Loading...
HomeMy WebLinkAbout93.11 - HVAC Basement Plan and Detailsa REFER TO d 1 BOILER VENT AND EXHAUST UP THROUGH ROOF (SEE DETAIL) HWS AND HWR MANIFOLD FOR BASEMENT RADIANT NEAT. Ir ----Il----------------------------- i l l l l l l l l l I I I I I I I I I I I I I I ( I I I I I I I I II I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I RADIANT HEAT THERMOSTAT I I I I I I I I I I I I I I I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I I I I I I I I I I 1%4 NWS/HWR RISERS TO HW— 1 I I I I I I I I I I I I I I I I I I I I AND HW -3 I l l l l l l l l i l l l l l l l l l l l l l l I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 1 " HWS/HWR RISERS UP TO H11-2 \ 1/4" HIIJS/HWR FROM HW -1 AND_ HW -3 I BASEMENT — PART PLAN I i I I i i I SCALE: 1/4"=1'-0" Ilt'-SLAB RADIA%? HEAT TUBING SIZED �.' I j I j / P/ 1" %2" WATTS PEX TUBING SECURED CONCRETE SLAB TO REWIRE/REBAR SPACING PER MFGR V Q a d a s d d' I" MINIMUM EXTRUDED POLYSTYRENE INSULATING BOARD IN—SLAB RADIANT TUBING NO SCALE BASED ON WATTS FLASHING AND SEAL WATER TIGHT BY GC MIN 12" / AND MAX 24" i ABOVE ROOF ROOF i I —SECURE TO PREVENT MOVEMENT CONCENTRIC TERMINAL PER MANUFACTURER'S INSTRUCTIONS cvun,or____ AIR INTAKE NOTES: VENT AND EXHAUST SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS AND THE FURNACE LISTING. BOILER VENT TERMINATION NO SCALE VERTICAL APPLICAT 0,%' ` P/2" FROM HW -1, HW -2 AND HW -3 fBALL VALVE=__� (TYPICAL) 111YINIG VALVE (TYPICAL) THEP,IM0.4f_,7ER -- b (TYPICAL) RAA' :ANT ZO.NE� CIRCULATOR (TYP) CHECK VALVE P/2 " ZI 3/9"WATTS STAPLE—UP - TUBING (FLOOR WARMING ONLY) FINISH FLOOP SUB—FLOOR O 2"-4" SPACE BETWEEN TOP JOIST OF FOIL FACE AND SUB—FLOOR FOIL FACED FIBERC{ASS' INSULATION (FACE 'JP) STAPLE—UP RADIANT TUBING NO SCALE BASED ON WATTS NANUFACTUREF_ S IIIIIIIiII li�Uillllll SOFTWARE. I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I l i i i l I I I I I I I I WARNINGS z THE GC MUST BE INFORMED THAT CRACCS WILL DEVELOP IN THE BASEMENT CONCRETE SLAB WITHOUT IIIIIIII' ! i;llllll PREVENTATIVE MEASURES SUCH AS PROI.'3 "G EXPANSION JOINTS. THE LOCATION OF ALL EXPANSION JOINTS MUST BE CONVEYED TO THE HVAC CONT r "TOR SINCE LEAKS IN RADIANT TUBING WILL DEVELOP IF C7 W PRECAUTIONARY IMEASU.PES ARE NOT TAT=': TO PROPERLY OFFSET TUBING BELOW THE SLAB JOINT. IIIIIII'� :IIIIIIII IIIIII'i lillllllll IIIIIIII:II'.'1i!I!IIIIII DO NOT INSTALL ANY PIP/,':G ON THE CC_. SIDE OF THE BUILDING INSULATION OR VAPOR BARRIER. REPORT TO W THE GC ANY AREAS THAT ARE NOT /NSU: A -=D PROPERLY AND COULD POTENTIALLY FREEZE PIPES. EXCEPTION: PIPING W,H'CH !MUST BE INST-'LLED ON THE COLD