HomeMy WebLinkAboutApp# 3-A040I
YJ�91 MOUTH
TOWN �i._ERK
RECENED
3 - d.0 �{O
CONTINUOUS TODG€.VENT,.__..
c:. CONT\tiuoUS 0.\AGE VENC
,ASP\i F;Li-ROS)F S`a\NG\:ES.
—��C SH�NG�ES
I
Y .RMOUTH
TO\A,I i CLERK
il3 MAR 27 All 9: 30
RECEIVED
MR�MRS. c�ra� �\Zavzt�t�v
_. LOT 14 Y1iEpsA\ST COVL C1 r Ll.
YARMovTN PoR� , M�
SCALE:' APPROVED BY:
i/4.= 1'0' , DRAWN BY
DATE:
DRAWING NUMBER
3—A 04o
5 White Summersweet
Lawn
1 Red Sunset Maple
Lawn
i
i 1 Hatfield Yew
r 3/4" Native Stone Driveway
I
r I 1 Heller Japanese holly
1 Th eadleof joponese maple
Steps
5 War rave Pink Cranesbill
Lawn a �„us '�
GO
4 1 C T-
' " '911^•
r r
m m4
Lawn
no `'
E 14 Pink Winter Heath
1 Chaste tree
I
i I
Lawn
5 Compact Burning Bush
Tree & Shrub List
Ouontity Scientific Name Common Name Size
1 Acer polmotum 'Dissectum Viridis' Threadleof japcnese maple 3-4'
1 Acer rubrum 'Red Sunset' Red Sunset Maple 1.5-2"–Cal
6 Azalea mocrontha Single Pink Azalea 3–Gal
2 Azalea mucranulatum Cornell Pink Corneli Pink Azalea 3–Gal
3 Marie's Doublefile Viburnum
1 Buddleic davidii Pink Delight Pink Butterflybush 3–Gal
2 Buddleia nanho Blue Dwarf Blue Butterflybush 3–Gal
6 Buxus sempervirens Common Boxwood 24-30"
4 Clethra alnifolio Ruby Spice Dark Pink Summersweet 3–Gal
Lawn 5 Clethra alnifolio peniculato White Summersweet 3–Gal
3 Cornus kousa Kouso Dogwood 6-7'
\f 10 Cupressocyparis leylandei Leyland Cypress 15 -Gal
0
14 Erica Med. Pink Pink Winter Heath 1–Gel
1 Arrowwood Lawn 5 Euonymus clatus compcctus Compact Burning Bush 3 -Gal
3 Hibiscus syriacus 'Pu!cherimus' Pink Rose–of–Sharon 3-4'
i Pink Butterfi bush\ I 2 Hydrangea macrophylla Nikko Blue Double Blue Hydrangea 24-30"
,-% y
I- 3 Hydrangea macrophylla Pia Dwarf Pink Hydrangea 3–Gal
1 Ilex crenato 'Heller? Heller Japanese holly 3–Gal >
4 Compact inkberry 4 Ilex globro compacta Compact Inkberry 3–Gal
1 Prunus serrulate Kwanzon Kwanzon Cherry 2-2.5"–Cc!
Q1 4 Rhododendron Olga Mezitt Peach PJM Rhododendron 24-30"
N 36 Rosa The Fairy Pink Fairy Rose 2–Gal
2 Spiraeo Anthony Waterer Dark Pink Spirea 3–Gat
2 Burkwood viburnum 1 Syringa vulgaris purpureo Common Liioc 7–Gal
1 Texus media hatfieldii Hatfield Yew 3-4'
I ,
7 Thujo occidentalis techney Techney Arborvitae 4-5'
' 2 Viburnum burkwoodii Burkwood viburnum 3–Gal
5 Bath's Pink Dianthus
4 Dark Pink Summersweet 1 Viburnum dentatum Arrowwood 3–Gal
- 3 Viburnum plicatum tomentosum Mariesii Marie's Doublefile Viburnum 3–Gal
1 Vtex agnus–castus Chaste tree 7–Gal
3 Dwarf Pink Hydrangea
' Lawn
> :
: Perennials List
6 Commol Do'erood
9 Walker's Cotmint Wood Steps ( Quantity Scientific Name _ Common Name Size
1 5 Dianthus Bcth's Pink Bath's Pink Dianthus 1–Gal
- 5 Geranium endressi Wcrgrave Pink Wargrove Pink Cranesbill 1–Gal
6 Single Pink Azalea / , 9 Nepeto mussini Walker's Low Walker's Catmint , 1–Gal
2 Dwarf Blue Butterflybush
2 Double Blue Hydrangea I
2 Dark Pink Spires :
1 Common Lilac 2 Cornell "Pink Azalea
: I
AC
- I
t
- 4 Peach PJM Rhododendron / atone aieps y
` I _—//
! Lawn 36 Pink Fairy _Rose 10 Leyland Cypress
Lawn
3 Pink Rose–of–Sharon _
1 Kwanzon Cherry 2'-3' fieldstone or Roman Pisa block retaining wall
- -- — -' 7 Ts+rhnav ArhArvtnP I
i. .
