Loading...
HomeMy WebLinkAboutApp# 12-A122Front Elevation - 1/411 _ GN-� Right Elevation - 1/4" = 1' co W) W) LO c� co co 0 LO Rear Elevation - 1/4" = 1' Left Elevation - 1/411 = 1' z DATE OF FINAL O F ISSUE W 0 10/17/12 Lu Q Q DATE PRINTED = 10/17/2012 SCALE Lu UNLESS z OTHERWISE Q L' NOTED w co � w co O 0 1/4 - 1' co o m� w W d z Q 5U 0 E:#::j # LOCUS MAP ACCESS COVERS MUST BE WITHIN 6' OF FINISH GRADE FIRST 2' TO / BE LEVEL GAS 9' MINIMUM. INVERT ELEVATIONS: 97.3 DESIGN CRITERIA: 3' MAXIMUM COVER INVERT AT BUILDING: 98.5 DESIGN FLOW: MIN 2' OF PEASTONE INVERT IN SEPTIC TANK: 98.0 3 BEDROOMS AT 110 G.P.O. PER OR FILTER FABRIC INVERT OUT SEPTIC TANK: 97.75 BEDROOM EQUALS 330 G.P.D. 3/4' - 1 1/2' DIA. INVERT IN DIST. BOX: 97.57 GAL. DOUBLE WASHED STONE INVERT OUT DIST. BOX: 97.4 VO GARBAGE GRINDER 3 OUTLET 2-500 GAL LEACHING CHAM8ERS D -BOX W/4' STONE AROUND. 12.8'w x 25'1 x 2'd 1500 GAL SEPTIC TANK 6" CRUSHED STONE OR COMPACTED BASE PRf /� /Yr - I / F ' Al/17- T/1 C, -AI C / -_97.6 i 7 / 3. 6/ / .s'peD J' J 1103.7 J ' 4 / ' i 20 -- W4TER EASEMENT GENERAL NOTES: /. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET, SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL HOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF W1TH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE /S MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. I -888 -DIG -SAFE AND THE LOCAL WATER DEPT, FOR LOCATION OF UNDERGROUND UTILITIES. 8. SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION OF THE SYSTEM TO ALLOW FOR SCHEDULING OF THE CONSTRUCTION INSPECTIONS. 9. ALL UNSUITABLE MATERIAL IA. B 6 SILT LOAM! ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE 5. 10. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS. SPECIAL PERMITS, VARIANCES ETC. FOR THIS PROJECT. /I. IT SHALL REMAIN THE CLIENT'S RESPONSIBILITY TO HAVE THE PROPOSED BUILDING FOUNDATION DESIGNED TO ACCOUNT FOR THE EXISTING GRADE AND SOIL CONDITIONS AT THE LOCATION OF THE PROPOSED BUILDING. 17 79.6 C2 MEOI UM SAND NO WATER 85.6 21'- NO WATER 75.6 DATE: MAY 9. 2012 TEST BY: SWEE7SER ENGINEERING WITNESSED BY: AMY VONHONE PERC RATE: ( 2 MIN/INCH dZ, t J Z. E)EIrAARET Jk pC a 44.1/a 9 _ _ q NT 18� W u j= EASEM Io /a� z`^" 2 7 20i� ^ �7 ESE ID oLn ----1,o--- S I T E PLAN O F L .4 N D ,J CB/DH`FQ'D > \ C�l N\ 1` 40 KETdCOMSET7 CI RCLE. MAP 125. PARCEL 47 u YARMOUTHPOR T MA x 3 PREPARED FOR L EGENDM R & M R S RONALD S T E/ H E R 0 - CB CONCRETE BOUND -W- WATER LINE 5 0 9 R E X BL VD E" L M 1--! U R S T. l L 6 0/ 2E> �d O HYDRANT SCALE: 1 " - 20 OCTOBER 1 0 20 12 -G- GAS LINE - OHW-- OVER HEAD WIRES STEPHEN A . HAAS S2 .01 00-W a LIGHT POST _ E N G I N E E R I N G, I N C T50� --f- UNDERGROUND ELECTRIC LINE _T_ UNDERGROUND TELEPHONE LINE i `+ 923 R out a 6A - CTV- UNDERGROUND CABLEVISION LINE // ��� I ���� Yo r mo u t h p o r t MA 0 2 6 7 6 +40.4 SPOT ELEVATION ( 508 ) 362-8 1 32 _..-40 ....... EXISTING CONTOUR V1 ( 608 ) 367-1 69 1m� r [TO] PROPOSED CONTOUR 0 10 20 40 JOB NO: 12-131 INVERT IN LEACH CHAMBER: 97.3 REQUIRED: SEPTICADJUSTED BOTTOM OF LEACH CHAMBER: 95.3 X 330 G.P..D.D. - 660 GAL. GROUND WATER: 89.5 SEPTIC TANK PROVIDED: 1500 GAL. MIN. OBSERVED GROUND WATER: 87.7 BOTTOM OF TEST HOLE n3: 85.6 SOIL ABSORPTION SYSTEM REQUIRED: ADJUSTED INDEX WELL SOW 252. ZONE 8 DESIGN PERC RATE C 5 MIN/INCH - GROUNDWATER. EL •89.5 L_ APRIL 2012 READING -47.1 '. ADJ-1.8' SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF OBSERVED 330 GPD / 0.74 GPD/SF - 446 S.F. REOUIRED - GROUNDWATER. EL -87.7 ?ROVIDED: 2-500 GAL LEACHING CHAMBERS V/4' STONE AROUND, A-471 S.F. 471 S.F. x 0.74 - 348 G.P.D. SOIL TEST PIT DA TA INDICATES V_ INDICATES PERCOLATION OBSERVED TEST GROUNDWATER TP #I TP #2 HORIZON TEXTURE COLOR HORIZON TEXTURE COLOR 0. 