Loading...
HomeMy WebLinkAboutApp# 4922TOP' OF FOUNDATION HORIZ 20 FT. MINIMUM FROM CELLAR COLOR MOTT. I1V.0 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE ( 110 GAL/BR./DAY X _ SR.) GAL/DAY SOIL TEST LOCATION 09 pFy, 0—% 0/A TOWN WATER —W CLEAN SAND CATCH BASIN(! j DESIGN PERCOLATION RATE Ste_ MIN./IN. GAS UNE --Q' CONCR� COVER Lo A,» foVrd/, you 4• SCHEDULE 40 PVC PIPE LOAM AND SEED ANROVEDq P%n NOTES: X48 n MIN. PITCH 1/8• PER FT. 20 U.YER OF REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. REUSED 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO f4F Y 1STONE s r.../ �2�u� roA,aSr WASHED !v', VENT LOCATION MAP i 4• CAST IRON PIPE C C✓r.J!r 7b'7,0 NOT REQUIRED Co :'r-C"i (OR EQUAL MINIMUM _ PITCH 1 /4 PER FT. 1 CU. FT. OF \ CONCRETE FLOW LINE f0 j j w ANCHOR ELEV. - (10-0 U 10- MIN. V - Io�zS . b I 10- • Loy; ELEV.: 07 5 LCL GAF S ELEV - l7 6.9 8• SU ELLV, Gc- 1 ELEv a w .. - - B DISTRIBUTION y7 LI ID OUTLET ..'' BOX �/0E 10 4 HIGH CAPACITY INNLLATORS PATH 570NE 4 14 INCHES (Tb BE PLACED ON FIR IA BASE) TO BE WATER TESTED 1 t X 4�ylo/ TRENCH FORMA?lON 19 INCH 5 1500 GALLON IF MORE THAN ONE OUTLET 1 9 IN�CH S INCHIS SEPTIC TANK (TO BE PLACED ON FIRM BASE) SOIL ABSORPTION >, WELL 3/40 Ta 1 1/2• SYSTEM (SAS) INDEX WASHED STONE ADJUST SEWAGE DISPOSAL SYSTEM PROFILE oesER� � � (w"jR ) �: NOT TO SCALE ��'` BOTTOM OF TEST N:X-- ELEV. - SOIL TEST DATE OF SOIL TEST SOIL TEST DONE BY S1E.R ENGINEERING WITNESSED BY S M Vic POW Y OBSERVATION HOLE 1 ELEV.- f wZ OBSERVATION HOLE 2 ELEV.—If)-77 PERCOLATION RATE Z MIN./INCH PERCOLATION RATE i Z MIN./INCH AT /op INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER tet. r /vc P FINAL CONTOUR ( 110 GAL/BR./DAY X _ SR.) GAL/DAY SOIL TEST LOCATION 09 7=1 REQUIRED SEPTIC TANK CAPACITY GAL 0—% 0/A TOWN WATER —W SOIL CLASSIFICATION CATCH BASIN(! j DESIGN PERCOLATION RATE Ste_ MIN./IN. GAS UNE --Q' UFLUE14T LOADING RATE 0.74 GAL/DAY/S.F. �cr SQ FT. Lo A,» foVrd/, you !�V ANROVEDq P%n NOTES: X48 n fr. r REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. REUSED 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO ley, s r.../ �2�u� roA,aSr JFS—HEET OF / LOCATION MAP i I°-fZb C C✓r.J!r 7b'7,0 Co :'r-C"i ^/ WATER ENCOUNTERED AT 46� ELEV.- 9�'7 DEPTH HORIZ TEXTURE COLOR T,, r2 oc C,L—m tet. r /vc P FINAL CONTOUR DEPTH HORIZ TEXTURE COLOR MOTT. OTHER FINAL SPOT ELEVATION TOTAL ESTIMATED FLOW + ,4,1r FINAL CONTOUR ( 110 GAL/BR./DAY X _ SR.) GAL/DAY SOIL TEST LOCATION 09 7=1 REQUIRED SEPTIC TANK CAPACITY GAL UTILITY POLE -0- ACTUAL SIZE OF SEPTIC TANK GAL TOWN WATER —W SOIL CLASSIFICATION CATCH BASIN(! j DESIGN PERCOLATION RATE Ste_ MIN./IN. GAS UNE --Q' UFLUE14T LOADING RATE 0.74 GAL/DAY/S.F. �cr SQ FT. Lo A,» foVrd/, you RESERVE LEACHING CAPACITY GAL/DAY ANROVEDq P%n NOTES: YA'111'137H C" '".I'.TT_= I✓� 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE S AND THE TOWN OF Y,; 2r^d✓Ti� RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. REUSED 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO ley, s r.../ �2�u� roA,aSr JFS—HEET OF / LOCATION MAP i PO� WATER ENCOUNTERED AT ELEV. - 9� % /c O" LEGEND: DESIGN CALCULATIONS EXISTING SPOT ELEVATION 00.0 4L NUMBER OF BEDROOMS EXISTING CONTOUR ----00---- GARBAGE DISPOSAL UNIT NO FINAL SPOT ELEVATION TOTAL ESTIMATED FLOW + ,4,1r FINAL CONTOUR ( 110 GAL/BR./DAY X _ SR.) GAL/DAY SOIL TEST LOCATION 09 7=1 REQUIRED SEPTIC TANK CAPACITY GAL UTILITY POLE -0- ACTUAL SIZE OF SEPTIC TANK GAL TOWN WATER —W SOIL CLASSIFICATION CATCH BASIN(! j DESIGN PERCOLATION RATE Ste_ MIN./IN. GAS UNE --Q' UFLUE14T LOADING RATE 0.74 GAL/DAY/S.F. �cr SQ FT. CLEAN T C.P. 0 CESSPOOL ,LACHI61�G 57rZx %0 - c} LEACHINGrCAPACITY.5AREA X RATE) GAL/DAY you RESERVE LEACHING CAPACITY GAL/DAY ANROVEDq P%n NOTES: YA'111'137H C" '".I'.TT_= I✓� 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE S AND THE TOWN OF Y,; 2r^d✓Ti� RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. REUSED 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO W1T1N1 6. OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WLTHSTANDWG H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS N-20 LOADING SHALL BE USED UNDER OR W7HN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH - J - _ DEEDED OR ZONING REGULATIONS. OWI40 / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL 'DIG -SAFE• AT 1-865-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. 8. PARCEL IS IN FLOOD ZONE 9. LOT IS SHOWN ON ASSESSORS MAP ! AS PARCEL - APPROVED: BOARD OF HEALTH DATE AGENT /r fy 5c77'j--< I •. s PROPOSED SEPTIC DESIGN FOR PROJECT LOCATION / o T /-T SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 508— 13 398-3922 SOUTH DENNIS, MASS. 02660 REUSED JOB NO. y z 3S _ D O JFS—HEET OF / LOCATION MAP i PO