f
l:
The Pitruzzello Residence
I
14' Pheasant Cove Circle, Yarmouthport
By Philip ,L. Cheney 508-394-1373
Scale: 1 /8" 1 ' —0" 2/26/2003,
T
SYSTEM PROFILE BIO FOR
MINIMUM .75' OF COVER OVER PRECAST BIOCLERE
FLOOR=23.5±' (NOPTO SCALE) ACCESS COVER (WATERTIGHT) TO
TOP FNDN = 22.5'/23.5±' BIOCLERE
1 18" ABOVE GRADE WITHIN 6" OF FIN. GRADE
SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ACCESS COVER TO FIN. GRADE 27 SLOPE REQUIRED OVER SYSTEM
DESIGN FLOW: 3_ BEDROOMS (11 0 GPD) = 330 GPD 22 E RECYCLE LINE AG�Q RUN PIPE LEVEL 2' DOUBLE WASHED 1/8' - 1/2' PEASTONE
USE A 330 GPD DESIGN FLOW INTO SEPTIC TANK/FOR FIRST 2' 21.65'
SEPTIC TANK: 330 GPD (2 ) 660 18.5' qy �� 0
PROPOSED 1500 y�� 0 21.15'
1500 21.17'
USE A GALLON SEPTIC TANK GALLON SEPTIC 21,3¢' s� 96'®
18.0' TANK (H- 1-0 17 .75' 6 SUMP o0 0
LEACHING: FACTORY WATERPROOF GAS
SIDES: 2(54 + 12) 2 (.37) = 97.6 SEE DETAIL BAFFLE
19.15'
MIN
BOTTOM: 54 x 12 (.37) = 239.8 ( 2 % SLOPE) �6" CRUSHED STONE OR MECHANICAL ( SLOPE) 3/4' TO 1 1/2' DOUBLE WASHED STONE
TOTAL: 911 S. F. 337.4 GPD 4' COMPACTION. (15.221 [2]) PRECAST MOUNTING PAD 4' (15.212)
DEPTH OF FLOW - (_% SLOPE)
USE 6 FLO DIFFUSORS WITH 3' STONE AT ENDS, TEE SIZES
4' STONE AT SIDES, AND 12" UNDER INLET DEPTH = 10"
(54' L. x 12' W. x 2' DEEP) OUTLET DEPTH = 14 MOTTLING Q 15.15'
2913 MAR 27 All 9. 31
RECEIVED
py I
e
Asq'VT i
00
� oRc
<F
i
m
t
0
LOCUS
4TH
ocy
LOCATION MAP NO SCALE
_ - 15.17'
FOUNDATION- 18' ST 3' BIOCLERE -- 5' PUMP 7' D' BOX 4' LEACHING ASSESSORS MAP 149 PARCEL 33
CHAMBER FACILITY
BOARD OF HEALTH ZONING DISTRICT: R 40
MA
YARD SETBACKS:
APPROVED DATE FRONT = 30'
ELEV. ELEV. OBS. WATER EL. 3.98'
2 SIDE = 20'
0„ Q 16.65' O" Q 16.21' REAR = 20'
D T
LEGEND
F_l0_0_,O__1
PROPOSED SPOT ELEVATION
100x0
EXISTING SPOT ELEVATION
100
PROPOSED CONTOUR
- 100 -
EXISTING CONTOUR
O
PROP. BIOCLERE UNIT
T
SYSTEM PROFILE BIO FOR
MINIMUM .75' OF COVER OVER PRECAST BIOCLERE
FLOOR=23.5±' (NOPTO SCALE) ACCESS COVER (WATERTIGHT) TO
TOP FNDN = 22.5'/23.5±' BIOCLERE
