Loading...
HomeMy WebLinkAboutEngineered Plan - Rev. 1998 with notations from 11-30-15joIS e0 ROUTE 28 LOCUS 4 LOCATION MAP LOT AREA 13,914 ± S.F. ASSESSORS MAP. 12 PARCEL: F29-1 FLOOD ZONE: A9 EL 10) 14'r ` ELEV. OF FINISHED PROPOSED GRADE = 134 GRADE OVER LINER - 12.5 (TOP OF LINER - 12.0) k 5* / �- 5' ro-r1 f 10-r1 EXISTING EXISTING GRADE �TOP OF PEASTONZ ELEV.- 12D GRADE 0 MIL POLI' LINER PROPOSED LEACHING AREA 4 0 MIL GAURD (OR EQUAL) (136' s 4' +/-) TOP OF LINER ELEV.- 120 SEPTIC SYSTEM LINER AND FILL DETAIL WINCHESTER AVENUE BENCHMARK AT CONCRETE BOUND ,10 4 ELEVATION - 10.53 �0. 1 1- 2 SDGg OF PAVEMENT®r- ®� W.00 --m A Xu. 56' - 49.96- 1 1 r Oil 2. /w1� 4/xv 8w J` 5 INFILTRATORS (STANDARD CHAMBERS) WITH f OF STONS AROUND SIDES AND X AT ENDS (3725' s If s 7' DEEP) TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: _, 1--14-98 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 so SYSTEM. FILL ZLXV. 0/A 80RIZOX t4• 7.8 LOA1lY SAND 5" IOYR 2/2 A HORIZON LOAMY SAND IOYR 2/1 B HORIZON 30" 85 LOAMY SAND B HORIZON 12' IOYR 4/8 LOAMY SAND g SEPTIC TANK 36" IOYR 5/8 6.0 30" STONE UNDER ) 5.7 E------ 37.25 C HORIZON C IffoRlzoN 2� 6 S6 D 2.5Y 8FINE %AND 88" / 1.7 108" USES GROUNDWATER ADJUSTMENT. WELL. MIW-29, ZONA: A. ADJUSTMENT: 1.8' SEPTIC ` x, YST EM DESIGN NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NGVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 11. ALL UNSUITABLE SOIL (A & B HORIZONS, APPROX. 36" DEEP) WITHIN 5 OF LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. 12. THE PROPOSED SEPTIC SYSTEM HAS BEEN DESIGNED TO MAXIMUM FEASIBLE COMPLIANCE. THE SYSTEM REQUIRES THE APPROVAL OF THE FOLLOWING VARIANCE: 1. SECTION 15.212. LEACH AREA TO BE P ABOVE GROUNDWATER. 13. EXISTING CESS POOL(S) ARE TO BE PUMPED AND FILLED WITH SAND OR REMOVED. 14. SEPTIC TANK AND PUMP CHAMBER ARE TO BE WATER PROOFED BY cc MANUFACTURER WITH IPANEX CONCRETE ADDITIVE OR CONSEAL FLOW ESTIMATE: (3 BEDROOM DESIGN, MINIMUM) A 6" EZ WRAP IS ALSO REQUIRED AROUND SEAM OF BOTH TANKS. G 2 g D�oY '- _ � BEDROOMS AT 110 CAL/DAY/BEDROOM = 330 CAL/DAY 15. AN ELECTRIC PERMIT IS REQUIRED FOR THE INSTALLATION OF PUMP J_ INSTALLATION PRIOR TO CONSTRUCTION. DWELLING 1st fLR- 121 SEPTIC TANK to 30. GAL/DAY x 2 DAYS - 660 GAL EXISTING USE 1500 GALLON SEPTIC TANK INVERT - 9.3 t0' 9 LEACHING ARIA: MIX 1 71 _ TH-1 TH-2 USE 5 INFILTRATORS (STANDARD CHAMBERS) , \ WITH 4' OF NE AROUND SIDES AND X AT ENDS CP ; \ (3725' s 1P x DEEP) \ SIDE AREA 4825)2 x 7/12 = 56 (.74) - 41 GAL/DAY \ \ BOTTOd! AREi1 -3°x'25' s 11 = 410_ SF , (74) - 303 GAL/DAY PC