Loading...
HomeMy WebLinkAboutApp# 5052i TOP OF FOUNDATION ELEV. 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CONCRETE COVERS/7 4' SCHEDULE 40 PVC PIPE MIN. PITCH 1/8- PER Fr. 4* CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4- PER FT.. FLOW LINE io- LEV. -T MIN. \-ELEV. LEVEL ELEV. BAFFLE ELEV. GAS 60 SUM ELEV. DISTRIBUTION ELEV. LIQUID OUTLET DEPTH "E (TO BE PLACED ON FIRM BASE) BOX 4 FEET 14 INCHES To BE WATER TESTED 5 Rs 19 INCHES IF MORE THAN ONE OUTLET 6 24 INCHES 1500 GALLON 7 FEET 29 INCHES (TO BE PLACED ON FIRM BASE) 8 FEET 34 INCHES SEPTIC TANK 3/4- TO 1 1/2--/ WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE CLEAN SAND LOAM AND SEED LOAM AND SEED ULJtiLKVAIIUN HULL I ELEV UdtitKVAIIUN HULL fl– Z ELEV.- PERCOLATION RATE MIN./INCH-AT INCHES PERCOLATION RATE MIN./INCH7AT INCHES A OF 2 2" LAYER OF 1 1/2 1/8' TO 1/2* DEPTH HORIZ TEXTURE COLOR MOTr. OTHER DEPTH HORIZ TEXTURE COLOR MOTT. OTHER WASHED STONE 'WASHED STONE VENT S WEETSER ENGINEERING 235 GREAT WESTERN ROAD L4> 'j'-1 1, 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 NOT REQUIRED � ZLy F—s`LE 1" = au A REVISED JOB NO. 10o 1 CU. FT. OF C14 LOCATION MAP REVISED SHEET /OF CONCRETE ANCHOR -23 Y4 15 �;4/ 15 c I 4 i#Awq PME-gr�all �l 10, 6 LE ELEV. - /,I 1�61 /- �"7'1/ Ir I S HIGH CAP�CIINFILTRATORS WITH 17 CZ VF 7 y - � "; e Cc STONE IN AN5A/ "r'l TRENCH FORMATION.4 N "/V 1 910 SOIL ABSORPTION If,! "',� /) '4 WATER ENCOUNTERED AT —'-0 ELEV. "JI, WATER ENCOUNTERED AT ELEV. ZNE SYSTEM (SAS)INDEX — ADJUST— LEGEND: DESIGN CALCULATIONS .USGS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( ) ELrV. - EXISTING SPOT ELEVATION 00x0 EXISTING CONTOUR ----00---- NUMBER OF BEDROOMS GARBAGE DISPOSAL UNIT NO BOTTOM OF TEST HOLE ELEV. - FINAL SPOT ELEVATION13 _no TOTAL ESTIMATED FLOWzd — < PROPOSED SOREPTIC DESIGN F S WEETSER ENGINEERING 235 GREAT WESTERN ROAD 508- P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 � ZLy F—s`LE 1" = au REVISED JOB NO. 10o LOCATION MAP REVISED SHEET /OF TOP OF FOUNDAITON ELEV. - 101_� --\ &A 4' CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4' PER FT. ELEv. _ ELEV. _ 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CONCRETE COVERS 4' SCHEDULE 40 PVC PIPI MIN. PITCH 1/8' PER FT. T ASBAFFLE ELEV. _ = '%' 6' SUM ELEV. _ DISTRIBUTION ELEV.= BOXY - (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 1500 GALLON IF MORE THAN ONE OUTLET SEPTIC TANK (TO BE PLACED ON FIRM BASE) 3/4' TO 1 1/2" - WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE CLEAN SAND DAM AND SEED 2" LAYER 0' 1/8' TO 1/2' j.. WASHED S ONE VENT NOT REQUIRED z 1 CU. FT. OF CONCRETE ' ( ANCHOR T_ " "� ' a 10 a ELEV. HIGH CAPACITY I M GATORS WITH TRENCH FORMATION ZE SOIL ABSORPTION WELL f ZONE SYSTEM (SAS) INDEX ADJUST_ USGS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _ 7 -1 - > DEP iH HORIZ TEXTURE COLOR MOTT. OTHER FINAL SPOT ELEVATION 00. FINAL CONTOUR TOTAL ESTIMATED FLOW � ( 110 GAL/13R./DAY R./DAY X '� FOR BR.) �3-719 GAL/DAY ! SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY44 :,' GAL UTILITY POLE i/ TOWN WATER SOIL CLASSIFICATION I i DESIGN PERCOLATION RATE < 5 IN. N. - ( � C/4 < toY CESSPOOL C.P.0'3E f oar; &A 4' CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4' PER FT. ELEv. _ ELEV. _ 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CONCRETE COVERS 4' SCHEDULE 40 PVC PIPI MIN. PITCH 1/8' PER FT. T ASBAFFLE ELEV. _ = '%' 6' SUM ELEV. _ DISTRIBUTION ELEV.= BOXY - (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED 1500 GALLON IF MORE THAN ONE OUTLET SEPTIC TANK (TO BE PLACED ON FIRM BASE) 3/4' TO 1 1/2" - WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE CLEAN SAND DAM AND SEED 2" LAYER 0' 1/8' TO 1/2' j.. WASHED S ONE VENT NOT REQUIRED z 1 CU. FT. OF CONCRETE ' ( ANCHOR T_ " "� ' a 10 a ELEV. HIGH CAPACITY I M GATORS WITH TRENCH FORMATION ZE SOIL ABSORPTION WELL f ZONE SYSTEM (SAS) INDEX ADJUST_ USGS PROBABLE WATER TABLE ELEV. OBSERVED WATER TABLE ( / / ) ELEV. _ BOTTOM OF TEST HOLE ELEV. _ 7 -1 - > DEP iH HORIZ TEXTURE COLOR MOTT. OTHER FINAL SPOT ELEVATION 00. FINAL CONTOUR TOTAL ESTIMATED FLOW � ( 110 GAL/13R./DAY R./DAY X '� FOR BR.) �3-719 GAL/DAY ! SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY44 :,' GAL UTILITY POLE ACTUAL SIZE OF SEPTIC TANK 1500 GAL• TOWN WATER SOIL CLASSIFICATION I CATCH BASIN �J DESIGN PERCOLATION RATE < 5 IN. N. - ( � C/4 < toY CESSPOOL C.P.0'3E f oar; LEACti1NC CAPACITY (AREA XRATE) i'Q''J J ' . ? vG-7u RESERVE LEACHING CAPACITY '1ST �GAL/DAY NOTES: ?