1 18" ABOVE GRADE WITHIN 6" OF FIN. GRADE
SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ACCESS COVER TO FIN. GRADE 27 SLOPE REQUIRED OVER SYSTEM
DESIGN FLOW: 3_ BEDROOMS (11 0 GPD) = 330 GPD 22 E RECYCLE LINE AG�Q RUN PIPE LEVEL 2' DOUBLE WASHED 1/8' - 1/2' PEASTONE
USE A 330 GPD DESIGN FLOW INTO SEPTIC TANK/FOR FIRST 2' 21.65'
SEPTIC TANK: 330 GPD (2 ) 660 18.5' qy �� 0
PROPOSED 1500 y�� 0 21.15'
1500 21.17'
USE A GALLON SEPTIC TANK GALLON SEPTIC 21,3¢' s� 96'®
18.0' TANK (H- 1-0 17 .75' 6 SUMP o0 0
LEACHING: FACTORY WATERPROOF GAS
SIDES: 2(54 + 12) 2 (.37) = 97.6 SEE DETAIL BAFFLE
19.15'
MIN
BOTTOM: 54 x 12 (.37) = 239.8 ( 2 % SLOPE) �6" CRUSHED STONE OR MECHANICAL ( SLOPE) 3/4' TO 1 1/2' DOUBLE WASHED STONE
TOTAL: 911 S. F. 337.4 GPD 4' COMPACTION. (15.221 [2]) PRECAST MOUNTING PAD 4' (15.212)
DEPTH OF FLOW - (_% SLOPE)
USE 6 FLO DIFFUSORS WITH 3' STONE AT ENDS, TEE SIZES
4' STONE AT SIDES, AND 12" UNDER INLET DEPTH = 10"
(54' L. x 12' W. x 2' DEEP) OUTLET DEPTH = 14 MOTTLING Q 15.15'
2913 MAR 27 All 9. 31
RECEIVED
py I
e
Asq'VT i
00
� oRc
<F
i
m
t
0
LOCUS
4TH
ocy
LOCATION MAP NO SCALE
_ - 15.17'
FOUNDATION- 18' ST 3' BIOCLERE -- 5' PUMP 7' D' BOX 4' LEACHING ASSESSORS MAP 149 PARCEL 33
CHAMBER FACILITY
BOARD OF HEALTH ZONING DISTRICT: R 40
MA
YARD SETBACKS:
APPROVED DATE FRONT = 30'
ELEV. ELEV. OBS. WATER EL. 3.98'
2 SIDE = 20'
0„ Q 16.65' O" Q 16.21' REAR = 20'
D T
FILL
12"
Ap
Ap
40"
FINE SL
17"
10YR 3/2
AD
46"
ALARM AND CONTROL PANEL
Bhs
SL
MOTTLE
56"
SL
10YR 5
TO BE INSTALLED INSIDE
10YR 6/4
64"
C1
9"
1018 3/2
MOTTLE S
2.5Y 7/
BUILDING. ALARM TO BE ON [NV. IN 16.6'
2.5Y 6/4
IOYR 5
128'
5.54
C2
obs water
SEPARATE CIRCUIT FROM PUMP
SILT LOAM
2" PRESSURE PIPE TO D'BOX
1GLEY5/10Y
166
w
2.37
1000 GAL. H-10 S/
VERY F SAND
228"
-2.7
800 GAL.+
SLOPE TO DRAIN BACK TO PC
FINE SL
ALARM ON
FLOAT SWITCH
RESERVE
WEEP HOLE
15"
2.5Y 5/6
15.40
SETTINGS+ PUMP ON
HECK VALVE
4' WORKING RANGE
8'
ZOELLER 'WASTEMATE'
4'
SUBMERSIBLE MODEL M282 1/2 HP PUMP
18"
15.15'
PUMP OFF
4'
SYSTEM (OR EQUAL) -.
