Loading...
HomeMy WebLinkAboutReview Checklist ' lZ-� i� Z�:��,� � TOWN OF YARMOUTH s� " SEWAGE PLAN REVIEW CHECKLIST � �������1 ��� Location: A.M.�_ Lot� Zone af Contribution: In y/Out Acreage ����� ', Commercial: Residential: �..�` Street: � �'� � Village: � Floor Plan: , j #Bedrooms: � '/ � Owner: // Insta.11er: S . Address: Phone: p Phone: � r Builder: Engineer: Address: Phone: � Phone: N/A YES NO 1.R uired#of co ies received 2. Date of soils exam and ercolation test not older than 2 ears 3. 4-5 ft of naturall occurrin ervious material, above water table L/ 4.Foundation 2 ft above high oint of road H.P.: Fnd: Var.: 5.Water line 10 ft from septic com onents Var.: ��/ 6.Benchmark indicated and shown-NGVD if near wetlands 7. S tic tank minimum 10 ft from foundation, deck Var.: 8.Leachin minimum 20 ft full, 15 ft crawl, 10 ft slab Var.: 9.Leaching minimum 1 UO ft from wetlands Var.: 10.I,eachin minimum 150 ft from drinking welU25 ft irrigation well Var.: - 11.Tank/leaching minimum 10 ft from ro erly line Var.: 12. S stem meets all other setback r uirements Var.: �, 13.Uses ad'ustment for maximum hi oundwater Var.: 14.Leaching set 4-5 ft above adj.water or bottom of test hole Var.: ��-- 15. System not in to or subsoil(A,B horizons)or 5'removal 16.Pro osed contours are suitable 17. S stem meets slo e r uirements-min. 1/8", 1/4" referred c_._� 18. S stem meets breakout r irements PVC liner: Wall: t�-� 19. S ec�ed tee sizes are ro er, gas baffle on outlet tee 20. Sewage is under 10,000 d for arcel , 21.No ba e dis osal - 22. S stem ad uatel sized for its intended use 23.Minimum 6"stone or com acted below tanlc and dbox 24.Manhole covers within 6"of grade, um cha.mber cover to grade � _ 25.Ins ection ort on lastic chambers/leach field �,_ ', 26. Electrical ermit for um chamber/S arate meter for du lexes 27.Pum system-2" line,wee hole,check valve,tee in dbo�pum size 28. S tic tank/pum chamber to be facto waterproofed 29.Vent rovided if leaching below 3 feet, under driveway/ arkin � 30. Buoyancy calculations for tank/pump chamber �'"- ' 31.En ' eer to ins ect and c ' soils: wall: commercial: � 32.Engineer/Re 'stered Sanitarian and Land Surveyor stam s/si ature _ � 33.H-20 loading is sub'ect to vehiculaz traffic, oundwater i 34.Title V A lication and ermit fee, insta.11er si ture �_ 35.Foundation footin min. 2 feet above adjusted ound water for new house _� , 36.Deed Restriction r uired max. #bedrooms:Z max. flow: � % d ' 37.Check area lots for oundwater/Label oundwater in Assessor's Ma �� � Plan reviewed by: � 6/03/03 I I