HomeMy WebLinkAbout93.11 - HVAC Basement Plan and Detailsa
REFER TO d
1
BOILER VENT AND
EXHAUST UP THROUGH
ROOF (SEE DETAIL) HWS AND HWR MANIFOLD
FOR BASEMENT RADIANT
NEAT.
Ir
----Il-----------------------------
i l l l l l l l l l I I I I I I I
I I I I I I I ( I I I I I I I I II I I I I I I
I I I I I I I I I I I I I I I I I I I I I I
I I I I I I I I I I I I I I I I I I I I I
RADIANT HEAT
THERMOSTAT I I I I I I I I I I I I I I I
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
I I I I I I I I I I I I I I I I
1%4 NWS/HWR
RISERS TO HW— 1
I I I I I I I I I I I I I I I I I I I I
AND HW -3
I l l l l l l l l i l l l l l l l l l l l l l l
I I I I I I I I
I I I I I I I
I I I I I I I I
I I I I I I
I I I I I I I
1 " HWS/HWR RISERS
UP TO H11-2 \
1/4" HIIJS/HWR
FROM HW -1
AND_ HW -3
I
BASEMENT — PART PLAN
I i I I i i I SCALE: 1/4"=1'-0"
Ilt'-SLAB RADIA%? HEAT
TUBING SIZED �.' I j I j / P/
1"
%2" WATTS PEX TUBING SECURED
CONCRETE SLAB TO REWIRE/REBAR
SPACING PER MFGR
V Q a d
a
s d
d'
I" MINIMUM EXTRUDED POLYSTYRENE
INSULATING BOARD
IN—SLAB RADIANT TUBING
NO SCALE BASED ON WATTS
FLASHING AND SEAL
WATER TIGHT BY GC
MIN 12" /
AND MAX 24" i
ABOVE ROOF
ROOF i I —SECURE TO PREVENT
MOVEMENT
CONCENTRIC TERMINAL
PER MANUFACTURER'S
INSTRUCTIONS
cvun,or____ AIR INTAKE
NOTES:
VENT AND EXHAUST SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH
THE MANUFACTURERS INSTRUCTIONS AND THE FURNACE LISTING.
BOILER VENT TERMINATION
NO SCALE VERTICAL APPLICAT 0,%'
` P/2" FROM HW -1,
HW -2 AND HW -3
fBALL VALVE=__�
(TYPICAL)
111YINIG VALVE
(TYPICAL)
THEP,IM0.4f_,7ER -- b
(TYPICAL)
RAA' :ANT ZO.NE�
CIRCULATOR (TYP)
CHECK VALVE
P/2 "
ZI
3/9"WATTS STAPLE—UP -
TUBING (FLOOR WARMING ONLY)
FINISH FLOOP SUB—FLOOR
O 2"-4" SPACE BETWEEN TOP
JOIST OF FOIL FACE AND SUB—FLOOR
FOIL FACED FIBERC{ASS'
INSULATION (FACE 'JP)
STAPLE—UP RADIANT TUBING
NO SCALE BASED ON WATTS
NANUFACTUREF_ S
IIIIIIIiII li�Uillllll
SOFTWARE. I I I I I I I
I I I I I I I I
I I I I I I I I
I I I I I I I I
I I I I I I I I
I I I I I I I I
l i i i l
I I I I I I I I
WARNINGS
z
THE GC MUST BE INFORMED THAT CRACCS WILL DEVELOP IN THE BASEMENT CONCRETE SLAB WITHOUT
IIIIIIII' ! i;llllll
PREVENTATIVE MEASURES SUCH AS PROI.'3 "G EXPANSION JOINTS. THE LOCATION OF ALL EXPANSION JOINTS
MUST BE CONVEYED TO THE HVAC CONT r "TOR SINCE LEAKS IN RADIANT TUBING WILL DEVELOP IF
C7
W
PRECAUTIONARY IMEASU.PES ARE NOT TAT=': TO PROPERLY OFFSET TUBING BELOW THE SLAB JOINT.
IIIIIII'� :IIIIIIII
IIIIII'i lillllllll
IIIIIIII:II'.'1i!I!IIIIII
DO NOT INSTALL ANY PIP/,':G ON THE CC_. SIDE OF THE BUILDING INSULATION OR VAPOR BARRIER. REPORT TO
W
THE GC ANY AREAS THAT ARE NOT /NSU: A -=D PROPERLY AND COULD POTENTIALLY FREEZE PIPES.
EXCEPTION: PIPING W,H'CH !MUST BE INST-'LLED ON THE COLD SIDE OF THE BUILDING INSULATION OR ITS VAPOR
BARRIER MUST EE PROV,DED WITH A MIX ;=E OF WATER, AND PROPYLENE GLYCOL SUFFICIENT TO PREVENT
o
FREEZING DOWN TO -10• F.