MOTTLES 30%
C
0000 ooao
NOTE: PROPOSED CONTOURS ARE TO BLEND WITH
NEIGHBOR'S PROPERTY AT REAR
(SEE ACCOMPANYING PLAN
1oYR 5/8
SILTY LOAM
000000 0000
6" CRUSHED STONE OR
COMPACTION --��
BY PHILIP L. CHENEY, DATED 3/21/01)
68"
2.5Y 5/2
PE
PUMP CHAMBER
PERC ,X
BANDS OF SILTY
CLAY LOAM AT
(NOT TO SCALE)
.
PERC:
120" - 158"
FACTORY WATERPROOF
SWELi-SOAK
OVERNIGHT SWELL
PROP. 40 MIL LINER, BASE ELEV. 10.0', TOP AT ELEVATION 16'
PERC: 9:35/INCH
(OVERLAP AND GLUE TOGETHER AS REQUIRED)
BENCHMARK - CTR. OF
152"
obs water
3.98
CATCH BASIN
+t5.5B
p0'
PIPE DRAINS TO WETLAND
EL. = 15.11 (NGVD)
120
/'
(SALT MARSH) (INVERT AT OF
PROVIDE HAYBALES AROUND CATCH BASIN AS
SHOWN TO PREVENT SILTATION. ENGINEER TO
CERTIFY LOCATION AND SUBMIT CERTIFICATION TO }15.48
`
'
N
10" CMP - 10.3')
FAN F'OUSING
1-1/2' SCHD 40 PVC
RECYCLE LINE°"
LOCKABLE
ACCESS COVER
-2'
164"
A
PLAN REF. - 229/31
FLOOD ZONE: C
HOUSE COVERAGE 2017 SF/15050 SF = 13.4%
2r EL. 14.38' TEST HOLE LOGS
11
ENGINEER: RICK JUDD, RS
FILL
12"
Ap
Ap
40"
FINE SL
17"
10YR 3/2
46"
Bw
Bhs
SL
MOTTLE
56"
LFS
10YR 5
29"
10YR 6/4
64"
C1
56"
RC
SILTY LOAM
MOTTLE S
2.5Y 7/
68"
2.5Y 6/4
IOYR 5
128'
5.54
C2
obs water
SILT LOAM
2.5 Y 6/1
1GLEY5/10Y
166
2.37
C3
VERY F SAND
228"
-2.7
30% PERC: 8:10/INCH WITNESS: BRUCE MURPHY, RS
2
/a 20z DATE:_ 713 & 14, 2000 /
CLASS III SOILS
TOWN, CATCH BASIN MUST BE CLEANE A -
CONCLUSION OF CONSTRUCTION AND PRIOR TO +15.74
OCCUPANCY PERMIT ISSUANCE BY THE TOWN TH6
'15.45 PROP. 1500 GAL. SEPTIC TANK FILTER
TH21 3'-0 3/8' S Y 4' SCHD 40 PVC Q FAILED ELEV. ELEV.
5' REMOVAL OF UNSUITABLE SOIL REQUIRED AROUND PERIMETER 3' OUTLET COUPLING 17 37
OF LEACHING FACILITY DOWN TO SUITABLE SOIL LAYER REPLACE d •�'-- 0" 0"
6.27
17 WITH CLEAN MED. SAND. ENGINEER TO INSPECT AND CERTIFY
1 TH 0 1' � REMOVAL.
2
SCHD 40 -�-
LOCUS =LOT 42 PVC COUPLING J
15050±SF
+17 9 5'-7 1/2'
\PROVIDE APPROX. 67' OF 40 MIL4'-5 1/2'
TH LINER AT 5' OFF LEACH FACILITY AT SUMP
6+ LIMIT REMOVAL, AREA SHOWN.
