HIGH CAPACITY INFILTRATOR UNIT 330 GPD/0.74 GPD/SF = 445.9 SF LEACHING REQ'D 445.9 SF/29.56 SF/UNIT = 15.1 UNITS THEREFORE, USE GRAVELLESS SYSTEM OF (16) H-20 HIGH CAPACITY UNITS IN FIELD CONFIGURATION OF 4 ROWS OF 4 UNITS 16 UNITS x 29.5 SF = 472 SF > 445.9 SF 472 SF (0.74) = 349 GPD (OK) APPROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF #160 RUN POND ROAD SOUTH YARMOUTH, MA PREPARED FOR EILEEN GORMAN DATE: OCTOBER 19, 2015 �00A �yt,A OF 9Assq off 508-362-4541 y fax 508-362-9880 N OF M �o DANIEL G� a_ d A a I owncape.com r�> DANIELA.9�y OJALA /� • .. �No.409a0� ROW C1*0e e,441h7eelift f, ift. C1VjL °FFss�o� civil engineers o No. 46 02 q I -��-� �o� F� t �� �4 "O S �` =� land surveyors cess ASTER �' C 939 Main Street (Rte 6A) DATE I A• OJALA, P.E., P.L. S YARMOUTHPORT MA 02675 , MA GY ow c 1 N a m m 5 � _T3 �P a Locus a r Shore nth Nantucket Sound LOCUS MAP NOT TO SCALE ASSESSORS MAP 26 PARCEL 100 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3 BEDROOMS ® 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A 1500 GAL. H-10 POLY SEPTIC TANK LEACHING: 4.73 SF/LF x 6.25' LENGTH = .29.56 SF PER HIGH CAPACITY INFILTRATOR UNIT 330 GPD/0.74 GPD/SF = 445.9 SF LEACHING REQ'D 445.9 SF/29.56 SF/UNIT = 15.1 UNITS THEREFORE, USE GRAVELLESS SYSTEM OF (16) H-20 HIGH CAPACITY UNITS IN FIELD CONFIGURATION OF 4 ROWS OF 4 UNITS 16 UNITS x 29.5 SF = 472 SF > 445.9 SF 472 SF (0.74) = 349 GPD (OK) APPROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF #160 RUN POND ROAD SOUTH YARMOUTH, MA PREPARED FOR EILEEN GORMAN DATE: OCTOBER 19, 2015 �00A �yt,A OF 9Assq off 508-362-4541 y fax 508-362-9880 N OF M �o DANIEL G� a_ d A a I owncape.com r�> DANIELA.9�y OJALA /� • .. �No.409a0� ROW C1*0e e,441h7eelift f, ift. C1VjL °FFss�o� civil engineers o No. 46 02 q I -��-� �o� F� t �� �4 "O S �` =� land surveyors cess ASTER �' C 939 Main Street (Rte 6A) DATE I A• OJALA, P.E., P.L. S YARMOUTHPORT MA 02675 , MA