�r7Z C'� CU P/L56 i2 G/f ^' \ REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 235 GREAT WESTERN ROAD 2 ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO W TH'N 6' OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WTHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 11,7 7/1 USED UNDER OR WITHIN 10 FT. OF -DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL 1 - - 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO JOB N0. OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-888-3"-7233 AT LEAST 72 HOURS REVISED PRIOR TO COMMENCING WORK ON SITE 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS 11u SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER S. PARCEL IS IN FLOOD ZONE / c �AS Z 9. LOT IS SHOWN ON ASSESSORS MAP PARCEL (o :< I✓ WATER ENCOUNTERED AT ' ELEV. DEPTH HORIZ TEXTURE COLOR MOTT. OTHER FINAL SPOT ELEVATION 00. FINAL CONTOUR TOTAL ESTIMATED FLOW � ( 110 GAL/13R./DAY R./DAY X '� FOR BR.) �3-719 GAL/DAY ! SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY44 :,' GAL UTILITY POLE ACTUAL SIZE OF SEPTIC TANK 1500 GAL• TOWN WATER SOIL CLASSIFICATION I CATCH BASIN �J DESIGN PERCOLATION RATE < 5 IN. N. - ( � EFFLUENT LOADING RATE --Q.74: CA CALn/DAY/S.f. ( v �✓ v toY CESSPOOL C.P.0'3E f oar; LEACti1NC CAPACITY (AREA XRATE) i'Q''J J ' . ? vG-7u RESERVE LEACHING CAPACITY '1ST �GAL/DAY NOTES: ?�r7Z C'� CU P/L56 i2 G/f ^' \ REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 235 GREAT WESTERN ROAD 2 ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO W TH'N 6' OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WTHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 11,7 7/1 USED UNDER OR WITHIN 10 FT. OF -DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL 1 - - 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH "'k WATER ENCOUNTERED AT � ELEV. a /'9' LEGEND: DESIGN CALCULATIONS-, EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS l� EXISTING CONTOUR ----DO---- GARBAGE DISPOSAL UNIT NO FINAL SPOT ELEVATION 00. FINAL CONTOUR TOTAL ESTIMATED FLOW � ( 110 GAL/13R./DAY R./DAY X '� FOR BR.) �3-719 GAL/DAY ! SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY44 :,' GAL UTILITY POLE ACTUAL SIZE OF SEPTIC TANK 1500 GAL• TOWN WATER SOIL CLASSIFICATION I CATCH BASIN �J DESIGN PERCOLATION RATE < 5 IN. N. GAS UNE EFFLUENT LOADING RATE --Q.74: CA CALn/DAY/S.f. CLEAN OUT � LEACHING, AREA 7 , ; SO. FT. CESSPOOL C.P.0'3E 4107x zy•cl_,,) 3S/ CGAL/DAY LEACti1NC CAPACITY (AREA XRATE) ' . ? vG-7u RESERVE LEACHING CAPACITY '1ST �GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MATERIAL SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF Y<ly.+svrt RULES AND ^' \ REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 235 GREAT WESTERN ROAD 2 ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO W TH'N 6' OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WTHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF -DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. - - 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO JOB N0. OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE' AT 1-888-3"-7233 AT LEAST 72 HOURS REVISED PRIOR TO COMMENCING WORK ON SITE 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. G S. PARCEL IS IN FLOOD ZONE / c �AS Z 9. LOT IS SHOWN ON ASSESSORS MAP PARCEL (o Du,tis ,Vt APPROVED: BOARD OF HEALTH No. 619 DATE AGENT PR0P0SED SEPTIC DESIGN FOR • /! � � - _ r'� �fi;JISG i- p/1i�.i' I�� y PROJECT LOCATION (Y t SWEETSER ENGINEERING ^' \ 235 GREAT WESTERN ROAD r- 508— P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 DATE \ REVISED q / �y / JOB N0. LOCATION MAP =11 REVISED SHEET / OF