-{-16.02 � 32.6' AT TOP AT EL. 21.T, BOTTOM AT EL.
a 15.85 17.7'. OVERLAP ONTO CONCRETE
i GAR SLAB 0 WALL. 4,
- - ELEV. 20.0' 22.4 r y : ; �-CONCRETE
y 1 •97 DR1NE +17.60 0 EXIST. CONC BASE PAD
pPRO RET. WALL, EL PROP. 3 SR 22 y 20.5' CRUSHED STONE
DWELLING
TOP FNDN. = 22.5 1' T
N p •' NOTE: IF PRIMARY SYSTEM SHOULD FAIL, REMOVE SYSTEM IN
C ' 0 ITS ENTIRETY, REMOVE ALL CONTAMINATED SOILS AND REPLACE P 31/Y
+17.46 SOILS AND SYSTEM IN KIND. ENGINEER TO INSPECT AND CERTIFYLL 4' 0'
�/ o B6.6 REMOVAL AND REPLACEMENT. MODEL 16/12-350
C 7 TH 1 ABUT.
>•"'4 +17. 4
21.7' LEACH
81 +I7.99 FIELD A 241 DUCHAINE BLVD.
W 1 BIOCLERE DETAIL FROM: �F P.O. BEDFORD MA 02745
0.5' 18 +,, . ^ (508) 998-7577 FAX (506) 996-7177
O. PROP. NT
p °0 16, 1
16.78 7- v! -
PERC: > 30 MIN/INCH PERC: > 30 MIN/INCH
\ .75 CONC. RET. WALL
AT EL. 21.7'
\ 1 TITLE 5 VARIANCE REQUIRED: -
17 37 129 00 +16.77 STEEL LIDS 15.248 NO RESERVE" Q ELEV. Q ELEV.
DUE TO VARIABILITY OF SOILS IN AREA, FOUNDATION TH4 STONE RET. WALLS AT GRADE TOWN OF YARMOUTH VARIANCE REQUIRED: 0" 15.83' 0" 15.45'
DRAINS MAY BE REQUIRED (SEE DETAIL) 3.7: PROPOSED LEACHING FACILITY TO BE 55' TO SUBSURFACE DRAIN (45'
W EL. = 20.5' VARIANCE REQUESTED) A Ap
\ 17.53 F DY FI SANDY
LOAMLOAM
\ ELBOW OL 6" t OYR 3/2 6" 10YR 3/2
_ \ +17.19 '
FNDN 1/Z UO 10
DEPTH
Cl Cl
i-1/2" RECYCLE LME 15,16
® 8"t 4D ta" 14,28'
+17.59 (SCHD. 80 INTERIOR PIPING) MOTTLES, 25% SILTY LOAM
6 MIL POLY VINYL AND MASTIC 1500 GAL PRECAST sEPnc TANK MOTTLES 20%
2.5r 7/s 25Y 6/2 SILTY I OAM
10YR s/s 2.5Y 6/4 7.SYR 8/6
EL 21.T 110 ON INSIDE OF RETAINING WALL PERC ® PERC < 8 MIN/NCH
SEPTIC TANK DETAIL
60^ PERC 2.5Y 6/4
REQUIRED INSPECTIONS AND CERTIFICATIONS Li PERC < 7 MIN/INCH 60"
q PROP. STONE BLOCK
1. ENGINEER SHALL INSPECT WHEN REQUIRED EXCAVATION IS
°COMPLETE. a- RET. WALL EL. 20.5'
#3 BARS O 12" HORIZONTAL, 2. ENGINEER SHALL STAKE FOOTING PRIOR TO POURING
° CONTINUOUS AT CORNERS 3. ENGINEER SHALL INSPECT FOOTING AND REBAR PRIOR TO POURING O EL. 18.E 150" abs water 3.3'
OF WALL Ld -
S' 7 ` 4. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS BEEN PROPERLY CD
° EL. 16.7' DEPOSITED d EL. 22.5' C2 130" obs water 4.6'
5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS AND F - VERY
o PUMP MECHANISMS AFTER INSTALLATION I /
2^ #5 BARS 12" O.C. FOR VERTICAL I 30 ±
CL. •.'' REINFORCEMENT ENGINEER SHALL CERTIFY TO YARMOUTH HEALTH DEPARTMENT THAT /
THE RETAINING WALLS, LANDSCAPE TIE KNEE WALLS, FINAL GRADING, I r PROP. FNDN. 162" FINE SANDS 136"
4 SEPTIC SYSTEM AND PUMP MECHANISMS HAVE BEEN INSTALLED I -
46" IN SUBSTANTIAL COMPLIANCE NTH THE APPROVED PLAN EL. 16.5
#4 BARS, 12" CENTERS
12 3„
13.7' BASE £L.
