Loading...
HomeMy WebLinkAbout143.105.16 - Site and Sewage PlanN 6P LOCUS LOCATION MAP LOT 26 40,826+ S.F. (0.94 t AC.) BENCHMARK AT FOOD STAKE ELEVATION = 44.7 ASSESSORS MAP: 143 PARCEL: 105-16 CURRENT ZONING: R-40 BUILDING SETBACKS: F: 30' S: 20' R: 20' FLOOD ZONE: C 1 II BENCHMARK AT �J PK NAIL ELEVATION = 40.0 4+� 40 I I I 34 r LORIZON O%Y SAND 5" ss ss.f d B HORIZON r LOAMY SAND r � 34[ r � MEDIUM SAND 72" 2.5Y 7/4 sol C2 HORIZON i MED -FINE SAND Tog" (TRACE OF SILT) SOA CS HORIZON 27 C3 HORIZON 1.38" MEDIUM SAND 25 1 4" 24 BLOWER VENT UTILITY T �r 40.6 41 a 2 FINISHED GRADE SEPTIC TANK 43. b 44 UTILITY ♦ � t \ p 4p• 0OP P9Y 45.5 t t t \ \ ® 50 48 50 \ ♦ opELLI�A! � t \ \ ♦ \ \ !tea 450 tt 50 A'zw DECx \ 'ffN a TH-2 rg \ \ t \ t \ \ 2 t 48 TH-1� t L r t t Be 1 _ r , 1 I i 34 1 1 I I I I I I I 1 I 3z 1 1 1 1 I t 1 I r I I I 34 , LORIZON O%Y SAND 5" ss DM '39 ss DEMAREST-MCLELLAN ENGINEERING 24 SCHOOL STREET P.D. BOX 463 FEST DENNIS, MASSACHUSETTS 02670 PHONE k FAX : (508) 398-7710 DM # 99-011- TH-3 B HORIZON LOAMY SAND 10YR 6/8 41_0 ELEV. TEST HOLE LOGS ENGINEER: DOWN CAPE ENGINEERING WITNESS: AMY VON HONE, R.S. DATE: 4-21-98 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 36.5 ELEV. AS 5 37.0 ELEV. 56.6 LORIZON O%Y SAND 5" Tom 5/2 ss.f d B HORIZON LOAMY SAND 28" IOYR 5/8 34[ Cl HORIZON MEDIUM SAND 72" 2.5Y 7/4 sol C2 HORIZON MED -FINE SAND Tog" (TRACE OF SILT) SOA CS HORIZON 27 C3 HORIZON 1.38" MEDIUM SAND 25 1 4" 24 AS 5 37.0 ELEV. 56.6 NO GROUND WATER ENCOUNTERED f NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NCVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. S. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 11. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOP,'. 12. SITE IS LOCATED WITHIN A NITROGEN SENNSITIVE AREA (ZONE 2) AND IS SUBJECT TO THE FOLLOWING RESTRICTIONS IN ACCORDANCE WITH THE TOWN OF YARMOUTH NITROGEN LOADING REGULATION: 4 BEDROOMS, 2000 SF OF LAWN AREA AND THE USE OF A FAST SYSTEM. THE CALCULATED RECHARGE NITROGEN CONCENTRATION IS 4.62 ppm. 13. IF UNSUITABLE SOIL IS ENCOUNTERED ((B HORIZON, APPROX.36" DEEP, TH-3) IT IS TO BE REhfOVED WITHIN 5' OF PROPOSED LEACH AREA AND SEPTIC SYSTEM DESIGN REPLACED WITH CLEAN MEDIUM SAND. 0 FLOW ESTIMATE. -4- BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 CAL/DAY SEPTIC TANK. 44 - CAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 PRECAST 500 GALLON CHAMBERS (8.5' x 4.8' x 2' DEEP) WITH 4' OF STONE ALL AROUND. (33.5'x 12.8'x 2' DEEP) SIDE AREA - _(45.3') 2 x 2 = 1E5 SF (.74) = 137 CAL/DALLY BOTTOM AREA: 33.5'x 12.8'= 429 SF (74) = 317 GAL/DAY CAPACITY = 454 GAL/DAY SEPTIC SYSTEM SECTION C1 HORIZON 1 MEDIUM SAND fi4" 2.6Y 7/6 31b 42 NO GROUND WATER t ENCOUNTERED t TEST HOLE LOG I t ENGINEER: THOMAS McLELLAN, P.E. 40 WITNESS: AMY VON HONE, R.S. DATE: 5-14-99 PERCOLATION RATE: < 2 MIN/IN 45D HTOP OF FOUNDATION COVERS WITHIN 12" OF (FINISHED GRADE gECOVER WITHIN bF FINISHED GRADE) 40.5 L==a ELEV. 3854 40.75 1500 CAL D -BOX ELEV. ELEV. SEPTIC TANK 39.11 (6" OF 41.0 (6" OF STONE UNDER OR ELEV. STONE ELEV. MECHANICALLY COMPACTED) UNDER) TEE SIZES: GAS BAFFLE AT OUTLET TEE INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN q KEY: X APPR6vED BY: DATE: J, EXISTING CONTOUR: - - - - ' PROPOSED CONTOUR: - -- - EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 se TEST HOLE: {)- UTILITY POLE: -0- FENCE LINE: - - HYDRANT: -6 RETAINING WALL: TREE: io RZ 4 �Ji. If.. N THOMAS MCLELLAN, P.E. JOHN Z. DEMAREST JR., P.L.S 22' 14' DECK 38' PROPOSED 4 BEDROOM 28, DWELLING 24, PROPOSED DWELLING 2" PEASTONE 3/4" - 1 1/2" �-WASHED STONE ELEV. 39.3 36.5 ELEV. f 33.5' --1- USE 3 PRECAST 500 GALLON CHAMBERS �8.5' x 4.8' x Z DEEP) WITH 4' OF STONE ALL AROUND. (33.5 x 12.8' x 2' DEEP) (4" PVC PIPE TO BE USED BETWEEN CHAMBERS) LOCATION 19 ALEXANDER DRIVE YARMOUTHPORT, IIIA PREPARED FOR PAUL & MARY JO GOVONI SCALE: 1"= 30' DATE: 3-17-99 REFERENCE: LAND COURT CASE #34995F SHEET i REVISED: 5-17-99 LOAHORIZON MY SAND 5" 10YR 5/2 B HORIZON LOA SAND 28" AR /8 - 34.', C1 HORIZON MEDIUM SAND 66" 2.5Y 7/6 31, C2 HORIZON LOAMY SAND 78• SYR 6/8 SOA CS HORIZON MED -COARSE SAND 1.38" 25 NO GROUND WATER ENCOUNTERED f NOTES: 1. VERTICAL DATUM: ASSUMED FROM QUAD (NCVD +/-) 2. MUNICAPAL WATER IS AVAILABLE. S. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH= 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0'. 11. D -BOX TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOP,'. 12. SITE IS LOCATED WITHIN A NITROGEN SENNSITIVE AREA (ZONE 2) AND IS SUBJECT TO THE FOLLOWING RESTRICTIONS IN ACCORDANCE WITH THE TOWN OF YARMOUTH NITROGEN LOADING REGULATION: 4 BEDROOMS, 2000 SF OF LAWN AREA AND THE USE OF A FAST SYSTEM. THE CALCULATED RECHARGE NITROGEN CONCENTRATION IS 4.62 ppm. 13. IF UNSUITABLE SOIL IS ENCOUNTERED ((B HORIZON, APPROX.36" DEEP, TH-3) IT IS TO BE REhfOVED WITHIN 5' OF PROPOSED LEACH AREA AND SEPTIC SYSTEM DESIGN REPLACED WITH CLEAN MEDIUM SAND. 0 FLOW ESTIMATE. -4- BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 CAL/DAY SEPTIC TANK. 44 - CAL/DAY x 2 DAYS = 880 GAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 3 PRECAST 500 GALLON CHAMBERS (8.5' x 4.8' x 2' DEEP) WITH 4' OF STONE ALL AROUND. (33.5'x 12.8'x 2' DEEP) SIDE AREA - _(45.3') 2 x 2 = 1E5 SF (.74) = 137 CAL/DALLY BOTTOM AREA: 33.5'x 12.8'= 429 SF (74) = 317 GAL/DAY CAPACITY = 454 GAL/DAY SEPTIC SYSTEM SECTION C1 HORIZON 1 MEDIUM SAND fi4" 2.6Y 7/6 31b 42 NO GROUND WATER t ENCOUNTERED t TEST HOLE LOG I t ENGINEER: THOMAS McLELLAN, P.E. 40 WITNESS: AMY VON HONE, R.S. DATE: 5-14-99 PERCOLATION RATE: < 2 MIN/IN 45D HTOP OF FOUNDATION COVERS WITHIN 12" OF (FINISHED GRADE gECOVER WITHIN bF FINISHED GRADE) 40.5 L==a ELEV. 3854 40.75 1500 CAL D -BOX ELEV. ELEV. SEPTIC TANK 39.11 (6" OF 41.0 (6" OF STONE UNDER OR ELEV. STONE ELEV. MECHANICALLY COMPACTED) UNDER) TEE SIZES: GAS BAFFLE AT OUTLET TEE INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN q KEY: X APPR6vED BY: DATE: J, EXISTING CONTOUR: - - - - ' PROPOSED CONTOUR: - -- - EXISTING SPOT ELEVATION: 25.5 PROPOSED SPOT ELEVATION: 25 se TEST HOLE: {)- UTILITY POLE: -0- FENCE LINE: - - HYDRANT: -6 RETAINING WALL: TREE: io RZ 4 �Ji. If.. N THOMAS MCLELLAN, P.E. JOHN Z. DEMAREST JR., P.L.S 22' 14' DECK 38' PROPOSED 4 BEDROOM 28, DWELLING 24, PROPOSED DWELLING 2" PEASTONE 3/4" - 1 1/2" �-WASHED STONE ELEV. 39.3 36.5 ELEV. f 33.5' --1- USE 3 PRECAST 500 GALLON CHAMBERS �8.5' x 4.8' x Z DEEP) WITH 4' OF STONE ALL AROUND. (33.5 x 12.8' x 2' DEEP) (4" PVC PIPE TO BE USED BETWEEN CHAMBERS) LOCATION 19 ALEXANDER DRIVE YARMOUTHPORT, IIIA PREPARED FOR PAUL & MARY JO GOVONI SCALE: 1"= 30' DATE: 3-17-99 REFERENCE: LAND COURT CASE #34995F SHEET i REVISED: 5-17-99