THE GC MUST BE /NFOPYED THAT THE FCT`JT'AL FOR CRACKING FINISHED FLOORS AND SPLITTING JOINTS IS
LO
GREATER WHEN RADIANT FLOOR WARMING S"STEMS ARE INSTALLED. THE FINISH FLOORING MATERIAL
M
MANUFACTURERS' AND RJSTALLERS' MUS °_ INFORMED THAT RADIANT TUBING /S PLANNED TO BE UNDER
STAPLED TO THE BUILD1°1G SUBFLOOR.
THE GC MUST BE INFO PED THERE /S 1.�j PLAN BY THE HVAC CONTRACTOR TO INSTALL HEAT IN ANY
UNFINISHED AREAS, AND TI -IAT PIPING IA'STr_LED IN THESES AREAS HAS THE POTENTIAL TO FREEZE.
W
THE HVAC CONTRACTOR SHOULD SHUT -C7= THE BOILER MAKE-UP WATER SUPPLY AFTER THE SYSTEM HAS
Co Co
BEEN THOROUGHLY FILLED AND PURGED A;., HAS OPERATED /N THE HEATING MODE OF A MINIMUM OF ONE
L3
WEEK.
`1
780 CMR
o
CODE NOTES
ti a
°'z
� 1
THESE PLANS WERE DE✓ELOPED AND AF= CLING ISSUED FOR PERMIT WITH NO PROVISIONS FOR THE BUILDING
W
CORE BEING CLASSIFIED AS A ATRIUM S SCS NOR FOR IT REQUIRING PROTECTION AS A SHAFT ENCLOSURE.
UNLESS OTHERWISE INFORMED TO THE CO%TRARY BY THE BUILDING DEPARTMENT NO CHANGES WILL BE MADE.
co
WI
1"
%2" WATTS PEX TUBING SECURED
CONCRETE SLAB TO REWIRE/REBAR
SPACING PER MFGR
V Q a d
a
s d
d'
I" MINIMUM EXTRUDED POLYSTYRENE
INSULATING BOARD
IN—SLAB RADIANT TUBING
NO SCALE BASED ON WATTS
FLASHING AND SEAL
WATER TIGHT BY GC
MIN 12" /
AND MAX 24" i
ABOVE ROOF
ROOF i I —SECURE TO PREVENT
MOVEMENT
CONCENTRIC TERMINAL
PER MANUFACTURER'S
INSTRUCTIONS
cvun,or____ AIR INTAKE
NOTES:
VENT AND EXHAUST SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH
THE MANUFACTURERS INSTRUCTIONS AND THE FURNACE LISTING.
BOILER VENT TERMINATION
NO SCALE VERTICAL APPLICAT 0,%'
` P/2" FROM HW -1,
HW -2 AND HW -3
fBALL VALVE=__�
(TYPICAL)
111YINIG VALVE
(TYPICAL)
THEP,IM0.4f_,7ER -- b
(TYPICAL)
RAA' :ANT ZO.NE�
CIRCULATOR (TYP)
CHECK VALVE
P/2 "
ZI
3/9"WATTS STAPLE—UP -
TUBING (FLOOR WARMING ONLY)
FINISH FLOOP SUB—FLOOR
O 2"-4" SPACE BETWEEN TOP
JOIST OF FOIL FACE AND SUB—FLOOR
FOIL FACED FIBERC{ASS'
INSULATION (FACE 'JP)
STAPLE—UP RADIANT TUBING
NO SCALE BASED ON WATTS
3—WAY DIVERTING VALVE (POWER
OFF) OPEN TO THE COIL (BASED
B
ON ERIE VT/VS POPTOP SERIES)
c COMBINATION BALANCING/
SHUT—OFF VALVE
A
HWS
HWR
I
I" HWS/HWR
BALL VALVE TO HW -2
HW COIL PIPING DETAIL
NO SCALE BASED ON ERIE
TY.?'CAL FOR HV✓ -1 THOUGH HW -3
1%4
AIR EL/MINAT O4 EQUAL TO
SPIRO VENT v r? -150 Tl.l
MAXIMUM DISTANCE BETWEEN
TEE FITTINGS = 4 PIPE
DIAMETERS
1%2
r,
-17
ri
PURGE AND
FILL
PRIMARY
CIRCULATOR
TACO 0111
TO UNDERSALB TO 1st FLR TO 2nd FLR
HEATING WARMING WARMING
MANIFOLDS MANIFOLDS MANIFOLDS
CODE NOTES
O 3rj TO% PETALS PRODUCTS GAS SERVICE VALVE