3" CL.
NATURAL SOIL
CONC, RET. WALL (NTS)
00-24,'? (SEPTIC SYSTEM)
SECTION B -B
1 " _' 10'
NOTES:_
1. DATUM IS NGVD
2. MUNICIPAL WATER IS AVAILABLE
3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT.
4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10
5. PIPE JOINTS TO BE MADE WATERTIGHT.
6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS.
ENVIRONMENTAL CODE TITLE V.
7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE
USED FOR LOT LINE STAKING.
8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC.
9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT
INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED
FROM BOARD OF HEALTH,
10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR
TO COMMENCEMENT OF WORK,
11. ELECTRICAL PERMIT REQUIRED
TITLE 5 SITE PLAN
OF
14 PHEASANT COVE CIRCLE
IN THE TOWN OF:
YARMOUTH (PORT)
PREPARED FOR: CARL PITRUZZELLO
20 0 20 40 60
SCALE: 1" = 20' DATE: NOVEMBER 7, 2000
REV. 1/27/01
REV. 1/31/01
REV. 3/14/01 (3BR/BIOCLERE)
REV. 8/2/01 (HSE)
REV. 9/10/01 (NOTE)
REV. 9/10/02 (C.BASIN NOTE)
te OF MREV. 2/11/03 (HSE, GRADING)
o� ARNP �y�\ /`kxlH Of
� H• p�
8 JALA
y .28348 N' c
r
ly
A S. DATE
J X7/4!
off 508-362-4541
, fax 508 362-9880
down cape engineering, inc,
CIVIL ENGINEERS
LAND SURVEYORS
939 main st, yormouth, ma 02675
3.0,
FILL
32"
A
Ap
40"
F - SL
17"
E
46"
LFS
Bhs
Bhs
56"
LFS
15.12'
BS
Bs
64"
FS
32"
Cl
SILT LOAM
Cl
20"
SILTY LOAM
16.78 7- v! -
PERC: > 30 MIN/INCH PERC: > 30 MIN/INCH
\ .75 CONC. RET. WALL
AT EL. 21.7'
\ 1 TITLE 5 VARIANCE REQUIRED: -
17 37 129 00 +16.77 STEEL LIDS 15.248 NO RESERVE" Q ELEV. Q ELEV.
DUE TO VARIABILITY OF SOILS IN AREA, FOUNDATION TH4 STONE RET. WALLS AT GRADE TOWN OF YARMOUTH VARIANCE REQUIRED: 0" 15.83' 0" 15.45'
DRAINS MAY BE REQUIRED (SEE DETAIL) 3.7: PROPOSED LEACHING FACILITY TO BE 55' TO SUBSURFACE DRAIN (45'
W EL. = 20.5' VARIANCE REQUESTED) A Ap
\ 17.53 F DY FI SANDY
LOAMLOAM
\ ELBOW OL 6" t OYR 3/2 6" 10YR 3/2
_ \ +17.19 '
FNDN 1/Z UO 10
DEPTH
Cl Cl
i-1/2" RECYCLE LME 15,16
® 8"t 4D ta" 14,28'
+17.59 (SCHD. 80 INTERIOR PIPING) MOTTLES, 25% SILTY LOAM
6 MIL POLY VINYL AND MASTIC 1500 GAL PRECAST sEPnc TANK MOTTLES 20%
2.5r 7/s 25Y 6/2 SILTY I OAM
10YR s/s 2.5Y 6/4 7.SYR 8/6
EL 21.T 110 ON INSIDE OF RETAINING WALL PERC ® PERC < 8 MIN/NCH
SEPTIC TANK DETAIL
60^ PERC 2.5Y 6/4
REQUIRED INSPECTIONS AND CERTIFICATIONS Li PERC < 7 MIN/INCH 60"
q PROP. STONE BLOCK
1. ENGINEER SHALL INSPECT WHEN REQUIRED EXCAVATION IS
°COMPLETE. a- RET. WALL EL. 20.5'