SIDE OF THE BUILDING INSULATION OR ITS VAPOR BARRIER MUST EE PROV,DED WITH A MIX ;=E OF WATER, AND PROPYLENE GLYCOL SUFFICIENT TO PREVENT o FREEZING DOWN TO -10• F. THE GC MUST BE /NFOPYED THAT THE FCT`JT'AL FOR CRACKING FINISHED FLOORS AND SPLITTING JOINTS IS LO GREATER WHEN RADIANT FLOOR WARMING S"STEMS ARE INSTALLED. THE FINISH FLOORING MATERIAL M MANUFACTURERS' AND RJSTALLERS' MUS °_ INFORMED THAT RADIANT TUBING /S PLANNED TO BE UNDER STAPLED TO THE BUILD1°1G SUBFLOOR. THE GC MUST BE INFO PED THERE /S 1.�j PLAN BY THE HVAC CONTRACTOR TO INSTALL HEAT IN ANY UNFINISHED AREAS, AND TI -IAT PIPING IA'STr_LED IN THESES AREAS HAS THE POTENTIAL TO FREEZE. W THE HVAC CONTRACTOR SHOULD SHUT -C7= THE BOILER MAKE-UP WATER SUPPLY AFTER THE SYSTEM HAS Co Co BEEN THOROUGHLY FILLED AND PURGED A;., HAS OPERATED /N THE HEATING MODE OF A MINIMUM OF ONE L3 WEEK. `1 780 CMR o CODE NOTES ti a °'z � 1 THESE PLANS WERE DE✓ELOPED AND AF= CLING ISSUED FOR PERMIT WITH NO PROVISIONS FOR THE BUILDING W CORE BEING CLASSIFIED AS A ATRIUM S SCS NOR FOR IT REQUIRING PROTECTION AS A SHAFT ENCLOSURE. UNLESS OTHERWISE INFORMED TO THE CO%TRARY BY THE BUILDING DEPARTMENT NO CHANGES WILL BE MADE. co WI 1" %2" WATTS PEX TUBING SECURED CONCRETE SLAB TO REWIRE/REBAR SPACING PER MFGR V Q a d a s d d' I" MINIMUM EXTRUDED POLYSTYRENE INSULATING BOARD IN—SLAB RADIANT TUBING NO SCALE BASED ON WATTS FLASHING AND SEAL WATER TIGHT BY GC MIN 12" / AND MAX 24" i ABOVE ROOF ROOF i I —SECURE TO PREVENT MOVEMENT CONCENTRIC TERMINAL PER MANUFACTURER'S INSTRUCTIONS cvun,or____ AIR INTAKE NOTES: VENT AND EXHAUST SYSTEM SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS INSTRUCTIONS AND THE FURNACE LISTING. BOILER VENT TERMINATION NO SCALE VERTICAL APPLICAT 0,%' ` P/2" FROM HW -1, HW -2 AND HW -3 fBALL VALVE=__� (TYPICAL) 111YINIG VALVE (TYPICAL) THEP,IM0.4f_,7ER -- b (TYPICAL) RAA' :ANT ZO.NE� CIRCULATOR (TYP) CHECK VALVE P/2 " ZI 3/9"WATTS STAPLE—UP - TUBING (FLOOR WARMING ONLY) FINISH FLOOP SUB—FLOOR O 2"-4" SPACE BETWEEN TOP JOIST OF FOIL FACE AND SUB—FLOOR FOIL FACED FIBERC{ASS' INSULATION (FACE 'JP) STAPLE—UP RADIANT TUBING NO SCALE BASED ON WATTS 3—WAY DIVERTING VALVE (POWER OFF) OPEN TO THE COIL (BASED B ON ERIE VT/VS POPTOP SERIES) c COMBINATION BALANCING/ SHUT—OFF VALVE A HWS HWR I I" HWS/HWR BALL VALVE TO HW -2 HW COIL PIPING DETAIL NO SCALE BASED ON ERIE TY.?'CAL FOR HV✓ -1 THOUGH HW -3 1%4 AIR EL/MINAT O4 EQUAL TO SPIRO VENT v r? -150 Tl.l MAXIMUM DISTANCE BETWEEN TEE FITTINGS = 4 PIPE DIAMETERS 1%2 r, -17 ri PURGE AND FILL PRIMARY CIRCULATOR TACO 0111 TO UNDERSALB TO 1st FLR TO 2nd FLR HEATING