MCDEL GSCT0758302 (3/4')
MA PLUI✓9,1NG BOARD APPROVAL CODE P3-0207-279
O H T T; ANS=ER PRODUCTS MUNCHKIN BOILER MODEL 199M
INPUT MODULArrON - 66 MBH - 199 MBH
MA PLUYB'NG BOARD APPROVAL CODE C3-0305-141
DRIP
LEGS j
1%2»
_
BALANCING/SHUT-OFF
VALVE (TYP)
SECONDARY CIRCULATOR
EQUAL TO TACO 0111
1 %2" TO HW -1,
HW -2 AND HW -3
u
Y2'CW SUPPLY WITH BACKFLOW
PROTECTION BY PC
-- --
FEED WATER REGULATOR, EQUAL TO
I WATTS BRONZE MODEL S31156F
D/APH''.AGV TYPE EXPANSION
TANK EQUAL TO TACO EXT -50
3,/4" GAS SERVICE
1
VALVE
3/4 " L:N.ON O
/3/t Y %2' ! 2
_— PRESSURE RELIEF
VALVE
CONDENSATE PUMP WITH
DISCHARGE CHECK PIPED
t TO PLUMBING RECEPTOR,
PROVIDE BY PC
BOILER PIPING DETAIL
NO SCALE
IIIIIIIiII li�Uillllll
IIIIIIIIIII :11!11111
z
IIIIIIII' ! i;llllll
IIIIIIII 1!111111
C7
W
IIIIIII'� :IIIIIIII
IIIIII'i lillllllll
IIIIIIII:II'.'1i!I!IIIIII
W
IIIIIIIIIII"' IIIIIIII
IIIIIIIIII IIIIIIII
3—WAY DIVERTING VALVE (POWER
OFF) OPEN TO THE COIL (BASED
B
ON ERIE VT/VS POPTOP SERIES)
c COMBINATION BALANCING/
SHUT—OFF VALVE
A
HWS
HWR
I
I" HWS/HWR
BALL VALVE TO HW -2
HW COIL PIPING DETAIL
NO SCALE BASED ON ERIE
TY.?'CAL FOR HV✓ -1 THOUGH HW -3
1%4
AIR EL/MINAT O4 EQUAL TO
SPIRO VENT v r? -150 Tl.l
MAXIMUM DISTANCE BETWEEN
TEE FITTINGS = 4 PIPE
DIAMETERS
1%2
r,
-17
ri
PURGE AND
FILL
PRIMARY
CIRCULATOR
TACO 0111
TO UNDERSALB TO 1st FLR TO 2nd FLR
HEATING WARMING WARMING
MANIFOLDS MANIFOLDS MANIFOLDS
CODE NOTES
O 3rj TO% PETALS PRODUCTS GAS SERVICE VALVE
MCDEL GSCT0758302 (3/4')
MA PLUI✓9,1NG BOARD APPROVAL CODE P3-0207-279
O H T T; ANS=ER PRODUCTS MUNCHKIN BOILER MODEL 199M
INPUT MODULArrON - 66 MBH - 199 MBH
MA PLUYB'NG BOARD APPROVAL CODE C3-0305-141
DRIP
LEGS j
1%2»
_
BALANCING/SHUT-OFF
VALVE (TYP)
SECONDARY CIRCULATOR
EQUAL TO TACO 0111
1 %2" TO HW -1,
HW -2 AND HW -3
u
Y2'CW SUPPLY WITH BACKFLOW
PROTECTION BY PC
-- --
FEED WATER REGULATOR, EQUAL TO
I WATTS BRONZE MODEL S31156F
D/APH''.AGV TYPE EXPANSION
TANK EQUAL TO TACO EXT -50
3,/4" GAS SERVICE
1
VALVE
3/4 " L:N.ON O
/3/t Y %2' ! 2
_— PRESSURE RELIEF
VALVE
CONDENSATE PUMP WITH
DISCHARGE CHECK PIPED
t TO PLUMBING RECEPTOR,
PROVIDE BY PC
BOILER PIPING DETAIL
NO SCALE
T1
U
rn
O M y
z
w�
� c7 w
lr�b
�, bb P
�'b.`.,NO4vwo9
C7
W
T1
U
rn
z
z
O
W
cu
L L1
o
H
I—
LO
M
m
W
W
H
Co Co
CD
L3
I
z
m
W
-I
m
co
WI
0
Q
Lo
o
v
ry
CJ
v
=
F
-i
W
X
Q
W
L3
o
~
H
pq
"
H
W
W
2
>
0i
E1
� w
E -q �
r4U
Y Y'
X�-N n 5
.10��
P
Q+'
Psi
DRAWING TITLE:
HVAC
BASEMENT PLAN
AND DETAILS
DESIGNED BY:
GD
CHECKED BY:
DAG
DATE:
6-12-07
REVISED:
PROJECT NO.
48734
SHEET
H-1
1 OF 3