Loading...
HomeMy WebLinkAbout40.87.2 - Site Plan and Septic System Designi. I`- 32' T.O.F. 12' --1 9' max ACCESS MANHOLES TO WITHIN 6" OF FINISHED GRADE 10" 14"f GAS BAFFLE min. ELEV. ELEV.. 48.1 ELEV. 49.3 1500 GAL. DB -6 SEPTIC TANK SYSTEM PROFILE_ Not to scale 50. Bench Mark 5 on PK nail EI 50.2 49 5o.3 Ra 50.1 s' F Use Cuttec Filter Fabric 410 over Insp. Alt Chambers Port I Use Clean Medium Sand Around and for 6' Above Chambers SYSTEM DESIGN F.9 EE °0000 0000000000- ELEV. 47.4 30.2'x 15'x 0.5'deep Field � 1 5 Rows of 4 Cultec 100 Chambers 5.1' STONELESS-CULTEC CHAMBER FIELD I ELEV. 42.3 �9 � Adj. High GW a0 N� 50. L 1j�,�`.49.4 ` 50. 5a N tK 5 AH�e ti� e 50. Stk PROPOSED HOUSE TOF ® EI. 52.3 01, 2 49.4 G� OP 6'i O o. \ �ti SO "` 49.1 5' Overdig Limit \ \ TH#1 TI'q2 1 4 1 .^ 49.6 .t� .ro e� Design Flow: 4 bedrooms ( 110 gal/day = 440 gal. Septic Tank: 440 gal. x 200% = 880 gal. Use: 1500 Gal. Tank Leaching Facility: 5 Rows Of Cultec 100 Chambers (30.2' Long Rows) Proposed Area: 5 x30.2 LF of Chamber x 5sf/If = 755 sf Capacity: 755 sf x 0.74 gal/lsf = 558 gal. *Per Moss.DEP Certification For General Use NOTE: Garbage disposal is not permitted with this design. SEPTIC SYSTEM NOTES 1.) ALL COMPONENTS ARE TO MEET TITLE 5 MATERIAL AND CONSTRUCTION REQUIREMENTS. 2.) SYSTEM COMPONENTS ARE TO BE SET ON A STABLE BASE. 3.) UNSUITABLE SOILS ARE TO BE REMOVED, WHERE ENCOUNTERED BELOW ELEV.48.0, FOR 5' AROUND SAS AND REPLACED WITH APPROVED TITLE -5 FILL SOIL. 4.) DESIGN ENGINEER TO CERTIFY SOILS OF ALL SAS EXCAVATIONS BEFORE SYSTEM INSTALLATION. 5.) DESIGN ENGINEER TO CERTIFY SYSTEM INSTALLATION (ELEVATIONS & LOCATIONS) PRIOR TO BACKFILLING. 6.) DIST.BOX TO BE WATER TESTED AT TIME OF HEALTH AGENT INSPECTION. *7.) INSPECTION PORT IS TO MATCH DETAIL SPECS. Concrete 49.3 Co-er 4"PVC Pipe ADS Manhole 4" Perforated Pi e Accu er Hole Q„ E.L. 49.4 FILE C®Py LOCATION MAP Assessors Map 40 Parcel 87.2 TEST HOLE 1 0., EL. 49.1 5" 15' 13 120" TEST HOLE 2 o.• EL. 49.1 5.. 15' FAX A Loamy Sand 10YR3/2 BLoamy Loamy Sand B 10YR4/4 - C1 Fine Sand C1 10YR6/7 Q _groundwater fr _ S/ 42.T Elev. 39_1 120" TEST HOLE 2 o.• EL. 49.1 5.. 