HomeMy WebLinkAbout2015 Nov 05,06 - Emails with D.Meyer, RSi
� .
�
vonHone, Amy
From: vonHone,Amy
Sent: Friday, November 06, 2015 11:28 AM
To: 'Darren Meyer'
Subject: RE: 28 Charles Street
Spoke with Conservation:
. Place a work limit line seaward of the cesspools-between the 8 and 9 foot contour '
. Provide the setback to wetlands (coastal bank and marsh)from the leach facility and septic tank
��' . Show the Mean High Water mark and elevation (hopefully John picked that up with his survey-most of
� ' them do)
p��,� Show the 200' Riverfront offset from the Mean High Water Line
�,r� � Label the 100 year Flood Zone on the site plan -the EL. 11 contour
�'�.-6. Add "by hand" to note 10 on page 2
�-7. Add your spot elevations for the saltmarsh edge
Talk to me first if there is something on this list that you don't have. I will be giving Conservation a copy to ';
administratively approve and place in their file which allows these septic upgrades to be approved without any
hearings. ;
Amy
Amy L.von Hone, R.S., C.H.O.
Assistant Health Director
Yarmouth Health Department
From: Darren Meyer [mailto:dmeyer369Ca�comcast.net] j
Sent: Thursday, November 05, 2015 11:13 AM
To: vonHone, Amy
Subject: Re: 28 Charles Street
Ok, realtor's upset now,thinking I screwed up the plans....so tired of dealing with realtors. �
I'll get them over once we get the feedback from Kerry.
On Nov 5, 2015, at 10:52 AM,vonHone,Amy<AVonHone@varmouth.ma.us>wrote:
YeS
Amy L.von Hone, R.S.,C.H.0.
Assistant Health Director
Yarmouth Health Department
From: Darren Meyer [mailto:dmeyer369@comc�st.netl
Sent: Thursday, November 05, 2015 10:52 AM ;
To: vonHone, Amy �
Subject: Re: 28 Charles Street
Just so I'm clear,you want revised plans,with these items shown, right?
1 i
�
i
i