#3 BARS O 12" HORIZONTAL, 2. ENGINEER SHALL STAKE FOOTING PRIOR TO POURING
° CONTINUOUS AT CORNERS 3. ENGINEER SHALL INSPECT FOOTING AND REBAR PRIOR TO POURING O EL. 18.E 150" abs water 3.3'
OF WALL Ld -
S' 7 ` 4. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS BEEN PROPERLY CD
° EL. 16.7' DEPOSITED d EL. 22.5' C2 130" obs water 4.6'
5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS AND F - VERY
o PUMP MECHANISMS AFTER INSTALLATION I /
2^ #5 BARS 12" O.C. FOR VERTICAL I 30 ±
CL. •.'' REINFORCEMENT ENGINEER SHALL CERTIFY TO YARMOUTH HEALTH DEPARTMENT THAT /
THE RETAINING WALLS, LANDSCAPE TIE KNEE WALLS, FINAL GRADING, I r PROP. FNDN. 162" FINE SANDS 136"
4 SEPTIC SYSTEM AND PUMP MECHANISMS HAVE BEEN INSTALLED I -
46" IN SUBSTANTIAL COMPLIANCE NTH THE APPROVED PLAN EL. 16.5
#4 BARS, 12" CENTERS
12 3„
13.7' BASE £L.
3" CL.
NATURAL SOIL
CONC, RET. WALL (NTS)
00-24,'? (SEPTIC SYSTEM)
SECTION B -B
1 " _' 10'
NOTES:_
1. DATUM IS NGVD
2. MUNICIPAL WATER IS AVAILABLE
3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT.
4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10
5. PIPE JOINTS TO BE MADE WATERTIGHT.
6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS.
ENVIRONMENTAL CODE TITLE V.
7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE
USED FOR LOT LINE STAKING.
8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC.
9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT
INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED
FROM BOARD OF HEALTH,
10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR
TO COMMENCEMENT OF WORK,
11. ELECTRICAL PERMIT REQUIRED
TITLE 5 SITE PLAN
OF
14 PHEASANT COVE CIRCLE
IN THE TOWN OF:
YARMOUTH (PORT)
PREPARED FOR: CARL PITRUZZELLO
20 0 20 40 60
SCALE: 1" = 20' DATE: NOVEMBER 7, 2000
REV. 1/27/01
REV. 1/31/01
REV. 3/14/01 (3BR/BIOCLERE)
REV. 8/2/01 (HSE)
REV. 9/10/01 (NOTE)
REV. 9/10/02 (C.BASIN NOTE)
te OF MREV. 2/11/03 (HSE, GRADING)
o� ARNP �y�\ /`kxlH Of
� H• p�
8 JALA
y .28348 N' c
r
ly
A S. DATE
J X7/4!
off 508-362-4541
, fax 508 362-9880
down cape engineering, inc,
CIVIL ENGINEERS
LAND SURVEYORS
939 main st, yormouth, ma 02675
3.0,
FILL
12"
-
Ap
FINE SL
17"
10YR 3/4
Bhs
LFS
27"
10YR 6/6
15.12'
BS
LFS
32"
10YR 6/4
Cl
SILTY LOAM
78"
obs water
2.5 Y 6/1
120"
16.78 7- v! -
PERC: > 30 MIN/INCH PERC: > 30 MIN/INCH
\ .75 CONC. RET. WALL
AT EL. 21.7'
\ 1 TITLE 5 VARIANCE REQUIRED: -
17 37 129 00 +16.77 STEEL LIDS 15.248 NO RESERVE" Q ELEV. Q ELEV.