15' FAX G 0 Chamber Inside Chamber p 120' - Use min.: 2- 3/8" Hales PERCOLATION TEST @ TH# 1 ®2" vert.spaang INSP. PORT DETAIL 24 GALLONS OF WATER IN 4 MINUTES AND 108" Q groundwater fnd 27 SECONDS AT A DEPTH OF 60 INCHES. ; Eiev-4b d Perc. Rate: <2min/inch Y,memouth Health Department 120'= DATE: 3/24/10 APPROVED DATE: 10/22/11 PerformeMartin E. Moran, PE Dan Croteau, PE y Witness: Amy VonHone, HA 19�4� ROUNDWATER ADJ ( 10/ 1 1) GROUNDWATER ADJ. (3/10) /pp ' SAS CONSTRUCTION DETAIL Groundwater Found : Et. 40.4 Groundwater Found ; E L 42.1 Index Wei t: MIW-29 Index Wel l: MIW-29 Zone A ( 9/11, 8. 6' ) => + 1.9' Zone A ( 3/10, 6. 0' ) => + 0.2' LOT 1 "U L T 'v 1111"1 Adj. 6. W, depth = E t, 42.3 Adj. G.W, depth = E L. 42.3 26,460+L-AC SQ. 49.1 Insp. Port Fabric over Chambers &r 1xoEt..,rt 0.61 +RE and Riser *Use Clean Medium Sand [\/�IOR A N E N G I N E E R I N G, I N C .� oA*,1c� .. _a9 (See Detail) Around and for 6" Above u v -- - P.CROTFAU Chambers 941 MAI N STREET, SO. HARWICH, MA 02661 ` cN1� Mo.?3253 _ -f 432-2878 { " Jho Fri..eF .�U ss SITE PLAN & SEPTIC SYSTEM DESIGN IN YARMOUTH i + •• Prepared For O " William Moran Y RMOU7�H MA Pti�ii�, .tri t ,; 80 WINSLOW GREY ROAD A 4-Cultec 100 Chambers x 486 30.2' �{ PROJECT: 11-089 SCALE: 1 " 20 JDATE: 1 1/22/1 7 `` k A Loamy Sand t0YR3/6 BLoamy Sand 10YR5/6 Medium/Fine C1 Sand t0YR6/4 _ S/ _ground_water fr Elev. 422 11 Elev. 39.1 G 0 Chamber Inside Chamber p 120' - Use min.: 2- 3/8" Hales PERCOLATION TEST @ TH# 1 ®2" vert.spaang INSP. PORT DETAIL 24 GALLONS OF WATER IN 4 MINUTES AND 108" Q groundwater fnd 27 SECONDS AT A DEPTH OF 60 INCHES. ; Eiev-4b d Perc. Rate: <2min/inch Y,memouth Health Department 120'= DATE: 3/24/10 APPROVED DATE: 10/22/11 PerformeMartin E. Moran, PE Dan Croteau, PE y Witness: Amy VonHone, HA 19�4� ROUNDWATER ADJ ( 10/ 1 1) GROUNDWATER ADJ. (3/10) /pp ' SAS CONSTRUCTION DETAIL Groundwater Found : Et. 40.4 Groundwater Found ; E L 42.1 Index Wei t: MIW-29 Index Wel l: MIW-29 Zone A ( 9/11, 8. 6' ) => + 1.9' Zone A ( 3/10, 6. 0' ) => + 0.2' LOT 1 "U L T 'v 1111"1 Adj. 6. W, depth = E t, 42.3 Adj. G.W, depth = E L. 42.3 26,460+L-AC SQ. 49.1 Insp. Port Fabric over Chambers &r 1xoEt..,rt 0.61 +RE and Riser *Use Clean Medium Sand [\/�IOR A N E N G I N E E R I N G, I N C .� oA*,1c� .. _a9 (See Detail) Around and for 6" Above u v -- - P.CROTFAU Chambers 941 MAI N STREET, SO. HARWICH, MA 02661 ` cN1� Mo.?3253 _ -f 432-2878 { " Jho Fri..eF .�U ss SITE PLAN & SEPTIC SYSTEM DESIGN IN YARMOUTH i + •• Prepared For O " William Moran Y RMOU7�H MA Pti�ii�, .tri t ,; 80 WINSLOW GREY ROAD A 4-Cultec 100 Chambers x 486 30.2' �{ PROJECT: 11-089 SCALE: 1 " 20 JDATE: 1 1/22/1 7 `` k