Loading...
HomeMy WebLinkAbout24.14 - Site Plan of Land (Version 2)GENERAL NOTES: I. THIS PLAN /S FOR THE DESIGN AND CONSTRUCTION _ OF THE SEWAGE DISPOSAL SYSTEM AND PERMITTING ONL Y. 2, VERTICAL DATUM IS NGVD. FOR BENCH MARKS SET. SEE SITE PLAN. 3. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5.: ALL SEWER PIPE SHALL BE.SCHEDULE 40 OR APPROVED EQUAL. 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE AND WATERTIGHT. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 1-888-DIO-SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING CESSPOOLS TO BE PUMPED DRY AND REMOVED. 9. ALL UNSUITABLE MATERIAL (O.E 6 B HORIZONS) ENCOUNTERED BELOW THE INVERT OF THE LEACHING FACILITY TO BE REMOVED FOR A DISTANCE OF 5* AROUND AND REPLACED WITH SAND IN ACCORDANCE WITH TITLE S. 10. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS. SPECIAL PERMITS. VARIANCES ETC. FOR THIS PROJECT. I1. LOT IS WITHIN FLOOD HAZARD ZONE 8 AS PER MAP 250015 0005 D. DATED JULY 2. 1992. OCUS ACCESS COVERS MUST BE WITHIN 6' OF FINISH GRADE 14n ^ FIRST 2' 70 )J.a w/N BE LEVEL -7 I, t GAS L J \_LQ.a 10' 111 IFoI 9.. RAFFLE OUTLET 5 HIGH CAPrICITY INFILTRATOR BOX 3 O D UTL CHAMBERS W/3.5' STONE AROUND 1500 GAL l0'W X 38'1 X 10-d SEPTIC TANK 6' CRUSHED STONE BASE PROFILE : NOT TO SCALE 8' w 1E '�A.6 50 6- S3 « 6 EXISTING DWELLING TO GE REMOVED CESSPOOL / / / =d' p op e • � m w o 9` 10.56 z \ t!i O, v% 9' MINIMUM. 3- MAXIMUM COVER MIN 2' OF PEASTONE 3/4' - 1 I/2"DIA. WASHED STONE N 5 NIGH CAPACITY INFILTRATORS W/J.5's STONE AROWD SOIL REPOVAL `D -80X 1500 GAL SEPTIC TANK INVERT ELEVATIONS: INVERT AT BUILDING: 11.65 INVERT IN SEPTIC TANK: //.35 INVERT OUT SEPTIC TANK: II•I INVERT IN DIST. BOX: 10.97 INVERT OUT DIST. BOX: 10.8 INVERT 1N LEACH CHAMBER: 10.53 BOTTOM OF LEACH CHAMBER: 9.7 ADJUSTED GROUND WATER: 4.7 OBSERVED GROUND WATER: 4.3 BOTTOM OF TEST HOLE ♦l: 3.8 INDEX WELL M/W 29. ZONE A 4/98 - 6.3. 0.4' ADJUSTMENT DESIGN CRI TER IA: DESIGN FLOW: 3 BEDROOMS AT 1/0 G.P.D. PER BEDROOM EQUALS 330 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 330 G.P.D. X 200V - 660 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN, SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE f 5 MIN/INCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74-GPD/SF 330 GPD / 0.74 GPD/SF - 446 S.F. REQUIRED PROVIDED: 5 HIGH CAPACITY INFILTRATOR CHAMBERS W/J.5'3 STONE AROUND. A-460 S.F. 460 S.F.x 0.74 GPD/SF - 340 GPD SOIL TEST PIT DA TA e INDICATES INDICATES PERCOLATION OBSERVED TEST GROUNDWATER G CESSPOOL moi-. « I � � /71 � •J 'o, I 5 [r, L O T 9 pl ., 50 11723 3 S. F. oN s 66_W S/ TE_ PL A /V OF L A MD 10.4 £ 46 ACRES /A /VSE. �/M�AP / 9 FARCE -LA /W9 HYD TAO ROLT .673 ' ���y �/�� WE s T YA R / YI O U T H . I VI A . ELEV 13.2.211 NOVO DAv a (e' O PREPARED FOR S H� R � ENE T ESS � ER 10.43 t:'•7 C f ;,"�'. 45 LAKES / DE A VE. #5 . MARLBORO. MA 017-5.2 r1r �i v cH 'i S - iz,1 ..�,.�,ryJ,r�r=• .SCALE: / "- 20 MAY .5. /998 V.f EAGLE SURVEYING INC 923 Rout a 6A f, Yarmouthport MA. 02675 508 362-8 1 32 (508) 432-5333 0 10 20 40 JOB NO: 98-044 FIELD:CFW/EEK CALC: SAH/CFW CHECK: CFW DRN: SAH TP •l 0' .,_,,.__.. //.3 84't 4.3 90- ' L 3.8 DATE: APRIL 30. 1998 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PERC RATE: f 2 MIN/INCH 2 • .......................................... E LOAMY IOYR SAND 4/3 7 .......................................... 10.7 B LOAMY IOYR SAND5/B 24' .......................................... 9.3 MEDIUM IOYR Cl SAND 6/6 4,A 48' 84't 4.3 90- ' L 3.8 DATE: APRIL 30. 1998 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PERC RATE: f 2 MIN/INCH