Loading...
HomeMy WebLinkAboutEngineered Plans - 2015ASSESSORS MAP: PARCEL: FLOOD ZONE : REFERENCE:rr- p PL_')`C-**4l _ . /S/. LOCATION MAP 0 TEST HOLE LOGS SOIL EVALUATOR 16 WITNESS: f' V DATE: 045 - PERCOLATION RATE: Z.J(! JA TH-I TH-2 I IV) -K I I I SEPTIC SYSTEM DESIGN FLOW ESTIMATE PEDROOMS AT GAL/DAY/BEDROOM -� GAL/DAY SEPTIC TANK ZZC)GAL/DAY x 2 DAYS - GAL USE ','";M GALLON SEPTIC TANK SOIL ABSORPTION SYSTEM S`! DEQ AREA BOTTOM AREA: Z 1:z- x / , 8Z 0/7 f-23745 SEPTIC SYSTEM SECTION fi'�af �bU•b�i w - INT- r� I) The installation shall eomp� iviih Title V and Town ofl 10Q 1 Board of I lealth Regulations. I 2) The installer shall verify the location of utilities, sewer inverts and septic components prior to installation and setting base elevations. 3) All gravity septic piping to be 4 inch Sch 40 PVC at 1/8" per foot. The first two feet out of the d -box to the ieuching shall be level. 4) This plan is not to be utilized for property line determination nor any other purpose other than the proposed system installation. 5) All septic components must meet Title V specifications. 6) Parking shall not be constructed over fI10 septic components. 7) The property is bounded by property corners and property lines. 8) The property owner shall review design considerations to approve of total design flow and number of bedrooms to be considered for design. Receipt of payment for the plan and installation based on the plan shall be deemed approval of the design flow by the owner. 9) The existing leaching or cesspools shall be pumped and filled with material per Title V abandonment procedures. Those within the proposed SAS shall be removed along with contaminated soil and replaced with clean sant] per Title V specs. 10) System components to be 10 feet from water line. Sewer !fines crossing the water line shall be sleeved with 4 inch SCSI 40 PVC with ends grouted if applicable. The proposed SAS is being installed below the water service line. The line is to be sleeved as aforementioned and maintained in place. 11) If a garbage grinder exists it is to be removed and is the responsibility of the owner to ensure such. 12)The installer is to take caution in excavation around the gas line if such exists. 13) The installer shall verify the location, quantity and elevation of the sewer lines exiting the dwelling" rior to the installation. 14) This plan is representative only that a system can fit on a property meeting Title V requirements. OF DAVID MASON m NO. 1066 0 �y FQ/STEPS (DA,o x �'�- rte_ wfurr7" 10 C041 1- 1--? IGAL q6,5lo - ... t SEPTIC TANK Yarmouth Health Depwn•tmernt �IT OVD UCa i atnae Bate DATE HEALTH AGENT 9,35