97.7 0" 99.7 A LOAMY IOYR A LOAMY IOYR SAND 4/1 SAND 4/1 8' ------------------- 97.0 7' ------------------- 99.1 8 LOAMY IOYR B LOAMY IDYR SAND 7/6 SAND 7/6 28' ------------------- 95.4 29' ------------------- 97.3 C / LOAMY IOYR C I LOAMY IOYR SAND 7/4 SAND 7/4 64" -------------------- 92.4 64' -------------------- 94.4 C2 SILT IOYR C2 SILT IOYR LOAM 7/1 LOAM 7/1 120-"- -_---------------- 87.7 120" ------------------- 89.7 C3 COARSE C3 COARSE l4'J SAND SAND - 87.7 "C4 SILT LOAM 204 ' 80.7 192 " 83.7 TP s3 TP 04 0. HORIZON TEXTURE COLOR 100.6 0' HORIZON TEXTURE COLOR 96.6 A LOAMY IOYR A LOAMY IOYR SAND 4/1 SAND 4/1 6' ------------------- f00.1 7' ------------ •--•--- 96.0 D U LOAMY IOYR p LOAMY U IOYR SAND 7/6 SAND 7/6 28' ------------------- 98.3 33' ------------ -----93.9 C If SILT IOYR C l SILT IOYR LOAM 7/4 LOAM 7/4 120 ................... 90.6 C2 COARSE SAND GENERAL NOTES: /. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET, SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL HOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF W1TH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 PVC OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE /S MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. I -888 -DIG -SAFE AND THE LOCAL WATER DEPT, FOR LOCATION OF UNDERGROUND UTILITIES. 8. SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION OF THE SYSTEM TO ALLOW FOR SCHEDULING OF THE CONSTRUCTION INSPECTIONS. 9. ALL UNSUITABLE MATERIAL IA. B 6 SILT LOAM! ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE OF 5' AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE 5. 10. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS. SPECIAL PERMITS, VARIANCES ETC. FOR THIS PROJECT. /I. IT SHALL REMAIN THE CLIENT'S RESPONSIBILITY TO HAVE THE PROPOSED BUILDING FOUNDATION DESIGNED TO ACCOUNT FOR THE EXISTING GRADE AND SOIL CONDITIONS AT THE LOCATION OF THE PROPOSED BUILDING. 17 79.6 C2 MEOI UM SAND NO WATER 85.6 21'- NO WATER 75.6 DATE: MAY 9. 2012 TEST BY: SWEE7SER ENGINEERING WITNESSED BY: AMY VONHONE PERC RATE: ( 2 MIN/INCH dZ, t J Z. E)EIrAARET Jk pC a 44.1/a 9 _ _ q NT 18� W u j= EASEM Io /a� z`^" 2 7 20i� ^ �7 ESE ID oLn ----1,o--- S I T E PLAN O F L .4 N D ,J CB/DH`FQ'D > \ C�l N\ 1` 40 KETdCOMSET7 CI RCLE. MAP 125. PARCEL 47 u YARMOUTHPOR T MA x 3 PREPARED FOR L EGENDM R & M R S RONALD S T E/ H E R 0 - CB CONCRETE BOUND -W- WATER LINE 5 0 9 R E X BL VD E" L M 1--! U R S T. l L 6 0/ 2E> �d O HYDRANT SCALE: 1 " - 20 OCTOBER 1 0 20 12 -G- GAS LINE - OHW-- OVER HEAD WIRES STEPHEN A . HAAS S2 .01 00-W a LIGHT POST _ E N G I N E E R I N G, I N C T50� --f- UNDERGROUND ELECTRIC LINE _T_ UNDERGROUND TELEPHONE LINE i `+ 923 R out a 6A - CTV- UNDERGROUND CABLEVISION LINE // ��� I ���� Yo r mo u t h p o r t MA 0 2 6 7 6 +40.4 SPOT ELEVATION ( 508 ) 362-8 1 32 _..-40 ....... EXISTING CONTOUR V1 ( 608 ) 367-1 69 1m� r [TO] PROPOSED CONTOUR 0 10 20 40 JOB NO: 12-131