WARMING WARMING MANIFOLDS MANIFOLDS MANIFOLDS CODE NOTES O 3rj TO% PETALS PRODUCTS GAS SERVICE VALVE MCDEL GSCT0758302 (3/4') MA PLUI✓9,1NG BOARD APPROVAL CODE P3-0207-279 O H T T; ANS=ER PRODUCTS MUNCHKIN BOILER MODEL 199M INPUT MODULArrON - 66 MBH - 199 MBH MA PLUYB'NG BOARD APPROVAL CODE C3-0305-141 DRIP LEGS j 1%2» _ BALANCING/SHUT-OFF VALVE (TYP) SECONDARY CIRCULATOR EQUAL TO TACO 0111 1 %2" TO HW -1, HW -2 AND HW -3 u Y2'CW SUPPLY WITH BACKFLOW PROTECTION BY PC -- -- FEED WATER REGULATOR, EQUAL TO I WATTS BRONZE MODEL S31156F D/APH''.AGV TYPE EXPANSION TANK EQUAL TO TACO EXT -50 3,/4" GAS SERVICE 1 VALVE 3/4 " L:N.ON O /3/t Y %2' ! 2 _— PRESSURE RELIEF VALVE CONDENSATE PUMP WITH DISCHARGE CHECK PIPED t TO PLUMBING RECEPTOR, PROVIDE BY PC BOILER PIPING DETAIL NO SCALE IIIIIIIiII li�Uillllll IIIIIIIIIII :11!11111 z IIIIIIII' ! i;llllll IIIIIIII 1!111111 C7 W IIIIIII'� :IIIIIIII IIIIII'i lillllllll IIIIIIII:II'.'1i!I!IIIIII W IIIIIIIIIII"' IIIIIIII IIIIIIIIII IIIIIIII 3—WAY DIVERTING VALVE (POWER OFF) OPEN TO THE COIL (BASED B ON ERIE VT/VS POPTOP SERIES) c COMBINATION BALANCING/ SHUT—OFF VALVE A HWS HWR I I" HWS/HWR BALL VALVE TO HW -2 HW COIL PIPING DETAIL NO SCALE BASED ON ERIE TY.?'CAL FOR HV✓ -1 THOUGH HW -3 1%4 AIR EL/MINAT O4 EQUAL TO SPIRO VENT v r? -150 Tl.l MAXIMUM DISTANCE BETWEEN TEE FITTINGS = 4 PIPE DIAMETERS 1%2 r, -17 ri PURGE AND FILL PRIMARY CIRCULATOR TACO 0111 TO UNDERSALB TO 1st FLR TO 2nd FLR HEATING WARMING WARMING MANIFOLDS MANIFOLDS MANIFOLDS CODE NOTES O 3rj TO% PETALS PRODUCTS GAS SERVICE VALVE MCDEL GSCT0758302 (3/4') MA PLUI✓9,1NG BOARD APPROVAL CODE P3-0207-279 O H T T; ANS=ER PRODUCTS MUNCHKIN BOILER MODEL 199M INPUT MODULArrON - 66 MBH - 199 MBH MA PLUYB'NG BOARD APPROVAL CODE C3-0305-141 DRIP LEGS j 1%2» _ BALANCING/SHUT-OFF VALVE (TYP) SECONDARY CIRCULATOR EQUAL TO TACO 0111 1 %2" TO HW -1, HW -2 AND HW -3 u Y2'CW SUPPLY WITH BACKFLOW PROTECTION BY PC -- -- FEED WATER REGULATOR, EQUAL TO I WATTS BRONZE MODEL S31156F D/APH''.AGV TYPE EXPANSION TANK EQUAL TO TACO EXT -50 3,/4" GAS SERVICE 1 VALVE 3/4 " L:N.ON O /3/t Y %2' ! 2 _— PRESSURE RELIEF VALVE CONDENSATE PUMP WITH DISCHARGE CHECK PIPED t TO PLUMBING RECEPTOR, PROVIDE BY PC BOILER PIPING DETAIL NO SCALE T1 U rn O M y z w� � c7 w lr�b �, bb P �'b.`.,NO4vwo9 C7 W T1 U rn z z O W cu L L1 o H I— LO M m W W H Co Co CD L3 I z m W -I m co WI 0 Q Lo o v ry CJ v = F -i W X Q W L3 o ~ H pq " H W W 2 > 0i E1 � w E -q � r4U Y Y' X�-N n 5 .10�� P Q+' Psi DRAWING TITLE: HVAC BASEMENT PLAN AND DETAILS DESIGNED BY: GD CHECKED BY: DAG DATE: 6-12-07 REVISED: PROJECT NO. 48734 SHEET H-1 1 OF 3