HomeMy WebLinkAboutEngineer Certification Letter�
I
EAS su�ey, Ine. Business: (508) 888-3619
l P.O. Box 1729 � c�tl: (sos) s2�-3600
� Sandwich, MA 02563
email: eas.survey@yahoo.com
December 10, Zo 1 s RECE�VED
Mr. Bruce Murphy `�A� � / �(���
Yarmouth Board of Health Director
Yarmouth Town Hall H�TM DEPT
1164 Route 28
South Yarmouth,MA 02664
;
RE: 18 Alison Lane, Septic Certification
�
Dear Bruce,
,
j I have inspected the installation of the leaching system at 18 Alison Road. The leaching
� area was installed by Bosetti Construction in substantial compliance with the design plan
of January 7, 2015 and revised September 9, 2015, and approved by the Yarmouth Board
of Health.
Inspection performed on 10/22/15
Inspection of 1,500 gallon H-10 septic tank& "D"box.
Inspection of 24 low profile "Quik-4"plastic units..
' If 1 can be of any furt P- " nce in this matter please contact me at 508-527-3600
i
� ��,yZN�FMqs�4
�o� DAVID ey,�
Sinc ely a �. �
HE ,JR. �
No. ��o /z /o /S
avid D. Flaherty, ,� � T��N
rAR�P Date
' Registered Sanitarian '
i
� � �
' EAS/15-0100
�
�
,
�
�
3