Loading...
HomeMy WebLinkAboutEngineered Plan - 2015ASSESSORS MAP: # PARCEL: v� FLOOD ZONE: - ,l REFERENCE: ,eeD._.._,L" LOCATION MAP TEST HOLE LOGS SOIL EVALUATOR:. WITNESS : / VOG,/ DATE: /ltd , 4�1j Z OI5r PERCOLAT I 0 RATE: -c< Z IA//IA IA TH-I 4044U V C-3 E z STH -2 0 SEPTIC SYSTEM DESIGN FLOW ESTIMATE 11.3 BEDROOMS AT ��� GAL/DAY/BEDROOM -55t:0-AL/DAY SEPTIC TANK 5��GAL/DAY x 2 DAYS - GAL USE GALLON SEPTIC TANK 1) 'I'he installation shall coi;)i:,� Mili Title V and Town of� p01� 13oard of I lealth Itegulations. 2) The installer shall verify the location of utilities, sewer inverts and septic components prior to installation and setting brise elevations. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per loot. The first two feet out of (lie d -box to (lie ieaching shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over 1110 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner sliall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sand per Title V specs. 10) System components to be 10 feet from water line. Sewer !;nes crossing the water line shall be sleeved with 4 inch SCI 140 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service line. The line is to be sleeved as aforementioned and maintained in place. 11) if a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12) The installer is to take caution in excavation around the gas line if succi exists. 13) "line installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling prior to the installation. 14) This plan is representative only that a system can fit on a property meeting Title V requirements. SOIL ABSORPTION SYSTEM - 1 l 1, cl 7 �,a ss < x'Z �. �� DAVID <' S 1 DE AREA: o y O i / '-j t, : �j '2 MASON � BOTTOM AREA: X l2 )C Z 7 i S No. tossAa SEPTIC SYSTEM SECTION ``"n. DATE t E DO GAL SEPTIC TANK Yarmouth Health D,3pvrt2nen- t PPS Date HEALTH AGENT �... 2�'x 128✓ LIAZ, WON 7,Z5