HomeMy WebLinkAboutApp# 3739I
NORTH ELEVATION -PROPOSED
SOUTH ELEVATION PROPOSED
EAST ELEVATION PROPOSED (BACK)
----
_J
NOTES:
1. FOUNDATION TO BE CONCRETE FILLED CONSTRUCTION TUBES TO GROUND
LEVEL. AX6 -PRESSURE -TREATED POSTSABOVEGROUND.
2. SIDING TO BE WHITE CEDER SHINGLES, LEFT .NATURAL TO MATCH
EXISTING SIDING.
3. ROOF MATERIAL TOME ASPHALT SHINGLES TO MATCH EXISTING ROOF.
4. DOORANDWINDOW TRIM TO BE 2 1/4" ACTUAL, PAINTED WHITE TO
MATCH EXISTING TRIM.
S. GUTTERS TO BE WHITE ALUMINUM TO MATCH EXISTING GUTTERS.
6. ALL .DECK LUMBER'TO BE PRESSURE TREATED.
* RAILS TO BE 2 X -4
* RAIL POSTS TO BE -4 X 4
*RAIL CAP TO BE 2 X 6
7. LATTICE TO BE PRESSURE TREATED 4 X 8:X 1/2 PANELS CUT TO SIZE.
S. LATTICE FRAMES TO BE 1 X 4 PRESSURE TREATED LUMBER.
165.MAYFLOWER TERRACE
SOUTH YARMOUTH, MA
SCALE 1/411= 1'
GEORGE & LUCIA DEGIACOMO
b�lo�ty
APPROVED
YARMOUTH COMMITTEE
OKHRD
JUNE 9, 1992
I
i
�?3�r��