Loading...
App# 5384entity, 1 1 10 4 7 2 2 1 2 21 6 4 1 2 4 Plant List Scientific Name Acer rubrum 'October Glory' Altheo syriacus 'Blue Ardens' Cupressocyparis leylandei Forsythia Intermedio Spring Glory Hydrangea macrophyllo Nikko Blue Ilex crenota 'Compocto' flex crenato 'Helferi' Ilex mes. Blue Prince flex mes. Blue Princess Juniperus chinensis Sea Green' Myrica pennsylvonica Pinus thunbergiana Prunus serrulato Kwanzan Rhododendron Cunningham's White Spiraeo Anthony Waterer Common Name October Glory Maple Blue Rose—of—Sharon Leyland Cypress Forsythia Double Blue Hydrangea Dwarf Japanese holly Heller Japanese holly Mole Blue Holly Blue Princess Holly Sea Green Juniper Bayberry Japanese Black Pine Kwanzan Cherry Cunningham White Rhododendron Dark Pink Spired ze -2.5"—Cal -Got $—cal -Gal t—W -Gal -Got -4' -4- -Gal -Gal -5- 5-2" Cal t-30" -Gal NORTH n 3asler ;le, Yarmouthport B-394-1373 '.3/2001 �'� APPROVED t Y D� 1 E v, GENERAL NOTES: 9" MINIMUM COVER INVERT ELEVATIONS DESIGN CRITERIA; ,_• ACCESS COVERS MUST BE WITHIN 36' MAXIMUM COVER INVERT AT BUILDING: 20.4 DESIGN FLOW: 1. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION 6 OF FINISH GRADE ' OF THE SEWAGE DISPOSAL SYSTEM ONLY. 22.0 4' PERF PIPE MIN. 2" OF INVERT IN SEPTIC TANK: 20.25 / t 3 BEDROOMS AT 110 G. P. D. PER 7 FIRST 2' TO PEASTONf INVERT OUT SEPTIC TANK: 20.0 BEDROOM EOUALS 330 G.P.D. r . 1\`I 22.0 MIN BE LEVEL ?. VERTICAL DATUM 1S NGVD, FOR BENCH MARKS 2z INVERT IN DIST, BOX: 19.95 SET. SEE SITE PLAN. 21.0 MIN NO GARBAGE GRINDER J IAM PIP 20.5 INVERT OUT DIST. BOX: 19.78 4' REINFORCED CONCRETE INVERT IN LEACH FIELD: 19,67 3. ALL CONSTRUCTION METHODS AND MATERIALS AND 20.4 GAS 20.0 19.78 0 " n.a.a.a.m g• MAINTENANCE OF THE SEPTIC SYSTEM SHALL 20'25 enFFLE 19.95 ° 19.67 RETAINING WALL t INVERT LEACH FIELD:. 19.5 -SEPTIC TANX.REOUIRfDr-PPPPOVE 19.5 BOTTOM OF LEACH FIELD: 19.0 330 G.P.D. X 2002 - 660 GAL CONFORM TO MASS. 'D.E.P. TITLE 5 AND LOCAL 3 OUTLET 28'x 35' LEACH FIELD 19.0 SEPTIC TANK PROVIDED: /500 GAL MiMdAM+���Nn GROUNDWATER FROM MOTTLING: 15.0 GK4§R� D -BOX fe.s MIN �Il�l BOARD OF HEALTH REGULATIONS. 1500 GAL 3/4' - ! I/?" DIA. 8 MIL POLY OBSERVED GROUNDWATER: 7.5 SOIL ABSORPTION SYSTEM REQUIRED: SEPTIC TANK 6' CRUSHED STONE OR DOUBLE WASHED STONE VAPOR BARRIER DESIGN PERC RATE ?O MIN/INCH 4. ALL SEPTIC SYSTEM COMPONENTS LOCATE UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER COMPACTED BASE THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- SOIL TEXTURAL CLASS p /- EFFLUENT LOADING RATE - 0.34 GPD/SF I R Or I L E : NOT TO SCALE 330 GPD / 0.34 GPD/SF - 971 S.F. REOUI RED STANDING H-20 WHEEL LOADS. PROVIDED: 28'x 35' LEACH FIELD. A•960 S.F. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 OR 980 S.F. x 0.34 - 333 GPD APPROVED EQUAL. t 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE AND WATERTIGHT. D -BOX SHALL SOIL TES T P I T DA TA a BE WATER TESTED TO CHECK FOR LEVEL WHEN THERE i IAID ICATES_� INDICATES IS MORE THAN ONE OUTLET.' PERCOLATION OBSERVED TEST - GROUNDWATER ° 7. BEFORE CONSTRUCTION CALL -DIG-SAFE E { 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. '• FOR LOCATION OF UNDERGROUND UTILITIES. TP TP HORIZON TEXTURE COLOR 15.9 0' HORIZON TEXTURUR E COLOR 15.5 B. SEPTIC SYSTEM INSTALLER SHALL NOTIFY THE DESIGN ENGINEER TWO DAYS PRIOR TO CONSTRUCTION A LOAMY SAND J/2 312 A LOAMY IOYR SAND 3/q OF THE SYSTEM TO ALLOW FOR SCHEDULING OF THE 12 "' "' " ' "" - 14.9 9 14.8 i CONSTRUCTION INSPECTIONS. B LOAMY IOYR REQUIRED INSPECTIONS: 27' 1. AFTER P,EOUIREO EXCAVATION IS COMPLETED: SAND .... ..... 