BED ` --9 CAPACITY -m 344 CAL/DAY ` SEPTISYST EM SECT ION INSPECTION SCHEDULE INSPECTION / 1: SIL AND ITO NSTALLATION OF CLEAOf N MEDIUM AND. INSPECTION 2: ENGINEER TO INSPECT INSTALLATION Of POLY LINER INSPECTION 3: ENGINEER TO INSPECT' ON 07 SEPTIC SYSTEM COMPONENTS AND I PUMP HOLE 11.69 SYSTEM. INSFECTION ¢ 4. . ENGI.lsER TO INSPECT FINAL GRADING. � - HEAVY TOP TANK i N \ -10 COVERS WITHIN 1r OF i' FINISHED GRADS COVRA OVER PUMP TO Ba 12a WITHIN 8" OF FINISH GRADE. ' •, �' 0 FIRST $LOOR r PCV (PRassu" LINA) 8.5 8.15 DRAlIV r PEASTONE 3/4' - 1 1/2" �- WASHED STONE /- ELEV.= 12.0 - \ ATB'R ;ELEV. 8.25 ELEV. HOLE 11.69 D -BOX nsz = 10.9 JOHN Z. DEMAREST JR, P.L.S. $.0 1500 GAL ELEV. 3.65 ELEV. ELEV CHECK (6" OF ELEV. H BLEv. • g SEPTIC TANK PUMP CHAMBER (1000 GAL STONE UNDER ) E------ 37.25 10 (6" OF STONE UNDER OR SEPTIC TANK) WITH MYERS SRM -4 PUMP. PUMP ALARM (TIZ AT 1)/Lsr) PACKAGE To BE INSTALLED 1f.4g 5 INFILTRATORS STANDARD CHAMBERS) 9.3 AfECHANICALLY COMPACTED) WITH 4' OF STONE AROUND SIDES AND . / ELEV. TEE SIZES: IN DWELLING POWERED BY A CIRCUIT SEPARATE ELEV. 3' AT ENDS (3725 z f1 s 7' DEEP) � • ... • •'., •' EXISTING (EXISTING) I)ILET: 6" UP, f3" DOWN FROM THS PUMP POWER, (DtsrAXca BsrWaax � *TLET: 6" UP, 14" DOWN OX/Off SWITCH TO BSC). SWITCH 6.9 (GAS BAFFLE AT OUTLET TEE) (DISTANCE BMVZXN ON T no 1211 ADJUSTED GROUNDWATER ELEP= �j ADJUS9'MENT) PROPOSED POLY LINER -� \ (SES DETAIL) KEY. EXISTING CONTOUR: PROPOSED CONTOUR: ...... • • • • . • • • . • ........... "' EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 TEST HOLE. + UTILITY POLE. -0- FENCE LINE: HYDRANT: �- RETAINING WALL: TREE. DM JA 97-160 (D27F8) ! AXD ALARM 0 (USING 1/2 OF USGS GROUNDW 11 BOUYAfftY FORCE =10,15 LBS BOUTAXCT FORCE - 8,325 LBS / YEIGBr Of SEPTIC TANK - 11,480 LBS WEIGHT Of TANK (HEAVY rOP) - 9,275 LBS / YEIGBT OF SOIL OVER TANS =2900 LBS WEIGHT Of SOIL OVER TANK - 2000 LBS s - PROVED BY: DATE. 12 DEJfA"ST-MCLELLAN ENGINEERING 43. 0(y 12 24 SCHOOL STREET PA. BOX 463 ' WEST DSXNIS, MASSACHUsaTT3 02870 PHONE & TAX : (508) 398-7710 SITE AND SEWAGE PLAN LOCATION 24 WINCHESTER AVENUE WEST YARMOUTH, HA PREPARED FOR: ROBERT FARREN SCALE. 1" = 20' DATE. 2/16/98 REFERENCE: PLAN BOOK 103 PAGE 15 REVISED: 11-23-98 NOV 2 41998 HEALTH DEPT. C n� VU ,O C cam. ,� k�.36471 a Dew= A Na 3 THOMAS McLELLAN, P.E. JOHN Z. DEMAREST JR, P.L.S. SITE AND SEWAGE PLAN LOCATION 24 WINCHESTER AVENUE WEST YARMOUTH, HA PREPARED FOR: ROBERT FARREN SCALE. 1" = 20' DATE. 2/16/98 REFERENCE: PLAN BOOK 103 PAGE 15 REVISED: 11-23-98 NOV 2 41998 HEALTH DEPT. C n� VU ,O C