HomeMy WebLinkAbout134.3.3 - ElevationsASPHALT ROOF SHINGLES
RED CEDAR _� x
CLAPBOARD Q 4• T.W.
� m
r�
FRONT ELE"!=TION
CONTINUOUS FUDGE VENT
LEFT ELEVATION
1,P/,1'L�
RECEIVED,
FEB 24 2n;5
OWN CLERK r
YARMOUTH, MA
JAN2015
YRRIMOUTH
k's -ROVED
12 FEB 2 3 2015
YARMOUTH
GENERAL NOTES:
1. USE "TYVEK' OR EQUIVALENT ON ROOF AND SIDEWALLS.
2. BASEMENT UTILITY WINDOWS TO PROVIDE GLAZING TO MEET STATE REGULATIONS.
3. GUTTERS AND DOWNSPOUTS TO BE PROVIDED WHERE REQUIRED.
4. PROVIDE FLASHING ABOVE ALL WINDOWS AND DOORS.
5. DOUBLE JOISTS BELOW ALL PARTITION WALLS.
6. VENT ATTIC SPACE TO MEET STATE CODE REQUIREMENTS.
7. ALL CONCRETE TO BE A MINIMUM OF 2500 PSI STRENGTH AT 30 DAYS.
8. OWNER AND CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR CONSTRUCTION AND
CONFORMANCE WITH ALL STATE AND LOCAL RULES AND REGULATIONS.
INSULATION NOTE:
FLOORS ABOVE UNHEATED AND BELOW HEATED SPACE - 9" R-30 FIBERGLASS INSULATION OR BETTER.
FLAT CEILINGS ABOVE HEATED AND BELOW UNHEATED SPACE -12" R38 FIBERGLASS INSULATION OR
BETTER.
EXTERIOR WALLS ABUTTING HEATED SPACE - 5.5"R-21 FIBERGLASS INSULATION OR BETTER.
nee
LMis
DATE:
GRE INN DESIGN SCALE:
131 QUAKER k1EETINGHOUSE ROAD, EAST SANDWICH, MA 02537
www.greywing.com (508) 888-0886
ELEVATIONS
JAN 23 2014 PROJECT : LOT 3 WALDEN WAY, YARMOI
3 BEDROOM 2 112 BATH CAPE
114" = V-0"
Oub6ncompanies.com 508 430-4700
C 2014 GreyMna Design W8 RK-08ee SHEET:
nn.eroa.wa,Wawmv,.Bnwi.MPa+"rdm., PROJECT N0: G140101