5/6 13.3 ............. ENGINEER SHALL INSPECT SOIL AND STAKE FOOTING. CI SILT IOYR CI SILT IOYR LOAM 7/l LOAM 6/6 2. ENGINEER SHALL INSPECT FOOTING AND REBAR 1 PRIOR TO POURING OF WALL. 49' 11.8 52" 3. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS m 11 ? o K 77' y MEDIUM IOYR C2 r SANG 6/6 BEEN PLACED A'.S LEACH FIELD CGMDLfT£D. _ 9. ALL UNSUITABLE MATERIAL (A A B HORIZONS) " m 96' 7.5 ENCOUNTERED BELOW THE INVERT OF THE LEACHING c t FACILITY TO BE REMOVED FOR A DISTANCE OF S' v b AROUND AND REPLACED WITH SAND IN ACCORDANCE 1 /! r e SILT 616 IOYR WITH TITLE 5. ✓ NO WATER C3 LOAM 6/6 /56' 2.9 174' !.0 s ' DATE: JUNE 28. A JULY 8. 1999 10. N0 DETERMINATION HAS BEEN MADE AS 70 ! TEST BY: DONALD MONCEVICZ i COMPLIANCE WITH DEED RESTRICTIONS OR ZONING WITNESSED BY: BRUCE MURPHY REGULATIONS. IT SHALL REMAIN THE CLIENTS • E RESPONSIBILITY TO OBTAIN ALL PERMITS. SPECIAL __ _ PERC RATE: IS MIN/INCH PERMITS. VARIANCES ETC. FOR THIS PROJECT. N\ EXISTING PAID DRIVEWAY CB/DH FAO i ! EL -14.24 Q -. t - _ a `y !l. IT SHALL REMAIN THE CLIENT'S RESPONSIBILITY fa 72 126/p0 DM, TRENCH !0 TRENCH I1 DRAIN vlvE HORIZON TEXTURE COLOR 15.8 0' HORIZON TEXTURE COLOR 16,5 6 TO HAVE THE PROPOSED BUILDING FOUNDATION ,✓ f � ti urcr+exs/N 0, t e.1 xrM•r2.>v A SANDY IOYR Q SANDY IOYR DESIGNED TO ACCOUNT FOR THE EXISTING GRADE AND SOIL CONDITIONS AT THE LOCATION OF THE 5 " ' PROPOSED BUILDING. i O. i. Q LOAM 3/3 LOAM 3/3 75.7 m 6' 15.3 6' ... ....... 16.0 • a s B LOAM 5/6SILT R B LOAM 5SILT o6R.. 12: ROOF RUNOFF IS TO BE DIRECTED TO DRYWELLS. F m ro !2- 14.8 12' ....... ....... .... 15.5 `S C I SILT IOYR C I SILT IOYR LOT SO rs s m LOAM 7/2 LOAM T/? �. I5.250-* S.F. moo\ � � \ � N a I ,._s p; BLUE C2 CLAY C8/6H F ....... ...... .. 156' 2.8 132- 5.5 r rn o �'o EL-u.dJ / 7 LOAMY VAR l-ANCES RE 1 RED: 0 192 SAND 0.2 144 4:5 TOWN OF YARMOUTH SUBSURFACE SEWAGE DISPOSAL REGULA IONS _ REGULATION 3.7. DISTANCES AND LOCATION OF DISPOSAL FACILITIES m ro o z DATE: SEPTEMBER 28 A 29. 2000 TEST BY: STEPHEN HAAS ` 100' IS REQUIRED BETWEEN THE SAS AND A WETLAND. 90 IS PROPOSED TO A DRAIN ro m A? N 4 fs WITNESSED BY: AMY VONHONE A BRUCE MURPHY I PIPE THAT DRAINS TO A MARSH. A 10' VARIANCE 7S REO IRED. 56' IS PROPOSED ` z+ ISo�f�L +N. o PERC RATE: C 2 MIN/INCH BETWEEN THE RESERVE AREA AND THE DRAIN PIPE. A 44' VARIANCE IS REOUESTED. o SEP" cVElf o MOTTLES (7.5YR6/8) FOUND AT APPROXIMATELY P SHOULD THE PRIMARY SYSTEM FAIL. IT SHALL BE REMOVED ALONG WITH ALL CONTAMINATED12' 1N +10 AND 18' IN ♦ll. USE MAXIMUM - v c ras 9.go% gpPO DRAINAGE sraLE GROUNDWATER ELEVATION OF 15.0 1N THE AREA SOIL AND REPLACED 1N THE SAME LOCATION. \ IK y• , S s.` N OF THE SAS. PERC IOA AT 60• - 16.3 MIN/INCH s - PERC 108 AT 60" - 9.7 MIN/1N. PERC lIC AT c81DH 0 56' - 10.7 MIN/lN.. P£RCS DONE AFTER A FOUR HOUR SATURATION PERIOD AND A 12 HOUR SWELLING PERIOD AS PER TITLE 5. (15.105:(6)) CH/DHFND fie, ._SG 5 120 j J0`JI ---- }fee \` TDP of ALL i S / TE PLAN OF LAND 17. i EL-17,55ceiDNFND :+ 22 78 PHEASANT COVE C/ROLE. MAP /49. PARCEL 4 / Y,4 RMOU THPOR T . "A PREPARED FOR -/- P. O. BOX 270 YARMOUTHPORT, MA 02675 F LOCUS SCALE MARCH .2 . 200 / -T-C EAGLE SURVEYING, INC ���� ��f�`� ✓ 317 I1moo!/ _ - 923 Route 6A 3 / Zy ° � �` ` Yarmouthport MA. 02675 ( 508) 362-8132 ���r/ r; 508) 432-5333 LOCUS MAP o l0 20 40 JOB N0: 00-034 FIELD:CFW/EEK CALL: SAN/CFW CHECK: CFWDRN: SAN E