DUE TO VARIABILITY OF SOILS IN AREA, FOUNDATION TH4 STONE RET. WALLS AT GRADE TOWN OF YARMOUTH VARIANCE REQUIRED: 0" 15.83' 0" 15.45'
DRAINS MAY BE REQUIRED (SEE DETAIL) 3.7: PROPOSED LEACHING FACILITY TO BE 55' TO SUBSURFACE DRAIN (45'
W EL. = 20.5' VARIANCE REQUESTED) A Ap
\ 17.53 F DY FI SANDY
LOAMLOAM
\ ELBOW OL 6" t OYR 3/2 6" 10YR 3/2
_ \ +17.19 '
FNDN 1/Z UO 10
DEPTH
Cl Cl
i-1/2" RECYCLE LME 15,16
® 8"t 4D ta" 14,28'
+17.59 (SCHD. 80 INTERIOR PIPING) MOTTLES, 25% SILTY LOAM
6 MIL POLY VINYL AND MASTIC 1500 GAL PRECAST sEPnc TANK MOTTLES 20%
2.5r 7/s 25Y 6/2 SILTY I OAM
10YR s/s 2.5Y 6/4 7.SYR 8/6
EL 21.T 110 ON INSIDE OF RETAINING WALL PERC ® PERC < 8 MIN/NCH
SEPTIC TANK DETAIL
60^ PERC 2.5Y 6/4
REQUIRED INSPECTIONS AND CERTIFICATIONS Li PERC < 7 MIN/INCH 60"
q PROP. STONE BLOCK
1. ENGINEER SHALL INSPECT WHEN REQUIRED EXCAVATION IS
°COMPLETE. a- RET. WALL EL. 20.5'
#3 BARS O 12" HORIZONTAL, 2. ENGINEER SHALL STAKE FOOTING PRIOR TO POURING
° CONTINUOUS AT CORNERS 3. ENGINEER SHALL INSPECT FOOTING AND REBAR PRIOR TO POURING O EL. 18.E 150" abs water 3.3'
OF WALL Ld -
S' 7 ` 4. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS BEEN PROPERLY CD
° EL. 16.7' DEPOSITED d EL. 22.5' C2 130" obs water 4.6'
5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS AND F - VERY
o PUMP MECHANISMS AFTER INSTALLATION I /
2^ #5 BARS 12" O.C. FOR VERTICAL I 30 ±
CL. •.'' REINFORCEMENT ENGINEER SHALL CERTIFY TO YARMOUTH HEALTH DEPARTMENT THAT /
THE RETAINING WALLS, LANDSCAPE TIE KNEE WALLS, FINAL GRADING, I r PROP. FNDN. 162" FINE SANDS 136"
4 SEPTIC SYSTEM AND PUMP MECHANISMS HAVE BEEN INSTALLED I -
46" IN SUBSTANTIAL COMPLIANCE NTH THE APPROVED PLAN EL. 16.5
#4 BARS, 12" CENTERS
12 3„
13.7' BASE £L.
3" CL.
NATURAL SOIL
CONC, RET. WALL (NTS)
00-24,'? (SEPTIC SYSTEM)
SECTION B -B
1 " _' 10'
NOTES:_
1. DATUM IS NGVD
2. MUNICIPAL WATER IS AVAILABLE
3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT.
4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- 10
5. PIPE JOINTS TO BE MADE WATERTIGHT.
6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS.
ENVIRONMENTAL CODE TITLE V.
7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE
USED FOR LOT LINE STAKING.
8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC.
9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT
INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED
FROM BOARD OF HEALTH,
10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR
TO COMMENCEMENT OF WORK,
11. ELECTRICAL PERMIT REQUIRED
TITLE 5 SITE PLAN
OF
14 PHEASANT COVE CIRCLE
IN THE TOWN OF:
YARMOUTH (PORT)
PREPARED FOR: CARL PITRUZZELLO
20 0 20 40 60
SCALE: 1" = 20' DATE: NOVEMBER 7, 2000
REV. 1/27/01
REV. 1/31/01
REV. 3/14/01 (3BR/BIOCLERE)
REV. 8/2/01 (HSE)
REV. 9/10/01 (NOTE)
REV. 9/10/02 (C.BASIN NOTE)
te OF MREV. 2/11/03 (HSE, GRADING)
o� ARNP �y�\ /`kxlH Of
� H• p�
8 JALA
y .28348 N' c
r
ly
A S. DATE
J X7/4!
off 508-362-4541
, fax 508 362-9880
down cape engineering, inc,
CIVIL ENGINEERS
LAND SURVEYORS
939 main st, yormouth, ma 02675
3.0,